How to use the bathroom waterproof glue?

Question 1: What is the toilet waterproof glue? How to use it is glue, waterproof. Generally used with glue gun. King Star soft glue 300ml is toilet waterproof glue.

Question 2: If waterproof glue wants to solve the problem permanently, it's best to dig out the floor tiles, dig out the bottom of the tripod, clean it up and make it waterproof again. It is suggested that Gao De or Lei Bangshi be waterproof and do a 48-hour closed water experiment. Pay attention to the bricklaying guy, and don't nail it.

Question 3: What if waterproof glue doesn't work in the bathroom? I also found a similar problem. It is not estimated that the drill pipe or the leaking wall should leak to the junction of the brick wall on the toilet floor, which is caused by brick water.

Treatment method: clean the wall tiles and floor tiles below 2.2 meters in Mr. Wittmann's bathroom-remove oil stains; Use dilute hydrochloric acid (about 8%, remember to pump 38% hydrochloric acid from the market, 5-6 times of water should not be too dilute), and brush it with a sponge several times (the kitchen is equipped with waterproof gloves, which are corrosive and will not splash on him). Do not do too much at a time, and brush it with a clean brush for half an hour, otherwise the tiles will be yellow. In this way, the gaps between loose tile caulking agents can be cleaned; Is-from high to low-one side of the handle side; Be careful;

Ask the water out, there is a special waterproof tile gap treatment agent, the more you rub it, the more times you dry it; Pay special attention to the wall, building wiring and grounding height range of 65438 0 meters; In the actual construction, the underground water level of the toilet and bathroom has been poured into the concrete slab, and then the concrete is poured according to the beam template, which can't guarantee the compactness of the concrete-no way, it has been like this for many years.

Waterproof maintenance, we must be careful, the material is not the most important, the heart is the most important! ! ! SBS leaks, if you don't read it carefully, the asphalt tile will be carefully constructed for 5-6 years! !

Hongyuan waterproof JS waterproof coating for sewing agent can't be found. It won't save money to apply it a few times! !

Question 4: How does waterproof glue in the bathroom remove oxalic acid?

Question 5: How long will it take to use the toilet after waterproof glue finishes? After the bathroom is waterproof, wait until the waterproof layer is completely dry, and then do the water-closing test for 48-72 hours. After the closed water test is qualified, the subsequent bricklaying process can be carried out, or it can be directly put into construction.

The following is the closed water test:

1, waterproof construction is completed, and the closed water test can be done after the waterproof layer is completely dry;

2. Temporarily block the floor drain and the periphery of the nozzle;

3, the door build by laying bricks or stones 20CM high retaining wall;

4. Start to store water, the water depth is 5-20cm, and mark the water level;

5. The water storage time is 48-72 hours;

6. After closing the water on the first day, check whether the water level line has dropped significantly. If yes, please check whether there is leakage around the roof and downstairs pipes in time. If not, continue to turn off the water;

7. After the water is closed on the third day, comprehensively check the surrounding ceiling and roof pipes downstairs.

8. Proceed to the next working procedure after being completely qualified.

Question 6: How long will it take to use the toilet after waterproof glue finishes? You can go to Baidu Oriental Yuhong official website, where there are links such as Yuhong Tmall flagship store, which will show prices and products. You can also contact Yuhong customer service. I suggest you choose Oriental Yuhong's waterproof products and standardized construction team. Oriental Yuhong is the best waterproof listed company in China.

PBC-328 non-curing rubber asphalt waterproof coating

"Yuhong" brand PBC-328 non-curing rubber asphalt waterproof coating is a waterproof material which is made of high-quality petroleum asphalt, functional polymer modifier and special additives through scientific optimization and mixing, and keeps viscous paste under construction. The product has outstanding creep performance, so it has outstanding application characteristics such as healing, leakage prevention, waterproof ditch, fatigue resistance, aging resistance and stress-free.

Product characteristics

1. Creep-type paste waterproof material made of rubber, asphalt and additives, which is non-curing, film-forming and solvent-free;

2. Good workability: spray scraping construction, one-time molding, no drying time;

3. Excellent grassroots adaptability;

4, the coating is not cured, and the elastic-plastic performance is excellent;

5. Outstanding self-healing ability;

6. Excellent aging resistance, low-temperature flexibility and corrosion resistance;

7, solvent-free, safe and environmentally friendly.

application area

1, which is suitable for the base with large fluctuation and stress and the parts with predictable and frequent deformation; It is especially suitable for projects that cannot be constructed with open flame, machinery or cold bonding.

2. Suitable for waterproof projects such as concrete, color steel roofs, underground, pools and tunnels.

Reference dosage: theoretical dosage: construction thickness of each coating1.3kg/o ~1.4kg/o.

SPU-30 1 one-component polyurethane waterproof coating

"Yuhong" brand SPU-30 1 one-component polyurethane waterproof coating is a one-component moisture-cured waterproof coating, which reacts with moisture in the air after construction to form a flexible, durable and seamless elastic waterproof coating.

Product characteristics

1, single component, ready-to-use on site, convenient construction;

2, high tensile strength, high elongation, good elasticity, good high and low temperature resistance, and strong adaptability to shrinkage, cracking and deformation of the base;

3, the adhesion is strong, and there is no need to brush a base treatment agent on the surfaces of various bases that meet the requirements;

4, the coating is thick, the coating is dense, and there are no pinholes and bubbles;

5, chemical reaction film formation, long-term water erosion resistance, corrosion resistance, mildew resistance, fatigue resistance;

6, good environmental protection performance, high boiling point solvent, no benzene and coal tar components, and no need to add another solvent during construction;

7, cold construction, convenient operation.

application area

Underground works, bathrooms, kitchens, balconies, pools, parking lots and other waterproof works; It is also suitable for non-exposed roof waterproofing projects.

Reference dose

The coating dosage per millimeter of thick film is about1.6 kg/o-1.8 kg/o.

Key points of construction

1、

The base should be smooth, firm and dry, free from sharp corners, oil pollution and dust, and waterproof nodes should be handled well.

2, after mixing evenly, with rubber or metal scraper evenly scraping, appropriate points 2~3 times brushing. Bo Tu should be applied for the first time to close the pores at the grass-roots level, and the next step of construction can be carried out only after a layer of coating is finished. Generally, the interval is 24 hours (the drying time is appropriately extended in low temperature environment), and the next brushing direction is perpendicular to the last brushing direction.

3, according to the relevant specifications or design requirements for protective isolation layer construction.

Matters needing attention

1, construction temperature is 5℃ ~ 35℃, and construction is not allowed in rain and snow environment.

2, should be under the condition of good ventilation construction, construction personnel should do the corresponding safety protection measures.

3, direct use, no need to add any diluent, if you need to add, please consult the corresponding technical personnel.

4. Please carry out the construction according to the instructions provided by Oriental Yuhong. For more information, please read the product safety instructions before construction.

Packaging, transportation and storage

1, put in a clean, dry and airtight iron drum.

2. During transportation and storage, avoid sun and rain, stay away from fire sources, prevent collisions and pay attention to ventilation. The optimum storage temperature is 5℃ ~ 25℃, and should not exceed 40℃.

3. Under normal transportation and storage conditions, the shelf life is 6 months.

PCC-50 1 Cement-based Permeable Crystalline Waterproof Coatings

Yuhong brand PCC-50 1 cement-based permeable crystalline waterproof coating is a powdery rigid waterproof material made of portland cement and quartz sand. And mixed with various active chemicals. The infiltration of active chemicals into concrete will not produce NO > >

Question 7: How to keep the toilet sealed and keep it in the shade when the waterproof glue is not used up?

Question 8: What should I use to paint waterproof glue in the kitchen and bathroom? Of course, it is highly waterproof, safe and reliable, and we respect it very much!

Question 9: How to use waterproof glue in waterproof construction of new toilet? The water pipes in the bathroom are usually connected to the water in the kitchen.

Therefore, non-toxic and harmless waterproof coatings must be used.

Just JS belongs to non-toxic and harmless, belongs to environmental protection waterproof coating, and meets the national drinking water standard after testing.

What's more, the current toilet sinks when it shakes, and there is more groundwater.

JS can be constructed in wet bottom layer, and the bottom layer is not restricted by moisture content;

It has high tensile strength and elongation. The fine cracks in the bottom layer have strong follow-up, tough coating and obvious flexibility;

Strong adhesion. The coating film is firmly bonded to the bottom layer and decorative stone layer, and has excellent bonding effect whether painted on vertical surface, inclined surface and various bottom layers;

The coating is milky white, and various neutral and inorganic pigments can be mixed into the top coating according to engineering needs to make colorful coatings;

The construction is simple and easy to operate, which can ensure the engineering quality.

So JS is the best.

Question 10: 808 How to use waterproof glue as a toilet to prevent it and how to use the toilet as a waterproof layer? First of all, the practice of having tiles and not having tiles is different.

If there are tiles, you can use Qinglong No.3 waterproof coating. Qinglong No.3 is a transparent waterproof coating specially used for bathroom tiles.

If there are no tiles, you can use Qinglong HG203 environmental protection waterproof coating first, and then lay tiles.

Construction is also convenient. More importantly, it is an environmentally friendly and non-toxic waterproof coating.