Songjiazhuang is located at the starting station of Songjiazhuang Metro Line 5, 10 and Yizhuang Line in Fengtai District, east to Songzhuang Road, west to Shijiazhuang Tannery, south to Shiliuzhuang Road and north to Chenguang Road.
The planned total construction area of the community is 350,400 square meters, of which the above-ground construction area is 305,654.38+0.000 square meters. The residential building area is 276,200 square meters, including 27,600 square meters of low-rent housing. The project started before +065438+ on June 23rd, 2007 and was completed before +00+ 1 on June 23rd, 2007. The low-rent housing project was delivered half a year ahead of schedule and completed before June 13, 2009.
Extended data
Songjiazhuang built the largest subway interchange station in Asia.
Songjiazhuang subway station will be the largest subway hub station in Beijing and even in Asia. In 20 12, the hub station will realize the plane interchange of Metro Line 5, 10 and Yizhuang Line. Upon completion, the total construction area of the station will reach 5 1 1,000 square meters, which is equivalent to the size of seven football fields.
The completed Songjiazhuang interchange station includes 1 1 entrance and exit, among which the Songjiazhuang station on Yizhuang line and the Songjiazhuang station on 10 line will be put into use at the end of 20 10 and September 20 12 respectively. In addition, the area will also plan to build a ground transportation hub in Songjiazhuang.
Baidu Encyclopedia-Songjiazhuang