Matters needing attention in elevator construction
Construction elevator, also known as external elevator, also known as (dual-purpose) construction elevator, is the main mechanical equipment for vertical transportation of personnel and materials on the construction site. Before the construction elevator is put into use, the entrance and exit protective shed should be erected on the first floor, which should comply with the relevant aerial work specifications.
In case of heavy rain, fog, gale of magnitude 6 or above, and ice on guide rail frame and cable, the elevator must stop running. Lower the ladder cage to the bottom floor and cut off the power supply. After the storm, the elevator safety device should be checked and confirmed to be normal before use. 2.5m around the bottom cage of the elevator, protective railings should be set.