Is the feasibility study of engineering construction a feasibility study report?

Feasibility study report, referred to as feasibility study report for short, alias feasibility analysis report or feasibility report, refers to a written material that analyzes and demonstrates the feasibility of construction or renovation projects, scientific research and business activities through comprehensive investigation and study in the early stage of formulating production, infrastructure and scientific research plans as the basis for decision-making.

Therefore, the feasibility study of engineering construction is the feasibility study report. The general framework compiled by Zhongzhe Consulting for you is as follows:

The first chapter is an overview.

1. 1 project overview

1.2 Basic information of the project construction unit

1.3 compilation basis and research scope

Compilation basis of 1.3. 1

1.3.2 research scope

1.4 Main technical and economic indicators

1.5 conclusions and recommendations

1.5. 1 conclusion

1.5.2 suggestion

Chapter II Background and Necessity of Project Construction

2. 1 Construction background

2. 1. 1 "Chengdu-Chongqing Economic Zone" Opportunity

2. 1.2 Internet plus opportunities

2.2 the necessity of project construction

2.2. 1 conforms to the national industrial policy.

2.2.2 In line with the relevant policy orientation of Lu Xian County.

2.2.3 is to promote the long-term healthy development of social economy in counties of Sichuan Province.

2.2.4 Support and drive small and medium-sized enterprises in southern Sichuan to effectively enter the field of e-commerce.

2.2.5 is conducive to the integration of resources and promote the development of enterprises.

2.2.6 is conducive to increasing local employment and promoting regional economic development.

Chapter III Market Analysis

3. 1 market analysis

3. 1. 1 e-commerce market overview

3. 1.2 Current situation of online shopping market in China

3. 1.3 B2B market is still the main component of the total transaction volume.

3.2 Current situation of e-commerce market in each segment

3.2. 1 Current situation of pharmaceutical e-commerce market

3.2.2 Development Status of Agricultural Products E-commerce

3.3 Constraints of industry development

3.4 Industry Development Prospects

Chapter IV Project Operation Plan

4. 1 project principles

4.2 Project Positioning

4.3 SWOT analysis of the project

4.4 Project Promotion Plan

Chapter V Project Site Selection

5. 1 project site selection

5. 1. 1 project construction site

5. 1.2 position flow

5.2 Overview of Project Area

5.2. 1 natural conditions

5.2.2 Municipal supporting facilities

Social and economic situation

Chapter VI Project Construction Scheme

6. 1 construction scale

6.2 Planning and Design

6.3 construction plan

6.4 Road system design

6.5 Landscape and Greening Design

6.6 Structural design

6.6. 1 Design Basis and Standards

Working load value

structural design

6.7 elevator design

6.8 heating design

6.8. 1 heat source

6.8.2 Pipes, joints and laying methods

Chapter VII General Plane Traffic and Public Ancillary Works

7. 1 general plan

7.2 Public Auxiliary Works

7.2. 1 water supply and drainage

Power?Supply?

Lightning protection

Chapter VIII Environmental Impact Assessment

8. 1 Compilation basis and implementation standard

8.2 Environmental protection measures during construction

Environmental impact analysis during construction period

8.2.2 Pollution control measures during construction period

8.2.3 Air pollution control measures during the construction period

8.2.4 Noise pollution control measures during construction period

8.2.5 Construction waste water and construction waste pollution control measures

8.2.6 Ecological environment impact analysis during construction period

8.2.7 Countermeasures for Cleaner Production and Comprehensive Pollution Prevention during Construction Period

8.3 Environmental Impact Analysis during Operation Period

8.3. 1 surface water environmental impact analysis

8.3.2 Environmental air impact analysis

8.3.3 Acoustic environmental impact analysis

8.3.4 Impact of solid waste

8.3.5 Ecological impact analysis

8.4 environmental protection conclusion

Chapter IX Labor Safety, Health and Fire Control

9. 1 labor safety and health

9. 1. 1 Identification of risk factors

9. 1.2 safety measures scheme

9.2 Fire fighting

9.2. 1 design basis

9.2.2 Fire protection design of buildings

Chapter 10 Energy and energy-saving measures

10. 1 Planning and layout for energy saving

10.2 building energy-saving design

10.2. 1 energy consumption standards and energy-saving specifications

10.2.2 building energy-saving design

10.3 energy-saving design of water supply, power supply, lighting, air conditioning and ventilation

10.3. 1 water saving and energy saving design

10.3.2 power supply energy-saving design

10.3.3 lighting energy-saving design

10.3.4 air conditioning energy-saving design

10.3.5 ventilation and energy-saving design

Strengthening energy management and improving energy utilization ratio

Chapter II XI Project Organization and Management

1 1. 1 project organization and management

1 1.2 project management objectives

1 1.3 project management

1 1.4 project management plan

1 1.4. 1 safety management

1 1.4.2 quality control

1 1.4.3 progress control

1 1.4.4 cost control

1 1.4.5 financial management

1 1.4.6 contract management

Chapter XII Project Implementation Progress

12. 1 construction period

12.2 preparation before construction

12.3 implementation schedule

Chapter XIII Project Bidding Scheme

13. 1 basis for preparation of bidding scheme

13.2 bidding principles

13.3 bidding scope

13.4 bidding organization mode

13.5 bidding procedures

13.5. 1 project bidding

13.5.2 qualification requirements

13.5.3 project bidding

13.5.4 bid opening, bid evaluation and bid winning of the project

13.6 tender fee

13.7 tender information release

Chapter XIV Investment Estimation and Fund Raising

14. 1 investment estimation basis and explanation

14.2 investment estimation

14.2. 1 investment estimation range

14.2.2 Basic data and explanation

14.2.3 investment estimation

14.3 financing

Chapter 15 Financial Evaluation

15. 1 forecast hypothesis

15.2 profit model hypothesis

15.2. 1 operating income

15.2.2 tax estimation

15.2.3 cost estimation

15.2.4 profit forecast

15.2.5 cash flow forecast

15.3 financial evaluation

15.3. 1 profitability analysis

15.3.2 solvency analysis

Sensitivity and uncertainty analysis of 15.4

Sensitivity analysis of 15.4. 1

15.4.2 uncertainty analysis

Chapter 16 Project Risk and Control

16. 1 Policy Risk and Control

16.2 market risk and control

16.3 project risk and control

16.4 capital risk and control

16.5 external condition risk

Chapter 17 Benefit Analysis

17. 1 social welfare

17.2 economic benefits

17.3 compatibility analysis between project and location

17.3. 1 project impact

17.3.2 attitude and participation of interest groups in the project

17.3.3 attitude and support of organizations at all levels to the project.

17.3.4 Adaptability of regional cultural conditions to the project

17.4 social evaluation conclusion

Chapter 18 conclusions and recommendations

18. 1 conclusion

18.2 suggestion