Power plant information

Shanxi zhangshan power generation co., ltd.

Shanxi Zhangshan Power Generation Co., Ltd. (hereinafter referred to as Zhangshan Power Generation Company) is located in the northern suburb of Changzhi City in the southeast of Shanxi Province, east of Zhangze Reservoir, adjacent to Lu 'an Mining Group Company, with convenient transportation and abundant coal and water resources.

Zhangshan Power Generation Company was established in 200 1,1,1 1, and was established by Beijing Energy Investment (Group) Co., Ltd. and Shanxi International Power Group Co., Ltd., with the capital contribution ratio of 55% and 45% respectively. Since its establishment, the company has carried forward the enterprise spirit of "unity, truth-seeking, dedication and striving for the first place", established and improved the corporate governance structure, innovated the management system and mechanism, and established a horizontal "flat" organizational structure based on workflow. At present, the company has 1 1 management departments, including general manager department, party committee department, trade union office, supervision office, comprehensive planning department, finance department, fuel department, safety supervision department, power generation department, equipment management department and engineering planning department. * * * Employees 136, with an average age of 29 years.

The first phase of Zhangshan project has an installed capacity of 2×300MW, and two domestic 300MW air-cooled, desulfurization and coal-fired generating units are installed, with a total investment of about 2.54 billion yuan. Construction started on June 30th, 2002, and units # 1 and #2 were installed respectively in September, 2004.

The first phase of Zhangshan project is the first cross-regional cooperative power generation project for local power investors, which has important demonstration significance for local power investors to unite, complement each other's advantages, integrate resources, accelerate the pace of development and promote the diversification of power investors.

For the first time, the domestic 300MW generator set in Zhangshan Phase I Project adopted direct air cooling technology, and the annual water consumption was reduced from 654.38+04.6 million tons of the original wet cooling unit to 2 million tons, saving water by 86%. Its # 1 unit is the first 300MW direct air cooling unit put into commercial operation in China.

Semi-dry desulfurization technology integrating dust removal and desulfurization was adopted for the first time for 300MW units in the first phase of Zhangshan project, and the desulfurization efficiency reached 95% and the dust removal efficiency reached 99.99%. Its # 1 unit is the first 300MW semi-dry desulfurization unit put into commercial operation in the world.

The construction period of # 1 unit and #2 unit in Zhangshan Phase I Project is 2 10.5 months and 23 months respectively, which is10 months and 13 months ahead of the original national quota, creating a new record for the construction period of 300MW thermal power units in northern China.

With brand-new management concept, scientific organizational structure, first-class staff and advanced unit equipment, Zhangshan people are marching towards the goal of a world-class power generation enterprise with full enthusiasm and enterprising spirit!

I. Enrolment and graduation

1. Applicants for the college entrance examination must have a nationally recognized college diploma (national education series). All enrolled students are required to take the national adult college entrance examination, and they can enter the school only after being approved by the Shanxi Provincial Admissions Office.

2. The accepted students will be organized by the School of Continuing Education of Wuhan University to receive correspondence and face-to-face lectures and their exams. Those who have completed the prescribed academic system and all the courses specified in the teaching plan with qualified results will be awarded a nationally recognized diploma of adult higher education by Wuhan University, and those who meet the degree requirements will be awarded a bachelor's degree.

Second, learning methods and costs.

1. On-the-job training is mainly for 3 years.

2. Learning place: our company.

3. Total cost: 6900 yuan/person (I pay 1/3 first, and those who pass the college entrance examination within the specified time are free).

Registration will begin from now on. Interested parties please go through the registration formalities at the General Manager's Work Department as soon as possible. (Tel: 2230)

General manager's work department

65438+February 23rd, 2005