Definition of engineering cost consulting service

Engineering cost consulting service refers to the activities of engineering cost consulting enterprises to provide professional services for the determination and control of construction project cost and to issue engineering cost achievement documents. The main contents of engineering cost consulting service include: economic evaluation of feasibility study of construction project, investment estimation, preparation and review of post-project evaluation report; Preparation and review of budget, budgetary estimate, settlement and completion report of construction projects; Compilation and review of pre-tender estimate and bid quotation in the implementation stage of construction projects; Compilation and review of bill of quantities; The change of construction contract price and the calculation of claim cost: provide appraisal service for economic disputes of project cost; Provide cost monitoring and services for the whole process of construction projects; Provide engineering cost information services, etc.

Earthwork part

Groundwater was not considered in earthwork bidding. If you see water seepage during excavation, you can apply for a visa for the height of groundwater level. The price of digging wet soil is higher than that of dry soil, and digging silt is even higher. If you encounter underground obstacles, you have to apply for a visa, and the cost of cleaning underground obstacles is not cheap. Also, if the water seepage is large, you can also write a construction plan to apply for drainage and dewatering measures and slope support measures.

When the site is narrow or the slope is not stable enough to pile up enough backfill, the quantity and distance of earthwork transported abroad should be verified. Because most of the blocks consider piling soil on site, the rest of the soil will be transported abroad. If the excavated soil is transported away, backfilled and backfilled, the fee will not be calculated unless it is clearly signed.

Of course, the distance of earthwork transportation depends on whether it is favorable or not. If it's not beyond the list, forget it. If it is out of range, it is necessary to sign the distance. The oil price is so expensive now, hehe.

In order to speed up the progress in response to Party A's request or to backfill as soon as possible in consideration of the unstable slope, brick formwork is adopted for foundation construction. If there is no requirement when bidding, you can also sign it. The price of brick formwork is higher than that of formwork support.

If the foundation construction period stops due to rain or the construction period is delayed due to Party A's reasons, the drainage and precipitation expenses can be based on the team visa. Of course, if the basic period stops for a long time, it must be remembered that the visa should not be delayed until the start of work, and it should be done at least once a month. This is also the principle of long-term visa. Otherwise, it will take a long time for Party A's supervisor to check, and it will be very troublesome to make up later.

The construction unit is responsible for the on-site three links and one leveling. If Party B also participates in this work, it can negotiate with Party A. ..

Pile foundation part

Besides keeping records of concealed works, we should also pay attention to the visa of underground obstacles in pile foundation. If you encounter rocks, you should mark the penetration depth in time.

The concealed record should be as detailed as possible, that is to say, it should at least include: hole depth, pile length, reinforcement cage length, gap length, diameter and rock penetration depth.

Masonry part

The most common situation of masonry is that it is demolished, and it is no problem to demolish the wall. But the visa must indicate the damage degree of the brick (otherwise the auditor will directly reduce the material for you). If the damage is not serious, the loss rate of the brick and the second use will eliminate the working days such as ash scar and slag inclusion.

Reinforcement part

Many people don't know that steel bars can also be used for visas. Now many executives are not familiar with their own business and command blindly at the scene. Steel bars should be added here and there, and hooks should be made to construct reinforcement. Anyway, he is not at ease without adding steel bars. It doesn't matter, as long as he is willing to sign, the more he adds, the better. I don't care about money, mainly to gag those half-assed executives.

Template component

At present, many projects are priced by list, and some list measures are not clearly listed, which brings trouble to the subsequent settlement, so the template will be solved. Therefore, the visa added in the template is particularly important. If there is no explanation, it is likely to be cut directly for you. Although we can argue, it is always good to do things first.

The number of templates that catch up with work has also increased. This is a fair and reasonable fee, but in fact, no one wants it. According to the legal time limit or the bidding time limit, how much speed and how many sets of templates does Party A require now? The calculation inside is quite complicated, so it is recommended to refer to relevant publications for more information.

This also reminds us:

1. If Party A fails to reach an agreement on the progress of the image or the agreement is not detailed enough, it can try its best to postpone the work and strive for a claim in its favor.

2. Whenever there is a construction period, you should check it yourself first. If you have enough visas, it's good to get into the habit.

3. In the process of construction, Party A has no right to add any clauses, such as: which day of the month can't be capped, how much will be fined for delaying one day, and so on. If there are any requirements, they will be mentioned in the contract and additional requirements will be paid.