Ask for a model contract for electric power design?

ContractNo.: _ _ _ _ _ _

Party A: _ _ _ _ _ _ _

Address: _ _ _ _ _ _

Tel: _ _ _ _ _ _

Contact person: _ _ _ _ _ _

Fax: _ _ _ _ _ _

Postal code: _ _ _ _ _ _

Party B: _ _ _ _ _ _

Address: _ _ _ _ _ _

Tel: _ _ _ _ _ _

Contact person: _ _ _ _ _ _

Fax: _ _ _ _ _ _

Postal code: _ _ _ _ _ _

Party A and Party B sign the following contract on _ _ _ _ _ _ _ _ (place name) weak current integrated wiring system:

I. Overview of the Project

1, project name: _ _ _ _ _ _ (location name) Weak current integrated wiring system

2. Project address: _ _ _ _ _ _

3. Project overview: metal bridge installation, information point pipeline installation, information point wiring and installation; Wiring and installation of optical cable wiring information points in the computer room; Assist in the installation of lightning protection and fire protection system products.

Two. Responsibilities and obligations of both parties

1. Party A is responsible for coordinating and handling related problems on site and ensuring the necessary conditions for normal construction on site.

2. Party B shall carry out the construction and completion according to the time stipulated in the contract, and complete the following work on the premise of ensuring the quality and progress of the project:

1) Complete _ _ _ _ _ _ _ _ _ _ _ (place name) weak current integrated wiring system (engineering quantity: the metal bridge is installed about 400 meters; Pipeline laying is about _ _ _ _ _ _ _ meters; About _ _ _ _ _ _ _ information points are wired and installed; About _ _ _ _ _ _ _ computer room information point wiring installation; About _ _ _ _ _ _ _ indoor optical cable wiring; And assist in the installation of lightning protection system products and fire protection system products)

2) Submit the information point plane identification diagram, distribution frame identification table, cable label and relevant corresponding documents.

3. Party B shall guarantee that the clothes (work clothes) will be constructed on site, and the project team leader will be present every day.

4. Party B guarantees the normal operation of the project for one year.

5. Party A shall transport the engineering materials to the site in time and store them in a safe warehouse.

Third, the progress of the project

1. Through negotiation between Party A and Party B, it is planned to complete this project before.

2. If Party A fails to provide the construction conditions, Party A and Party B shall negotiate separately.

Fourth, the project acceptance time

Within one month after the completion of the project, Party A shall organize acceptance. If the acceptance is not organized within one month without justifiable reasons, it shall be regarded as a qualified project.

Verb (abbreviation of verb) contract budget amount

The total budget of this contract is: (RMB) _ _ _ _ _ (RMB 000.00).

Settlement method of intransitive verbs

When the engineering quantity reaches 50%, Party A shall pay Party B an advance payment of _ _ _ _ _ _% of the total contract amount. _ _ _ _ _ _ _ _% shall be paid within one week after project acceptance, and the remaining _ _ _ _ _% shall be paid within one year.

Party B shall issue a _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ special invoice for construction and installation to Party A. ..

Seven. Force majeure accident

If the construction period is delayed and postponed due to force majeure accidents such as war, fire, flood, typhoon and earthquake, Party B shall not be held responsible ... However, Party B shall immediately notify Party A and take all necessary measures to complete the construction as soon as possible.

Eight. responsibility for breach of contract

If Party A fails to pay the project payment according to Article 6 of the Contract, it shall bear 0.5 ‰ of the daily penalty.

If Party B abandons the project installation midway, the contract amount will not be paid; If Party B fails to abide by the confidentiality agreement, Party B shall be responsible for deducting 50% of the contract amount.

Nine. Method of dispute settlement

Any dispute arising from this contract shall be settled by both parties through consultation. If negotiation fails, it shall be submitted to the people's court where Party B is located for jurisdiction.

Related contract model

Construction subcontract, building decoration construction contract, steel structure construction contract

Decoration construction contract, construction supervision contract and painting construction contract.

Maintain the construction contract, billboard construction contract and landscape construction contract.

XI。 Entry into force of contract and others

1. The original of this contract is in duplicate, each party holds one copy, and it will come into effect after being signed and sealed.

The annexes to this contract have the same effect as this contract.

3. During the execution of this contract, the signed supplementary agreement is an integral part of this contract.

4. If there are any unfinished matters, both parties shall settle them through friendly negotiation.

Party A (signature): _ _ _ _ Party B (signature): _ _ _ _ _ _

Legal representative or its client: _ _ _ _ _ _ _

Address: _ _ _ _ _ _ Address: _ _ _ _ _ _

Bank of deposit: _ _ _ _ _ Bank of deposit: _ _ _ _ _ _

Account number: _ _ _ _ _ Account number: _ _ _ _ _ _

Signing time: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _