What are the requirements for running aerated concrete block brick factory in Fujian Province?

In terms of environmental protection, there must be requirements for dust, emission and fuel, such as the environmental protection degree of workshop equipment, whether the dust particles in grinding workshop and cutting workshop meet the standards, the discharge of wastewater, and what boiler fuel meets the requirements (it is estimated that it is not possible to burn loose coal now). The specific fuel depends on the place (heavy oil, biomass)

If building materials are needed, it is estimated to be the compressive strength of the finished product. Nowadays, many buildings require finished products of more than 5.0 mu, and some businesses that produce 3.5 are not easy to do.

It needs to be approved by environmental assessment, fire protection, land and resources bureau, industry and commerce, development and reform commission, and wall reform office. The wall renovation is to take it for compression and fire resistance test after the finished product comes out.

Yun Sheng Heavy Industry provided a reference.

Baidu Yun Sheng Heavy Industry can consult equipment, raw material requirements, site planning and other issues at any time for reference.

The above pictures are partial for reference.