First, reflect the "four new" applications.
"Four Innovations" means new materials, new technologies, new processes and new structures, and the application of "Four Innovations" means the transformation of scientific and technological innovations in construction projects. First, in the valuation basis of architecture and decoration, quota items such as Mengyuan Cultural Project and hydraulic hammer Stone Breaker have been added, and measures such as bowl-button scaffolding and automatic slip-film scaffolding have been added. Vertical transportation projects are no longer divided by buildings, but by structural types and machinery used. There are 270 supplementary subheadings. 2. On the basis of professional valuation of installation, the firmly fixed items such as laying of galvanized steel pipe (JDG) and installation of lighting lamps in buildings have been added, and the book Communication Equipment and Line Engineering has been added separately, and the eliminated gases such as halon121,130 1 have been cancelled. There are 526 supplementary subprojects. Third, on the basis of municipal professional valuation, the latest pipe jacking technologies such as mud-water balance pipe jacking and horizontal drilling jacking were added, and 357 sub-projects were added. Fourth, hedgerow digging and other items have been added to the valuation basis of landscaping specialty. There are 276 supplementary subprojects. In addition, for the "four new" applications such as new materials that appear at any time in the process of quota implementation, the annual cost station will adopt a selective and regular replenishment method according to the filing situation of the "four new" of the construction science and technology promotion center.
Second, reflect green development, including both green buildings and green construction.
In the embodiment of green development, the new quota has compiled the quota projects of EPS module insulation engineering and CL building system structure engineering of existing buildings. The new valuation is based on the national green building evaluation standards, including green, environmental protection, energy saving and prefabricated buildings. Dust control and other related contents have been added to the cost quota, and the whole decoration of the house has been included in the quota. Domestic waste treatment project and concrete drainage module well are also compiled. At the same time, the cost management station is required to compile the Budget Quota of Green Building Project in Inner Mongolia Autonomous Region, Budget Quota of Assembled Building Project in Inner Mongolia Autonomous Region and Budget Quota of Residential Decoration Project in Inner Mongolia Autonomous Region as soon as possible.
Third, reflect the differences in intelligence and adapt to the construction needs of smart cities, smart communities and smart buildings.
"Wisdom+ecology" is the eternal goal of urban construction, and buildings and residential quarters are important components of urban construction, which should embody wisdom and ecology. The design standard of intelligent community in Inner Mongolia Autonomous Region has been promulgated, and the relevant national standards for intelligent buildings have also been promulgated. In the process of compiling quota, wisdom should be reflected, and the difference between wisdom and non-wisdom in project cost should be reflected. Communication equipment and line engineering, intelligent building engineering, and intelligent community design standards are all important manifestations of this concept.
Fourth, reflect the differences in structural systems.
In order to promote the transformation and development of the construction industry and gradually eliminate the traditional and backward structural system, the new valuation basis refines, sorts out and summarizes the quota subheads, realizing a separate volume, reflecting the advantages of light, fast, good, economical and high assembly of steel structure buildings; Architectural specialty embodies the differences in direct costs and vertical transportation measures of brick structure, concrete structure, steel structure and wood structure. In the installation specialty, electrical piping engineering is set separately according to different laying positions and laying methods, and the factors that affect the cost due to different structures are fully considered.
Five, reflect the genuine, encourage quality improvement, high quality and good price.
The quality of construction engineering not only refers to durability, but also includes comprehensive qualities such as economy, applicability, comfort and safety, which means that quality benefits are achieved through comprehensive qualities, and its core is low carbon, green, energy saving, environmental protection, intelligence and science. Project cost is the basis of ensuring project quality, which should be linked with project quality, and should not only pay attention to price agreement but not quality requirements. Based on the new valuation, the linkage mechanism between project cost and project quality is established, and the project cost and project quality are linked through the material price information platform to ensure the project quality from the source and determine the project cost reasonably.
Six, reflect the skills and technical level of workers, and carry forward the "artisan spirit".
In order to carry forward the craftsman spirit of striving for perfection and being meticulous, the comprehensive man-days are calculated in proportion by ordinary workers, technicians and senior technicians according to the quota subhead in the new pricing. According to the difference of labor wages, do a good job in the daily management of labor costs, labor consumption and labor prices, combine the regional characteristics of the autonomous region and consider the seasonal differences of employment, and the cost management stations of each union city implement dynamic adjustment and release, not less than twice a year.
7. Reflect market facts and laws.
Article 6 of law no.6. The Ministry of Housing and Urban-Rural Development 16 "Management Measures for Construction Contracts and Contract Valuation" stipulates that all construction projects invested or mainly invested by state-owned funds (hereinafter referred to as construction projects invested by state-owned funds) shall be priced by bill of quantities; Construction projects with non-state-owned capital investment are encouraged to be priced by bill of quantities. According to the new valuation basis, the bill of quantities must be used for construction projects invested by state-owned funds, and it is recommended for construction projects invested by non-state-owned funds. Establish a market-determined project cost mechanism to provide institutional guarantee for the government's macro-control, enterprises' independent quotation and price formation through competition. Quota consumption, quota labor price and material unit price should reflect the actual situation of the construction market.
Eight, reflect the rigor of science.
The new valuation basis takes the bill of quantities as the core, formulates the quota compilation scheme, quota system and management methods, ensures the connection between quota and bill, builds a rigorous and scientific engineering valuation basis system, and continuously improves the scientificity of valuation basis and its ability to adapt to the market. Generally speaking, the core of rigorous science is that the factors considered in quota compilation should be rigorous and the depth of each factor should be scientific and reasonable.