Zhuang Jie supervision first signed a supervision contract with the owner.
1, specifying the contents of supervision;
2. Clarify the responsibilities and rights of the client and the supervisor;
3. Determine the contract price and payment method;
4, clear time limit for a project requirements and engineering delay processing method;
Second, the audit decoration company
Review the business license, qualification certificate, business location and designer qualification certificate of the decoration company.
Third, review the design scheme.
Whether the design scheme conforms to the relevant provisions of the Ministry of Construction, the Municipal Construction Committee and the Municipal Housing Society, including the demolition and transformation of building structures, the transformation of water, electricity and gas lines, etc. Whether the drawings are complete and feasible.
Fourth, review the contract.
Whether the standard version of the contract is adopted, whether it is complete and correct; Whether the quotation conforms to the decoration market guidance price announced by the decoration association; Whether all technical practices are clearly marked; Whether the brands adopting material specifications have detailed descriptions; Whether the rights of Party A and Party B are fair and reasonable.
Five, review the qualifications of construction personnel
Whether the construction personnel have the corresponding operation skills: whether the operators in some special positions have certificates (plumbers, electricians, etc.). )
Six, audit inspection materials
Supervise decoration companies to purchase and use decoration materials, equipment and accessories that meet national and industry standards and have factory certificates and provincial and municipal licenses, and put an end to the use of counterfeit and shoddy products.
1, according to the requirements of the contract documents, review the professional and technical qualifications of personnel (unqualified replacement);
2, according to the requirements of the contract documents, check the quality, price and quantity of materials and equipment (unqualified return);
Product name, brand, model, specification, certificate of approval, manufacturer and address;
B. Imported products shall provide the fax or copy of the corresponding customs declaration form and access permit;
C production license, test report and environmental inspection report of special products;
3. Require reasonable storage and custody of materials and equipment entering the site;
4. Submit the above information for the record.
Seven, review the construction technology
Whether the construction technology conforms to the relevant decoration regulations of the Ministry of Construction, the Municipal Construction Committee and the Municipal Assembly Association, ensures the quality and construction period of the decoration project, and achieves the expected effect.
1, check and accept demolition, reserved drilling, embedded gouging and other projects;
2, new water, electricity, gas and weak current engineering pipelines, pipelines and other projects and drawings inspection and acceptance;
3, aluminum alloy or plastic steel doors and windows, closed balcony and other projects of inspection and acceptance;
4. Inspection and acceptance of basement, waterproofing and bricklaying works;
5, ceiling, floor and joinery engineering inspection and acceptance;
6, painting, painting, pasting and other decoration engineering inspection and acceptance;
7. Inspection and acceptance of sanitary ware, panels, lighting, hardware pendants and other installation works in the contract;
8. Acceptance of special projects such as carpets and soft bags;
9. Inspect and accept the safety and cleanliness of the computer room according to the contract requirements.