A layer of beam and slab will evaluate the height of tall buildings, not the overall height; There is no need to evaluate verticality. The column is vertical, so the verticality must be evaluated, and the bid evaluation is not high; The beam and slab are not vertical, only the bid evaluation is high, and there is no verticality.