Nanjing G42 Hurong expressway Construction Closed Road Section and Bypass Guide

Some sections of Nanjing G42 Hurong Expressway have to be closed due to construction. Attention, friends who are going to travel recently. The following is the relevant detour guide. In a word, you can't walk here when you travel.

Announcement on the closed construction of some sections of G42 Shanghai-Chengdu expressway

According to the decision of Jiangsu Provincial Department of Transportation and Jiangsu Provincial Public Security Department to grant traffic administrative license (Su Gao Xu Zi 00 13 1), Hu Ning Company will carry out road maintenance works for expressway Shuofang Hub from 0: 00 on May 20, 2008 to 24: 00 on May 2008. During this period, traffic control measures will be closed and vehicles will be banned.

General situation of construction

From 1 to May 10, the section from Shuofang Hub of Shanghai-Chengdu Expressway to Suzhou North Hub will be fully enclosed, with a total length of 2 1.6km.

2. During the construction period, the direction from Nanjing to Shanghai will be completely closed, so it is recommended to bypass.

Traffic diversion measures

1. The whole road network is bypassed and diverted.

The G40 Shanghai-Shaanxi Expressway and G422655 at 15 hubs, including Xinhuangnan Hub, Qilin Hub, Dongshan Hub, Gui Zhuang Hub, Chahe Hub, Dantu Hub, Xuebu Hub, Xinchang Hub, Zhengyi Hub, Xuanbao Hub, Luoxi Hub, Wujin High-tech Zone Hub, Xiwu Hub, Xiaohai Hub and Dong Bang Hub, are selected for the far-end arrival.

2. Regional bypass and shunt

Cars heading for Shanghai and Zhejiang can bypass G422 1 Huwu Expressway, G40 Hushan Expressway, S48 Yi Xi Expressway and S 19 Tongxi Expressway in six hubs, including Henglin Hub, Wuxi North Hub, Qiao Qi Hub, Wuxi Hub, Zhangjiagang Hub and Guangling Hub.

3. Local forced bypass and shunt

From May 10 to May 3 1, vehicles bound for Shanghai, Zhejiang and other regions must be diverted at Shuofang Hub. All vehicles are bypassed by S 19 Tongxi Expressway, S58 Shang Hu Expressway and S 17 Tai Su Expressway (formerly S9 Sushao Expressway). Wuxi Toll Station, Wuxi East Toll Station and Sunan Shuofang Airport Toll Station will close the Shanghai-oriented ramp as appropriate.

Local Closed Maintenance of Nanjing Ring Highway

Closed road section

Ring Expressway-Baguazhou Yangtze River Bridge (the second bridge goes to Dashengguan Yangtze River Bridge (the direction of the third bridge, get off at Fengtai South Road ramp).

Cause of closure

The bridge bearing is deformed and the column is damaged, which is in urgent need of maintenance. The closing time is May 9, 2003, and it is expected that the new ramp will be opened before the National Day in 2008. Bypass line 04 1 and cross Tiexinqiao Interchange-Fengxin Road-Xichun Road-Fengtai South Road; 2. Youfang Bridge and Jiangshan Street-Huangshan Road-Hexi Street (Yurun Street-Fengtai South Road) interchange bypass.

Bypass scheme