2. Then, the pressure test can only be carried out after all water pipe passages are welded. Before the pressure test, all plugs should be plugged and the inlet main valve should be closed.
3. Finally, shake the pressure rod of the jack until the pointer of the pressure gauge points to 0.9 to 1.0.