How to Suppress Haochuan ha0 Water Separator

1. First, connect the hot and cold water pipes together with hoses. Hot and cold water form a circle, and the pressure tester is placed at any water outlet. At this time, the pressure pointer is 0 pressure.

2. Then, the pressure test can only be carried out after all water pipe passages are welded. Before the pressure test, all plugs should be plugged and the inlet main valve should be closed.

3. Finally, shake the pressure rod of the jack until the pointer of the pressure gauge points to 0.9 to 1.0.