1, planning
The master schedule is the guiding document to control the project progress. Under the guidance of the master plan, each subproject is refined and fine-tuned. According to the requirements of major nodes, formulate detailed construction progress plan, technical preparation, material supply, working procedure sequence, overall arrangement and other construction activities to ensure the start and completion time of the overall plan. According to each construction process, organize the supply plan of labor and various materials.
(1) programming
Collecting data → dividing construction projects → calculating quantities of each project → calculating quantities of each project → determining time limit for each project → overlapping each other → making progress plans → checking and adjusting.
(2) Division of construction projects
Construction projects are generally divided into sub-projects or working procedures, which is convenient to guide each type of work to achieve the sub-project objectives, make overall arrangements and shorten the construction period.
(3) Planned workload
Calculate the engineering quantity according to the construction drawings, analyze the required labor and materials according to the quota, and determine the equipment, material supply and construction scheme of each type of work.
2, phased progress
According to the overall schedule, the phased construction schedule can be carried out in the following stages:
(1) basement construction progress plan.
(2) the main structure stage construction schedule.
(3) the decoration stage construction schedule.