Why did Shuofeng Job fall so badly?
Long-term shutdown. Shuofeng Boyue basically stopped production from June of 202 1, 1 1. At that time, Building 5 and Building 10 had floors 13 and 14. Now nine months have passed and no floors have been added. I asked the salespeople what they always said about fixing production by sales, so every time I asked, it was1.2.5.6666, saying that someone was doing something. On such a big construction site, only a few people pose there. Is this also called starting work? The main body did not expose the steel bars to the sun, and the construction period was constantly compressed. How to ensure the quality of the house to protect the legitimate rights and interests of buyers.