199965438+February, completed the development of the backstage electricity charge information management system of the main station of North China Power Grid charging system.
In July, 20001,"MPTMS2000 Remote Electricity Charging System" won the third prize of Beijing Scientific and Technological Achievements and the first prize of North China Electric Power Group Corporation, and was rated as "domestic leading and international advanced" by experts.
In 2002, it was recognized as "high-tech enterprise" and "software enterprise" by Beijing Science and Technology Commission.
From June 5438 to February 2002, the geographic information system of North China Power Grid was completed, and the project won the first prize of scientific and technological achievements of North China Power Grid Co., Ltd.
In July 2003, Fengtai production base was completed and put into operation, and mass production of electric energy meters and terminals began.
In 2004, the "North China Power Grid-meter reading system for residents in Zhangjiakou, Langfang, Chengde and Tangshan" was completed;
In August 2004, he won the bid for the project "GIS management system for 500kV transmission lines in East China Power Grid";
In May 2005, it won the bid for "Power Billing System Project for 500kV Substations of Three Gorges Power Transmission and Transformation (Xianning, Anyang, Wan Le and Yueyang)";
From June 5438 to February 2005, XYJ0 1 1-B wireless PT secondary circuit voltage drop tester based on GPS was put into production.
In April 2006, our company successfully passed the acceptance organized by State Grid Corporation and was highly praised by Qinghai Electric Power Company and experts attending the meeting.
In April 2006, the "Management Information System for Local (Self-owned) Power Plants of Hebei Electric Power Company" contracted by our company passed the acceptance test successfully. The project involves 88 local (self-owned) power plants of six regional power companies in Hebei Province, and it is the first local power plant electric energy management system in China.
In August, 2006, the project of "Main Station of Energy Metering System of Ningxia Electric Power Company" undertaken by our company passed the acceptance test successfully, and was highly praised by Ningxia Electric Power Company. The success of this project is an important symbol of the maturity of our provincial electric energy billing system.
In March 2007, the "500 kV production management system of North China digital power grid-3D GIS part" undertaken by our company successfully passed the acceptance of State Grid Corporation, and the system realized the 3D visualization of 8 stations 2 1 lines in North China.
In June 2007, he won the bid for "Zhengzhou Power Grid Charging and Line Loss Analysis System Project of Henan Electric Power Company". In August, 2007, we won the bid for "1000 kV UHV AC test demonstration project-remote electric energy metering system", which fully proved the excellent technology and strong strength of Jingyubang in the field of high-end electric energy metering.
From June, 5438 to February, 2007, the main station reconstruction project of electric energy metering system of Tianjin Electric Power Company passed the acceptance test successfully.
In May 2008, it won the bid for "Electric Energy Metering System of the Upper Yellow River Hydropower Development Co., Ltd.", which achieved a breakthrough in bidding for provincial hydropower projects.
In June 2008, "Beijing Yubang Wireless PT Secondary Circuit Voltage Drop Testing Technology Seminar" was held in Xiangshan, Beijing. More than 50 leaders and experts from State Grid Corporation and North China Power Grid Corporation were invited to attend the meeting, covering major power grid areas such as North China, Northeast China, East China, Northwest China, Southwest China and Southern Power Grid.
In June 2009, 5438+ 10 won the bid for the project of "On-line Real-time Monitoring System for Desulfurization of Coal-fired Units in Jiangxi Province".