Basic survey of Jieyang port
Huilai is 82 kilometers long along the coastline, and the coastal ports are mainly composed of Shenquan, Jinghai, Qianzhan and Xian 'an operation areas. Located in the southeast coast of Huilai County, it crosses the sea including Menwan, Jiazi and Jieshi Bay, with Shantou Port in the north, Jiazi Port in the southwest and South China Sea in the southeast. The sea area is more than 7,680 square kilometers, and there are many harbors, especially Shenquan Bay, Jingwan Bay and its nearby coastline, which are characterized by vast waters, small waves, small siltation, superior water depth and good geological conditions. Various berths suitable for the construction of deep-water ports are ideal port sites for large-scale engineering projects. Guangdong Yuedian Huilai Power Plant is under construction. According to the engineering design requirements, a supporting wharf will be built in Jinghai Bay on the east side of Jinghai Port Area. The construction scale of the first phase project is170,000-ton coal wharf (the hydraulic structure is designed as1500,000-ton ship type) and13,000-ton integrated wharf. The harbor basin and waterway dredging are 70,000-ton ships, with the designed annual throughput of 5 million tons of coal. The comprehensive wharf of Huilai Power Plant is designed as a berth length of 3,000 tons. Construction started on March 3, 2005, and the main structure of the wharf was completed on July 28, 2005, which met the requirements of berthing, unloading and transporting heavy equipment. On June 65438+10/October 65438+March 2005, it passed the preliminary acceptance and put into trial operation.