Introduction of foundation pit detection specification?

The specification of foundation pit detection is still relatively unfamiliar to relevant architects. In order to strengthen the management of foundation pit engineering, how is the foundation pit specification implemented in China stipulated? What's the regulation of foundation pit detection code? The following is the basic information of Technical Specification for Foundation Pit compiled by Zhong Da Construction Consulting Company. The details are as follows:

The basic definition of foundation pit:

Foundation pit refers to the underground space excavated for building the foundation and basement of buildings (including structures). The temporary pit for building foundation excavation is called foundation pit.

Basic survey of foundation pit specification:

The specification of foundation pit mainly includes three parts: general rules, clauses and regulations. Among them, the foundation pit detection specification includes the following contents:

1. Before preparing the monitoring plan, the monitoring unit should know the requirements of the entrusting party and relevant units for monitoring work, conduct site reconnaissance, collect, analyze and utilize existing data, and formulate a reasonable monitoring plan before foundation pit construction. The monitoring plan shall include the general situation of the project, monitoring basis, monitoring purpose, monitoring items, layout of measuring points, monitoring methods and accuracy, monitoring personnel and main instruments and equipment, monitoring frequency, monitoring alarm value, monitoring measures under abnormal conditions, recording system and processing method of monitoring data, process management and information feedback system, etc.

2, monitoring the construction unit in the field reconnaissance, data collection stage work should include the following contents:

1. Learn more about the specific requirements of the entrusting party and relevant units;

2. Collect the geotechnical investigation and meteorological data of the project, the design data of underground structure and foundation pit engineering, and understand the construction organization design (or project management planning) and related construction conditions;

3. Collect the original and present situation of surrounding buildings, roads and underground facilities and underground pipelines. When necessary, relevant information should be saved by taking photos or videos;

4. Through on-site reconnaissance, understand the corresponding relationship between relevant information and on-site conditions, and determine the feasibility of on-site implementation of the project to be monitored.

3, the following monitoring scheme of foundation pit engineering should be specially demonstrated:

1. Foundation pit engineering with complex geological environment conditions;

2 adjacent to important buildings (structures), pipelines, as well as historical relics, modern excellent buildings, subways, tunnels and other foundation pit projects with serious damage consequences;

3. Reorganized foundation pit engineering after a major accident;

4. First-class and second-class foundation pit engineering with new technologies, new processes and new materials;

5. Other foundation pit projects that must be demonstrated.

4. The monitoring unit shall strictly implement the monitoring plan, timely analyze and process the monitoring data, and timely feedback the monitoring results and evaluation to the entrusting party and relevant units. When the monitoring data reaches the monitoring alarm value, the entrusting party and relevant units must be informed immediately.