Since 1 xx, the District Development and Reform Commission has conscientiously implemented the annual work arrangement of the district committee and government, persisted in implementing the spirit of the 19th Party Congress, focused on key project construction and economic operation monitoring, analysis and dispatching, and earnestly done all the work delivered by the district committee and government, and achieved certain results. The work is now reported as follows:
I. Project Construction
1. Completion: Since the beginning of this year, Jin Peng Yuanda Green Building Industrial Park Phase I, integration of defense and civilian technologies Unmanned Intelligent System Manufacturing Collaborative Innovation Center, Wang Ying tributary (Huizhiwan) water system regional environmental control (EPC) project and other projects have been completed in the whole region, and 9 billion yuan projects such as Hua Kai intelligent electrical equipment manufacturing, new material research and development and industrialization have been newly completed, accounting for.
In the second quarter, major project construction competitions were held in the whole region, and 44 key projects were determined to be led by district-level leaders, and the responsibilities of responsible units and co-organizers were clarified. Through hard work, a total of newly started projects 1 1 were realized during the contest (development zone southeast electric power, Huayuan plastic, Ruihua glass, three-way catalytic converter, Yili electric power, Feng Gang science and technology standardization workshop, safety technology research and development and industrialization of Nanjing University of Technology, Tiankai biotechnology, Shahe Korean pet-grade oil and feed processing, Longpan wanda plaza, Daliu Moon Bay, A total of four newly completed projects were realized (the opening of new materials in Higher Education City University of Technology, the second phase project of new energy vehicle standardization workshop of key bureau, Dongpo Road junior high school of Education and Sports Bureau, and the widening of G328 Chuning Expressway of Transportation Bureau), accounting for 65,438+065,438+00% and 65,438+000% of the opening and completion tasks of the competition respectively.
The development of key project construction competition has further promoted the growth of fixed assets investment in the whole society. From June to May, the total investment in the whole region was 4.72 billion yuan, up 29% year-on-year, ranking 1 in the whole city. It is estimated that the investment in June is about 654.38+0.2 billion yuan, and the investment in fixed assets increased by more than 29% in the first half of the year, exceeding the expected target.
2. The third section project construction objectives and measures:
In the third quarter, four billion yuan projects including Jinling Haupt, Zhengde Electric, Warwick Industrial Pump and He Kang Electric were initially started, and three projects including Yolanda Standard Parts, Puweilai and Xinsheng Steel Structure were completed. In the whole year, it is estimated that 30 new projects will be started 1 100 million yuan (exceeding the annual task 10), and more than 5 new projects will be completed 1 100 million yuan.
First, organize the summary and commendation meeting of the contest activities in time. Summarize the achievements and experience of project assistants during the competition, analyze the shortcomings and formulate targeted measures to commend the advanced and spur the backward, and continue to carry out project assistant activities, laying the foundation for the realization of project construction goals in the third quarter and even the second half of the year.
The second is to do a good job in planning key projects. It is necessary to further implement the spirit and requirements of the city's key project planning meeting held by Mayor Xu Jiwei in June, and persist in project planning and attracting investment around the development of leading industries, the construction of new bases, the creation of high-tech education cities and infrastructure in our region to consolidate the investment growth potential. No fewer than 65,438+000 projects are planned throughout the year.
The third is to do a good job in the preliminary work of the project. Focus on the newly signed projects and the 1 1 projects that have not started the competition this year, do a good job in handling the pre-approval items of the projects, and solve the problems existing in the project promotion in time. Focus on Huang Wei Wetland Tourism Resort with a total investment of 654.38+04 billion yuan, Sunac Cultural Tourism Complex with a total investment of 22 billion yuan in Wuyi Ancient Town, Jin Peng Xianju Guxia Characteristic Town with a total investment of 5 billion yuan, Broadcom Industrial Park with a total investment of 600 million yuan, Chuzhou Tian Jun Medical Center with a total investment of 500 million yuan, and Chuzhou Clifford Ecological Cemetery with a total investment of 200 million yuan, and strive to start construction as soon as possible.
The fourth is to keep an eye on the target and do a good job of scheduling. Continue to keep a close eye on the expected goals of the project construction throughout the year, strengthen the contact, communication and linkage between departments, adhere to the system of district leaders helping 44 key projects, and give full play to the large-scale coordination and supervision role of district leaders to ensure the realization of the construction goals throughout the year. Strengthen all kinds of scheduling. The project dispatch meeting will be held every month, the joint meeting of the district leading group will be held every quarter, the special dispatch meeting will be held in due course, and the special coordination meeting will be held as needed. For units that cannot complete the project construction tasks, they will take the form of issuing assignment lists and interviews to ensure that the responsibilities are in place and the tasks are completed in place. At the same time, the performance office will incorporate the scheduling effect into the efficiency evaluation system and make good use of the results.
Second, the economic operation
1. Completion: In the first half of this year, the fiscal revenue data has been approved by the municipal level. According to the feedback, the fiscal revenue1181000000 yuan, up by 12.6% year-on-year, the total amount exceeded the target100000 yuan, and the growth rate was 0.6 percentage points faster than the target. Six indicators of industrial added value above designated size, investment in fixed assets, total retail sales of social consumer goods, per capita disposable income of urban residents and per capita disposable income of rural residents have been statistically reported. According to the report, the added value of industrial enterprises above designated size increased by 10%, exceeding the target by 0.5 percentage points; Investment in fixed assets increased by 32%, exceeding the target 17 percentage points; The total retail sales of social consumer goods was 65.438+82 billion yuan, which was 50 million yuan lower than the target, with a year-on-year increase of 654.38+0.08%, exceeding the target by 4.7 percentage points; The per capita disposable income of urban residents was 17 158 yuan, which was lower than the target of 369 yuan, up by 46% and 36.3 percentage points faster than the target. The per capita disposable income of rural residents 123 12 yuan is higher than the target of 3 123 yuan, with an increase of 23% and faster than the target of 3.2 percentage points. Regional GDP and added value of service industry were not reported as sub-data. According to the calculation, the regional GDP is estimated to be 5.297 billion yuan, which is 0.1.300 million yuan lower than the target, with a year-on-year increase of 7.4% and 1.6 percentage points lower than the target. The added value of service industry was 65.438+0.468 billion yuan, with a low target of 32 million yuan, an increase of 6%, 6 percentage points lower than the target. Realize new projects of over 100 million yuan 19; Nine newly completed projects with a total investment of over 100 million yuan.
Judging from the completion of the above data, six major economic indicators, such as fiscal revenue, added value of industrial enterprises above designated size, investment in fixed assets, total retail sales of social consumer goods, per capita disposable income of rural residents and the number of newly started projects above 100 million yuan, have achieved double and half tasks, while four indicators, such as regional GDP and added value of service industry, per capita disposable income of urban residents and the number of newly started projects above 100 million yuan, have not achieved double and half tasks, and the growth rate of most indicators is around four or five in the city.
2. Section III Objectives and Measures:
In the third quarter, it is preliminarily suggested that the GDP of the whole region increase by 9% and the investment in fixed assets of the whole society increase by 18%.
Regional GDP: Strictly implement the system of economic operation monitoring and analysis meeting, and implement overall planning. The lead unit of regional GDP composition index should strengthen departmental linkage and cooperation to form a joint force; It is necessary to do a good job in investigation and analysis, form a scientific and reasonable guiding plan, make specific work detailed and practical, and put the target plan into concrete actions. At the same time, it is necessary to strengthen the contact between departments in the specific operation process to avoid unnecessary difficulties and problems caused by poor information or specific operation details. The district development and reform commission should do a good job in overall lead service and coordination, and the district statistics bureau should do a good job in business guidance and reminder, and strengthen dispatching according to statistical laws.
Investment in fixed assets: First, continue to plan new projects to be put into storage, and at the same time improve the investment declaration procedures for projects that have started more than 50 million yuan, focusing on projects that have started in the last two months 1 1 100 million yuan to ensure investment as soon as possible; Second, for the projects that have been put into storage, it is necessary to urge the project units to declare investment in time, focusing on coordinating the declaration of a number of real estate projects such as Bihu Yunxi and Fulicheng; The third is to fully promote the landing of 44 district-level key projects and new investment projects, enhance investment stamina and optimize investment structure.
Key plan year-end summary 2 xx work summary:
1, carry out routine work, plan first: combine the reality of our school, brainstorm on the basis of all the teachers' discussion on last semester's work, make the school teaching and research plan, and then make individual teaching plans for each discipline according to the school teaching plan. It ensures the orderly teaching, teaching and scientific research activities at all levels of the school.
2. Carefully organize all-staff training to improve the overall quality of teachers: organize teachers to actively participate in the training of all kinds of teaching materials at all levels in the region and strive to improve the quality of teachers. Guide teachers to establish the concept of lifelong learning, stimulate their own vitality, and urge each teacher to actively participate in teaching and research, training and teaching activities, forming a strong teaching and research atmosphere in the school.
3. Adhere to the sign-in system for preparing lessons in the first week: according to the arrangement of the town teaching and research section, adhere to the activities for preparing lessons in the first week. Teachers will focus on "preparing lessons and completing homework in class", clarify teaching objectives, clarify teaching ideas, understand teaching concepts, plan teaching processes and create problem situations. The teaching and research team leader checks the preparation of lessons for the next week every Friday and signs it.
4. Seriously study the problem-based teaching mode: at the beginning of this semester, we organized and discussed three "ideal classroom" observation classes. Every teacher is required to deliberately create problem situations in teaching, actively guide students to analyze, and cultivate the ability of induction, judgment, reasoning and synthesis and the ability to use knowledge.
5. Actively carry out ideal classroom competition activities. According to the arrangement of the town teaching and research section, the school organizes an ideal classroom competition every month to encourage teachers to actively participate in activities. The school actively organizes teachers to listen to each other, discuss the advantages and disadvantages of each class in depth, brainstorm, let the teaching teachers find their own shortcomings, make clear the direction of future efforts, let the teaching teachers learn from the strengths of others, make up for their own shortcomings, and make progress.
6. Actively carry out large-scale reading activities to create a scholarly campus. Last semester, the school provided teachers with educational books such as Mastering Efficient Learning Methods, Learning Methods of Good Students, and How to Teach Wonderful New Courses, which were directly put in the office for teachers to read. Through the reading activities of the third reading festival, teachers' teaching theory level and practical research ability are improved. The school actively encourages students to carry out large-scale reading activities and advocates students to read more books, read good books and study hard. By building a "scholarly campus", teachers and students can truly experience a book that can make us happy all our lives!
7. Hard-pen calligraphy practice and competition activities were carried out: according to the actual situation of our school, hard-pen calligraphy was actively practiced one day, and new and old teachers helped each other. This paper discusses the strokes and stroke order of chalk characters in order to promote the real improvement of teachers' personal quality. During the celebration of New Year's Day, the "Celebrating New Year's Day Teacher Hard Pen Calligraphy Competition" was held, which greatly mobilized the enthusiasm of teachers to practice calligraphy.
8. Make full use of agricultural resources to serve teaching: every teacher is required to use agricultural equipment resources and attend classes for at least two hours a week; All teachers are trained once a month on the application of rural remote equipment and resources, and teachers are required to actively download rural remote resources for secondary development and classified applications.
12 new semester plan:
1. Carry out routine teaching and strengthen management: strengthen routine teaching management, realize standardization and institutionalization of teaching management, strictly control lesson preparation, class, homework correction, counseling and unit pass test, further improve the corresponding management system and strengthen process management; Adhere to the preview and early sign-in system; Implement the system of leaders attending lectures and evaluating classes, and communicate face to face with teachers to improve the quality of classroom teaching.
2. Continue the "problem-based" classroom teaching reform, improve the teaching quality in an all-round way: actively carry out ideal classroom competition activities. Classroom teaching is the central link of teaching work. After the start of the new semester, we should first do a good job in every class, implement every knowledge point and arrange every homework problem so that every student can gain something. While trying to improve teaching methods, we should also pay attention to guiding students' learning methods and promote the optimization of teaching methods with the optimization of learning methods.
3. Actively carry out large-scale reading activities: through reading activities, improve teachers' teaching theory level and practical research ability. The school will enrich indoor books to the book corner of each class in batches, enrich students' reading content, enable students to read books at any time, cultivate students' interest in extracurricular reading, enrich students' extracurricular life, broaden their knowledge and increase their intelligence.
4. Strengthen school-based training activities: based on the school, based on the post, and proceeding from the reality of teachers, the key content of school-based training is to rebuild the ideal classroom pioneered by the whole region and carry out colorful school-based training in the form of competition or excellent course selection. Guided by scientific research, we will organize competent and enterprising leaders and teachers to form a scientific research team, and conduct a special discussion in combination with the district-level project "Group Independent Cooperative Learning" undertaken by our school. Improve teachers' personal quality through Putonghua and pen and ink competitions.
5. Do a good job in network research: continue to make good use of rural resources for teaching and research, make full use of network resources, actively carry out and implement network teacher training, and strive to improve teachers' network research literacy and teaching and research awareness.
Looking forward to the new school year, we believe that under the correct leadership of the central school and the joint efforts of all teachers, we will certainly achieve better results.
Since 3 __ years, under the correct leadership of mine leaders, with the strong support and active cooperation of various departments and teams, the dispatching room has completed the actual work of the dispatching room with the working principle of improving "execution" and according to the annual work arrangement of management departments at all levels and mine leaders, giving full play to the role of the command center in the coordinated dispatching of safety production. Monitoring personnel actively carry out various tasks, strive to improve their business skills, and strive to do a good job in safety monitoring and maintenance. Based on the production plan and work arrangement of our mine, the dispatcher carefully organized and directed the production scheduling, successfully completed various tasks and objectives, and ensured the smooth progress of safety work.
A, _ _ year safety work summary
(1) Production situation
The mining of _ _ working face 1 0,309 meters and the mining of _ _ working face 7 16 meters were completed throughout the year. From February 26th, 65438 to February 25th, 65438, the annual statistical output of electronic scales was: X tons. The general sales communication in advance is timely and accurate, and the temporary tasks are explained in detail and arranged reasonably.
4, earnestly scheduling meeting records, recording, to serve the safety in production.
5. Establish and improve various management systems for dispatching and monitoring; More than 40 records, reports, ledgers, abstracts, etc. Schedule and monitor according to the requirements of standardization of safety production, have complete original records and file management, fill in charts on time, and regularly archive and save scheduling data.
(3) Safety monitoring part
In 1. year, our mine upgraded the safety monitoring system, realized the integration and emergency linkage of the safety monitoring system, personnel positioning system and emergency broadcasting system, and met the document requirements of the notice issued by ja Administration of Work Safety on 065438+10.3. During the transformation, the monitoring personnel in the dispatching room actively cooperated with the installation factory to replace and lay the signal transmission optical cable, and installed the monitoring substation, power supply and various sensors, so that the safety monitoring system formed a ring network. After _ _ days' efforts, from late April to mid-May, the safety monitoring system was upgraded, installed and debugged. Organize monitoring personnel to seriously study and master the upgraded safety monitoring system.
2. In June, 307 and 308 gas-electricity locking devices were debugged and perfected, and the dispatching room was remotely powered off and failed to lock. After confirmation, normal sensor calibration and gas-electricity locking test were conducted every 15 days.
3. Installation and removal of underground safety monitoring system: In _ _ years, we removed 309 working face, strong drainage coal bunker, 307 Pishun coal bunker, 307 auxiliary coal bunker, 308 Huishun coal bunker and 307 auxiliary coal bunker temporary refuge chamber and temporary first aid station, ground raw coal bunker shaft equipment, and carried out daily inspection, maintenance and standardization work to ensure the normal operation of the equipment.
4. On the basis of the existing positioning substation, the invention tracks and installs the positioning substation for the fully mechanized working face equipment train, the fully mechanized working face, the standby working face and the tunneling working face according to the mining situation; Ensure the normal operation of the system and correctly monitor the real-time position of underground personnel.
5. Installation and maintenance of video, network, communication, television and other issues in ground office buildings, industrial sites, joint buildings, dormitory buildings and special places in coal mines.
6, the normal maintenance of dispatching communication system, installation, inspection, and the addition of key places stipulated in the coal mine safety regulations and all dispatching direct telephones for up and down wells.
Second, the _ _ year work plan
1. according to the production succession plan of x coal mine, the annual output of the whole mine is x million tons, the annual penetration rate of comprehensive excavation is x meters, and the annual sales volume of coal is x million tons. Conduct safety production scheduling to ensure the completion of the safety production plan of _ _ _.
2. Conscientiously implement the leaders' notices and instructions on production safety, and check the implementation of each department.
3, actively cooperate with relevant departments, focus on solving problems and contradictions that affect balanced production, and urge all units to check and implement, to ensure the orderly production.
4. Further strengthen the standardization of production safety in the dispatching room, continue to standardize the filling and filing of all kinds of documents, records, ledgers and statements as required, and finish the work accurately and on time item by item.
5. Strengthen business study, comprehensively improve the comprehensive quality of dispatchers, regularly check the dispatching knowledge every month, broaden the knowledge, continuously improve the dispatcher's ideological consciousness and business level, and then learn the rules.