How to match different professional quotas with ingenious calculation list pricing?
If you use the civil template to do the project, you should use the municipal subtitle when setting the quota. How to transfer the municipal quota in civil engineering? Here are three methods: ① Multi-document operation method. Select "Open Project Cost" from the main menu, find the directory where the municipal software is located, and open the "Municipal Template" file. After opening the project template, specify the quota library path of the directory where the municipal software is located in the "quota library path" column of the engineering information insert, thus opening two project files at the same time (so-called multi-document operation). Select the main menu "window/window (left and right) arrangement" to arrange the documents, and then drag the required letters directly from the "set quota" insert of the municipal template to the civil set price window (drag the subtitle across projects). Complete the cross-disciplinary quota application. (2) Modify the list of division names in the insertion of [engineering information]. First, go to the [Engineering Information] insert. In the [List of Division Names] window in the lower right corner, open the mixed division file of "Civil Engineering+Decoration+Installation+Municipal Administration", and then go to [Set Quota] to insert. At this point, you can see that the municipal quota allocation has been listed in the "List" refreshed in the [List of Department Names] window in the lower left corner. (3) Set the quota from the engineering documents. First take the municipal subtitle to be used into a temporary municipal engineering document, and then return it to the civil engineering. Select the function of "Drag Engineering Library Quota" in the [Price Library] window to open the municipal engineering file and drag the subtitle. Sometimes this method borrows the existing engineering subtitle, which can save the trouble of conversion. [Description]: The premise of mixed quota is that all the quota banks of mixed quota specialty have been purchased.