Construction significance
Zengcheng to Dongguan expressway is an important part of expressway network in the Pearl River Delta. It is connected to the third phase of Guanshen Expressway and Dongguan Ring Expressway in the south, and the Zengcheng-Huadu New Airport Expressway planned for the second phase of North Third Ring Road in the north, in which Shitan Interchange is connected to Guanghui Expressway, with a total length of 13.887 km. Two-way six-lane. It only takes about 1.29 kilometers from Shenzhen to Guangzhou through Guanshen Expressway, Zengwan Expressway and Guanghui Expressway, and it only takes about 1.5 hours to really connect Shenzhen and Dongguan with rich eco-tourism resources in the south.
Zengguan expressway started construction in April 2005 and opened to traffic on June 29, 2008.
detail
Traffic area
Dongguan exit/entrance, Zengcheng District, Guangzhou
The names of the entrances and exits in this area can lead to this area. Remarks: Guangzhou Zengcheng G324, S 1 19, Zengcheng connecting Huatuan Expressway Shitan Interchange G35, Huizhou and Guangzhou connecting Guanghui Expressway Shitan X29 1, S379, Shitan Dongguan Shijie G94, Shenzhen Guanlan, Huancheng Road, Shijie, etc. The above is the introduction of Jianwang to Zengwan Expressway. For more information about expressways, please pay attention to the architectural knowledge column of Zhong Da Consulting.
For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.