The first move: look at five cards.
Seeing five certificates is the first link of quality assurance.
Five certificates include: land use right certificate, construction land planning permit, construction project planning permit, construction project construction permit and pre-sale permit of commercial housing.
The second measure: look at five sides.
Five aspects are the key to engineering quality assurance.
The five parties include: development unit, geological exploration unit, design unit, construction unit and project supervision unit.
The third measure: watch the whole process.
The completion acceptance report must be optimistic.
1, see the site safety and civilized construction;
2, check whether the quality supervision station personnel approach;
3. Look at the quality of materials used in key processes.
The fourth measure: look at the details.
Pay attention to observe whether the wall surface is flat without ups and downs, whether the ground is flat without sand, whether the door and window borders are dense and seamless, and whether the bathroom and kitchen floors are leaking.
The fifth measure: look at the collocation.
Supporting facilities include: elevator quality; Materials and installation quality of water, electricity and gas pipelines; Air quality and exterior wall decoration quality.
The sixth measure: look at the warranty.
1, residential design life;
2, residential seismic design grade;
3. Obtain the residential quality guarantee and residential instruction manual.
(The above answers were published on 20 17-02-24. Please refer to the actual situation for the current purchase policy. )
Click to view more real estate information.