Application materials 1, declaration form for fire control acceptance of construction projects;
2, a copy of the "building fire design audit opinion";
3, electrical facilities fire safety inspection report;
4, building fire control facilities technical inspection report;
5, Shandong province fire facilities installation and construction technical documents;
6, building steel structure fire detection report;
7, fire product quality certificate;
8, fire products sampling report (see Annex 2, 3);
9, building interior decoration materials sampling inspection report;
10, decoration material quality certificate;
1 1, report of urban fire alarm monitoring service system;
12, others.
Licensing conditions Where industrial and civil buildings (structures) are newly built, rebuilt, expanded and internally decorated within the administrative area of our city, they shall apply for fire control acceptance of construction projects after completion.
1. The fire protection design of the building project has been completed according to the examination and approval opinions, meeting the requirements of relevant national fire protection technical standards, with complete completion data and legal form.
2. The project has entrusted a fire detection company with fire detection qualification to conduct fire detection, and issued a fire detection report.
Licensing program 1. Window acceptance, window personnel issued a "fire service acceptance notice";
2. On-site acceptance by fire control acceptance personnel, and issue opinions on fire control acceptance of construction projects;
3. After the expiration of the commitment period, the construction unit shall go to the window to receive the Notice of Acceptance of Fire Protection of Construction Project with the Notice of Acceptance of Fire Protection Business.
The license period is 17 working days.
The arrival hall promises that general projects will be handled in 17 working days, and projects that need collective discussion 17 working days will be organized by the provincial corps and submitted to the provincial organization for acceptance.
The handling place is Qingdao Public Security Fire Bureau and the public security fire detachments of all districts and cities (with office address and contact telephone number attached), and the municipal public security fire bureau accepts business in the municipal administrative examination and approval service hall (No.0/7, Hong Kong Middle Road, Shinan District, Qingdao). The division of labor is as follows:
(a) the Municipal Public Security Fire Bureau is responsible for the acceptance of the following projects:
1, the following projects in four districts of the city (south, north, Sifang and Licang):
(1) Construction projects newly built, rebuilt and changed for use.
(2) Interior decoration works with a building area of more than 500m2 and equipped with automatic fire fighting system.
(3) Install automatic fire fighting facilities.
2. The following projects in three districts and five cities (Laoshan, Chengyang, Huangdao, Jimo, Laixi, Jiaozhou, Jiaonan and Pingdu):
(1) National, provincial and municipal key projects.
(2) High-rise civil buildings and high-rise industrial buildings.
(3) Multi-storey public buildings with a single floor area greater than 10000m2.
(4) independent underground public building area is more than 2000m2, and the underground public building area is more than 2000m2.
(5) Workshops and warehouses with single building area greater than 10000m2.
(6) Four-level and above oil depots and oil loading and unloading docks (the total volume is greater than 1000m3).
(7) Chemical projects with an area of more than 5000m2.
(eight) other special construction projects.
(two) in addition to the above projects, the district (city) brigade is responsible for the acceptance of other construction projects within its administrative area.
Tel: 859 16595 859 16596.