Earthwork contract

With the general improvement of people's legal awareness, contracts are used more and more widely, which can protect civil legal relations. What kind of contract have you seen? The following is a sample of earthwork contract (generally 5 copies) carefully arranged by me, which is for reference only and I hope it will help you.

Earthwork Contract 1 Our company plans to build _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

I. Overview of the Project

1. Project name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

2. Construction site: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

3. The planned investment is RMB _ _ _ _ _ _ _ _.

4. Functional layout: See the decoration design and construction drawing provided by the owner for details.

5. Engineering category: whole building decoration engineering.

Second, the project bidding scope

For details, please refer to the construction drawing of decoration design provided by the owner (including lighting, sanitary ware and corresponding pipelines). Interior decoration construction process

Third, the way of contracting.

1. According to the Bidding Law and other relevant regulations, this project is signed by the employer and the construction unit in accordance with the bid-winning price, bidding time limit, bidding quality grade and other provisions in this bidding document, as well as the relevant provisions of the Contract Law, and adopts the contracting methods of contracting labor, materials, time limit and quality.

2. Charge standard

2- 1. Civil engineering: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

2-2. Installation works (including water and electricity installation, heating and ventilating, and pipeline laying): the expenses are calculated according to the current quota, and the budgeted price of materials is implemented according to the current market price.

2-3. Decoration works: the fees are charged according to the current quota, and the budget price of materials is subject to the document * Jian Jian [2002] No.08, and the charging standard is subject to the document [1999] No.296 and related supporting documents.

1. The quotation for this project as a whole does not include labor insurance fund (the labor insurance fund shall be paid in advance by the employer according to the relevant regulations before the bid opening, and shall be accounted for according to the actual scale after the bid opening, and the overpayment and underpayment shall be included in the total cost).

Four, the main material supply and quality requirements

The procurement of materials shall be inspected by the owner and Party B, and can only be used after the consent of the owner and supervisor.

Verb (abbreviation of verb) construction period

The construction period (calendar days) of this project is determined as _ _ _ _ _ _ days with reference to the current national construction period quota and in combination with the actual situation of the owner; Bidders can determine their own bidding period according to their own actual conditions.

Item quality of intransitive verbs

According to the current national construction acceptance specifications and quality standards, the project quality must meet the requirements of engineering design and current specifications. After completion, the quality grade must reach the excellent standard after acceptance by the local quality supervision department.

Seven, the contract signing requirements

1, the winning bidder shall not subcontract the project; If subcontracting is found, the construction management department will investigate and deal with it according to the regulations. After the approval of the Municipal Bidding Office, the construction unit has the right to choose the top construction unit among the unsuccessful units.

2, in strict accordance with the relevant provisions of the state and the relevant requirements of the "contract law" signed a construction contract.

3. Project settlement: the bid price of this project is taken as the basis for project price settlement; Increase or decrease (that is, the workload that has not been calculated at the time of bidding or increased or decreased due to design changes), as well as the changes in charging standards and material budget prices caused by changes in national policies during the contract period, shall be adjusted.

The project settlement is entrusted to _ _ _ _ _ _ _ for approval.

4. Appropriation of the project price: after the signing of the construction contract and _ _ _ days before the project starts, the project preparation fee shall be paid in advance at _ _ _% of the bid price; Thereafter, 60% of the construction and installation workload actually completed last month will be allocated monthly.

When the project payment (including material preparation payment and progress payment) is paid to _ _ _ _% of the bid price, the payment will be stopped; The remaining _ _ _ _% shall be paid within two years after the project is completed and accepted and meets the contract requirements.

5. Liability for breach of contract and reward and punishment measures:

5- 1, this project implements high quality and good price, and if it is assessed as an excellent project after completion and acceptance, it will be rewarded according to _ _ _% of the bid price; If the quality level fails to meet the bid-winning promise, it will be punished according to _ _ _% of the bid price.

5-2. This project is required to be completed within the bid winning time limit; Two ten thousandths of the tender price will be rewarded and punished for each day of delivery in advance or delay.

5-3. If the construction period of this project is delayed due to the reasons of the construction party, it shall pay liquidated damages to the construction party at the rate of two ten thousandths of the winning bid price every day.

Eight, bidding instructions

1. The bidder shall pay a bid bond of RMB _ _ _ _ _ _ _ _ _ _ ten thousand yuan to the tenderee at the same time of obtaining the tender.

2. After winning the bid and before signing the contract, the bidder shall provide the bid performance guarantee contract to the tenderer to ensure that once the bidder wins the bid, it will sign the contract in accordance with the relevant provisions of the bidding documents to complete the winning project; Bidders who fail to provide bid performance guarantee as required will be regarded as not responding to the bid conditions and rejected, and their bid bond will not be returned.

2- 1. Form of performance guarantee: cash guarantee.

2-2. Guarantee amount: the performance guarantee amount is RMB _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

2-3. Validity period of performance bond: The validity period of bid bond is the approved completion period of the winning project.

3, the project site inspection and bidding questions and answers:

3- 1. On a certain day in _ _ _ _ _ _ _ _

3-2, this project in _ _ _ _ _ _ _ _ _ _ _ years _ _ _ _ _ _ The bidder shall put forward his own opinions on ambiguous issues such as bidding and construction design, and then the tenderer shall give a written reply together with the design unit.

4, tender offer value:

The upper limit of tender offer is _ _ _ _ _ _ ten thousand yuan;

The lower limit of the tender offer is _ _ _ _ _ _ _ ten thousand yuan.

5. Preparation, sealing and delivery of tenders

5- 1. Bidding documents include commercial bidding documents and technical bidding documents.

5-2. The contents of the commercial tender include:

5-2- 1. Business standard A: Response to the bidding documents; Ability and credibility; Comprehensive description (i.e. project name, scope, quotation, quality grade, construction period, warranty commitment, etc.). ); Signature of the bidder and legal representative; List of members of project management department; And other documents and certification materials that need to be explained.

5-2-2. Business Bid B: Bidding Quotation and Letter of Commitment.

Bind the above information into a book in duplicate (one original and one copy). Among them, the bidder and the legal representative must sign and seal the tender offer and letter of commitment.

5-3, technical tender is mainly the construction organization design; This project requires the bidder to provide the construction organization design in seven copies; The requirements are as follows:

5-3- 1, the chapters in the technical tender are arranged in the following order and requirements:

Nine, bid opening, bid evaluation and calibration

1. This project is scheduled to be opened in public on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

2. The personnel that bidders must attend the meeting are: the legal representative or the agent entrusted by the legal representative (with the power of attorney of the legal person), and the project manager who bids for this project, with a total number of no more than 5 bidders;

3, all participants must attend the meeting on time, and abide by the rules and regulations and discipline of the bid opening site.

4. The following materials shall be submitted at the bid opening site:

4- 1. Original enterprise qualification certificate and business license;

4-2, legal person certificate (or power of attorney) and the corresponding original ID card;

4-3, project manager certificate, project technical director certificate and the corresponding original ID card;

4-4. Valid certificates and documents of the construction administrative department.

5. The bid evaluation method of this project adopts the comprehensive evaluation method in Chen Jianzhaozi No.6 (there is no pre-tender estimate, but the upper and lower limits are specified in the bidding documents). See attached table 1, attached table 2, attached table 3, attached table 4 and attached table 5 for the score table and weight values.

6. The winning bidder of this project is determined by the way that the person with the highest score according to the evaluation results is the winning bidder.

Ten, one of the following circumstances, bidding or bidding qualification is invalid.

1, the tender is not sealed as required, and the commercial tender is not stamped with the official seal of the unit and the signature of the legal representative;

2. If the technical tender is not prepared and printed as required, the technical tender is invalid;

3, the tender is not delivered to the city trading center within the specified time;

4. A tender has two quotations;

5. The tenderer is late after the bid opening;

6. The legal representative of the tenderer or his entrusted agent did not attend the bid opening meeting;

7. The entrusted agent attends the bid opening meeting without a power of attorney;

XI。 any other business

1. After winning the bid, the bidder shall go to _ _ _ _ _ _ _ within ten days to receive the bid-winning notice issued by the tenderer and filed by the Municipal Bidding Office; If the unsuccessful unit requests reconsideration of the bid evaluation and calibration results, it shall submit a written request to the tenderer and the municipal bidding office within ten working days, and it will not be accepted within the time limit.

2, the winning bidder with the letter of acceptance within seven days, signed a construction contract with the owner, obtain the construction permit rear can enter the site for construction.

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Earthwork Contract 2 Party A: (agency) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Contact address: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party B: (principal) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Contact address: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

In order to give full play to the advantages of both parties, according to the Contract Law of People's Republic of China (PRC), Party A and Party B have reached the following agreement through full consultation on the principle of equality, voluntariness and equal compensation:

I. Entrusting matters

Party A accepts Party B's entrustment, provides Party B with information about this project, and finally facilitates Party B to sign a professional contract for this project with the construction unit.

Two. Obligations of Party A

1. Party A shall provide Party B with information about the project, and shall be obliged to assist Party B to conduct on-the-spot investigation on the project and related business matters.

2. Party A promises to provide Party B with true and reliable project information.

Three. Obligations of Party B

1. Party B is responsible for providing qualification certificates, business licenses and other relevant materials; Responsible for contract negotiation with the construction unit.

2. If the intermediary is successful, Party B will fully perform the professional contract signed with the construction unit. Party B's rights and obligations arising from the performance of this contract have nothing to do with Party A. ..

3. If the intermediary is successful or the engineering materials provided are valid, Party B shall pay the intermediary remuneration to Party A as agreed.

Four, the amount of intermediary remuneration, payment time and payment method.

1, total project agency fee _ _ _ _ _ _ _ _

Project information fee _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Project commission _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

I. Project Information Fee

Projects with a decoration area of _ _ _ _ ㎡ (inclusive) and projects with a price of _ _ _ _ _ _ _; _ _ _ _ ㎡ project decoration area, _ _ _ _ yuan project.

B project commission: _ _ _% of the net contract amount.

1) The broker only provides engineering information, and it is not recommended to negotiate directly with the construction unit. The broker succeeded in making a commission of _ _ _ _ _ _ _ _%.

2) The broker and introducer directly negotiated with the construction unit and participated in the contract negotiation, and the broker successfully got a commission of _ _ _ _ _ _ _ _%.

3) The net contract amount refers to the contract amount after deducting the _ _ _ _ _ _% tax of the rebate from the construction unit.

4) When the broker can assist in the negotiation and get higher profits, the amount of project commission can be negotiated.

2. Payment of project information fee: Party B's participation in the quotation of the construction unit can be tracked by the customer and paid within two weeks after the quotation.

3. Project royalty payment: after the contract is signed, the project will be paid one by one in proportion to the progress payment, and each payment will be paid within one week after the progress payment is received, or once after the project is accepted. The specific way can be agreed by both parties separately.

4. Party B can pay by transfer or cash.

Verb (abbreviation for verb) confidential matter

1. Both parties shall fully keep the business secrets involved in this agreement.

Termination of intransitive verb agreement

1. After this agreement comes into effect, it will be valid for _ _ _ _ _ _ _ years.

Seven. any other business

1. Party A shall not delegate the matters entrusted in this agreement.

2. This Agreement shall be made in duplicate, one for each party, and shall come into force after being signed and sealed by both parties.

Party A: (Seal) _ _ _ _ _ _ _ _ _ _ Party B: (Seal) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Legal representative or entrusted agent: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Contact information: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

The third entrusting party of the earthwork contract: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ (hereinafter referred to as Party A)

Contractor: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ (hereinafter referred to as Party B)

Through friendly negotiation and based on the principle of mutual respect, Party A entrusts Party B with the production business. In order to clarify the responsibilities of both parties and ensure the completion of the task, both parties jointly abide by the contract, and through consultation, the following agreement is signed for both parties to abide by and implement.

I. Main requirements:

(1) Project name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

(2) Installation location: _ _ _ _ _ _ _ _ _ _ _ _ Installation location: _ _ _ _ _ _ _ _ Installation location

(3) Other contents: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

(4) Total budgeted cost: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

(5) Method of providing technical data and drawings: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Second, the production cycle:

The content of this contract starts from design and production, and the date is _ _ _ _ _ _ _ _ _ _.

Third, the settlement method:

1. On the signing date of this contract, Party A shall pay _ _% of the total cost to Party B as the advance payment for entering the site, totaling RMB _ _ _ _ _ _ _, and the remaining _ _% shall be settled in one time within 150 days after the completion of the project installation, and the remaining _ _ _% shall be settled as the quality guarantee after half a year.

2. During the execution of the contract, after the contents added outside the contract are approved by both parties, Party A will pay 50% of the money first, and the remaining 50% will be paid in one lump sum after passing the acceptance.

Four, construction, demolition and design changes:

1. Party B shall organize production as required and reach the qualified standard.

2. During the construction, Party A shall actively cooperate with Party B's on-site coordination.

V. Project Delivery and Warranty:

1. Party B shall notify Party A for acceptance within two days after the completion of the project. If it is not accepted within the time limit, if Party A uses it, Party B will pass the acceptance.

2. In the process of acceptance, if quality problems caused by Party A are found and suggestions for rework or repair are put forward, Party B shall complete the work within the specified time limit and charge corresponding fees. If quality problems are caused by Party B, Party B shall replace them free of charge.

3. The warranty period of the project is 1 year (except man-made and irresistible natural disasters).

VI. Project leader and industrial accidents:

1. Party A shall appoint the person in charge of the site, and the person appointed by Party B shall be the person in charge of the site, and * * * shall perform all the terms of this contract.

2. Party B shall educate the workers, strictly abide by the operating rules, do a good job in fire prevention and theft prevention, and abide by the relevant regulations of the construction site. Party B shall be responsible for the losses caused by industrial accidents during the construction.

Seven, special instructions:

If power supply is needed at the project site, it should be arranged within the range of 1 m from the product. On-site installation positioning and other matters related to installation coordination shall be solved by Party A;

Eight, other terms:

1. When examining and approving the design content, the entrusting party shall carefully examine every detail of the project and sign or approve the description after examination and approval. If it is confirmed to be wrong, the entrusting party shall bear all the responsibilities and contents.

2. After signing the contract, if there is any unilateral breach, the breaching party will bear all responsibilities. If either party needs to change this contract or other special requirements, it must be agreed by both parties through consultation. Sign a supplementary contract separately.

3. Annex to the contract

1.____________________________________________________________

2.____________________________________________________________

Nine. Dispute resolution:

In case of any dispute during the execution of this contract, both parties shall try their best to solve it through negotiation. If negotiation fails, either party may arbitrate in an arbitration institution with jurisdiction or bring a lawsuit in court.

1. The annexes and supplementary contracts of this contract have the same legal effect as this contract.

2. This contract is made in quadruplicate and shall come into effect after being signed and sealed by both parties.

Party A: Party B:

Address: Address:

Tel: Tel:

Business Representative: Business Representative:

Date of signature: year month day.

Earthwork Contract 4 Party A:

Party B:

The project undertaken by Party B (hereinafter referred to as the project) is a * * building with a total construction area of square meters, and the total project cost is RMB10,000.00 Yuan. Party A and Party B agree to cooperate in the construction of this project and reach the following terms:

1. The construction of this project is independently organized and accounted for by Party B, and is responsible for its own profits and losses. The funds, materials and labor required for the construction shall be prepared by Party B, and Party B shall be responsible for the organization. The realized after-tax profits shall be owned by Party B, and the losses incurred by the project shall be borne by Party B, which has nothing to do with Party A. ..

2. All taxes and fees (including business tax and enterprise income tax) that should be paid by relevant departments for this project shall be paid by Party B; Party B is responsible for recovering or paying off all creditor's rights and debts arising from the project construction, and Party B is responsible for paying workers' wages, and shall not default on workers' wages. All taxes and fees shall be paid by Party B before the completion of the project, otherwise Party A will not go through the completion acceptance formalities, and Party B shall bear the relevant responsibilities.

3. Party B shall organize the construction management organization according to the project manager's responsibility system, and be equipped with enough engineering and technical personnel, quality engineers and safety officers. The person in charge of the project is responsible for the construction management of the whole process of the project to meet the construction period requirements and project quality standards of the construction unit. If the project is not up to standard, a fine will be imposed on the substandard part according to the construction area per square meter. Safety production and civilized construction have reached the excellent rate index issued by Zhongshan Construction Bureau. Party B must implement the national laws and regulations on safety in production, ensure construction safety, and bear all losses and responsibilities caused by safety accidents.

4. The project payment shall be transferred to Party A's account, and the balance shall be transferred to Party B within three days after Party A deducts management fees and taxes. Party A is responsible for the settlement of this project, and Party B provides the accounts and tax invoices of subcontracted projects.

5. Party B must implement the national regulations on building warranty and undertake the warranty responsibility after the project is completed and accepted.

The responsibility of intransitive verb Party A:

1, responsible for providing construction application materials for this project.

2. Party A shall be responsible for the on-site supervision of the technical guidance, supervision and consultation of the implementation project.

3. Supervise the quality, safety and civilized construction of construction projects.

4. Review the project completion acceptance data and assist the owner to organize the completion acceptance.

Seven. The management fee paid by Party B to Party A is 65,438+0.2% of the total project cost. The management fee is deducted every time the first phase of the project is received.

Eight. Contents of the agreement of Party A on the project industry.

Nine. This contract shall come into effect as of the date of signing, and both parties shall abide by it. This contract is made in duplicate, each party holds one copy, and the project completion acceptance meets the requirements. After all the money and taxes are settled, other terms will be terminated except the relevant warranty terms; After the warranty period expires, the warranty terms are terminated.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Entrusting party of the fifth contract earthwork: _ _ _ _ _ _ _ (hereinafter referred to as Party A)

Trustee: _ _ _ _ _ _ (hereinafter referred to as Party B)

Party A entrusts Party B to manage _ _ _ _ _ _ _ _.

Article 1 Business object

Name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Location: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Work area: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Article 2 Scope and Content of Work

_______________________________________。

Article 3 Cleaning tools and some consumables

_______________________________________。

Party B undertakes the contract by contracting, and Party B is responsible for the operation machinery and supporting tools.

Article 4 Contract Fees and Settlement Methods

_______________________________________。

Article 5 Construction period

The commencement date of Party B shall be notified by Party A, starting from _ _ _ _ _ _ _ _ _ _ _ _ (In case of delay due to irresistible reasons such as overall project delay and cross-construction, the final date negotiated by Party A and Party B shall prevail. )

Article 6 Special expenses for business outside the contract

Party A entrusts Party B to bear the business expenses beyond this contract, which shall be decided by both parties through consultation in advance.

Article 7 Responsibilities and Obligations of Party A

1. Supervise and inspect Party B's cleaning work;

2. Provide Party B's operators with necessary working conditions such as water, electricity (safe electricity use) and warehouses for storing equipment and cleaning agents;

3. Coordinate the relationship with relevant departments in Party B's work;

4. Pay Party B's service fee in time.

Article 8 Responsibilities and Obligations of Party B

_______________________________________。

Article 9 Liability for breach of contract and contract change

1. Party A has the right to punish Party B for quality problems and illegal operations during the operation.

2. During the term of the contract, if either party fails to perform the contract for reasonable reasons, it shall notify the other party in writing _ _ _ _ _ days before the termination of the contract, otherwise, the party that terminates the contract will pay 50% of the liquidated damages.

Article 10 Method of settlement

_______________________________________。

Article 11 Others

If there are any differences in matters not covered in this contract and the interpretation of this contract, Party A and Party B shall settle them through negotiation in good faith. This contract is signed in the form of _ _ _ _ _ _ _ _ _ _

Party A (seal): _ _ _ _ Party B (seal): _ _ _ _ _ _

Representative (signature): _ _ _ _ Representative (signature): _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Signing place: _ _ _ _ _ _ _ _ _ _ Signing place: _ _ _ _ _ _ _ _ _