The first round of research on the planning of the rail transit network in Changchun began with 1995, when the basic framework of the first ring and third line rail transit network in Changchun was determined. In August 2002, Changchun Urban Planning and Design Institute, Beijing Urban Planning and Design Institute and Beijing Zhong Chengjie Consulting Co., Ltd. completed the "Changchun Rapid Rail Transit Network Planning", which was reviewed by experts of China International Engineering Consulting Co., Ltd. and approved by the municipal government and incorporated into the newly revised Changchun urban master plan and comprehensive transportation plan. In the future, the urban rapid rail transit network planning in Changchun will consist of three light rails, seven subways, 1 express rails and eight trams, of which eight lines will be subway lines (rail transit 1, 2, 5, 6, 7, 8, 9, 10) and two semi-circular lines will be light rail lines (rail transit) The total length of the network is 527.24km, and the density of the network in the central city reaches 0.6 1km/km2. The network density of core cities is 1.58km/km2.
It is estimated that in the prospective year (at the earliest in 2030), Changchun will complete a radial line network consisting of 19 lines, including 8 radial lines and 2 semi-circular lines, which is consistent with the urban morphological structure and development direction. The operating mileage has reached 527.24 kilometers, forming a comprehensive transportation system with public transportation as the main body and rail transit as the backbone. The latest network planning takes the urban area of 600 square kilometers in Yuan Jingnian (the fastest in 2030) as the research scope. Yuanjing line network in downtown Changchun is a radial line network consisting of two light rails, eight subways, one express rail and eight trams *** 19 lines, among which rail transit 1, 2, 5 and 9 lines are three-pronged radial backbone lines.
The first stage is from 2003 to 20 14: 54 trams and 55 trams, and the rail transit lines 3 and 4 have been completed, with a total length of 60.28 kilometers.
The second stage is from 20 15 to 20 19: two subway lines (rail transit 1 line) and the east-west line (rail transit line 2) and the Beihu express, extending rail transit line 3 to the Puppet Palace, and rebuilding two trams, 54 and 55, with a construction mileage of 74 kilometers to 2,065,433.
The third stage is from 2020 to the prospective year (around 2030 at the earliest): the second and third phases of northeast-southwest oblique lines (rail transit lines 5, 6 and 7), lines 8 and 9, and 10 will be built, and trams will be built. According to the network planning, the traffic mileage will reach 527.24 kilometers, thus realizing the network planning. Status of this line: the first phase of the project has been explored, and the whole line started in August 20 12, and put into trial operation on April 3017.
Line length: the total length is 40.65km, with 28 stations in * * *, and the main urban area is 26.3km.
Model: Type B cold train set produced by Changchun Railway Passenger Car Co., Ltd.
Overview of the line: This line is a subway, which is the backbone line in the north-south direction. It runs through Kuancheng District, Chaoyang District and Nanguan District, and passes through Changchun Railway Station North and South Square, People's Square, Northeast Normal University, Changchun Mingzhu Residential Area, Central Business District (CBD) and other large passenger distribution points. It is the backbone of the road network with a large traffic volume. The train plan consists of six cars.
Main sites: Lanjia-Cai Jia-Tangjiayingzi-North Ring Road-Qingfeng Road-Yi Kuang Street-Changchun Station North-Changchun Station-Beijing Street-People's Square-Jiefang Road-Freedom Road-Nanhu Road-Fanhua Road-Satellite Square-South Ring Road-Central Business District-Hongzuizi.
Note: In italics, Yihe Village north to Yongchun South is the first phase of the south extension project, with a line length of 8 kilometers and 6 stations, with an investment of 5.52 billion yuan. The planned construction period is 2015 ~ 2019; The rest is the second phase of the project.
By the end of August 20 14, the accumulated investment was 8.879 billion yuan, accounting for 55% of the total investment, and the construction of the whole line 14 section has been fully started. Among the 0/5 stations in Phase I/KLOC-0, the main civil works of 6 stations, including North Ring Road, Qingfeng, Yi Kuang Street, Fanrong Road, South Ring Road and Satellite Plaza, have been basically completed, and the remaining 9 stations have been completed.
20 1 5165438+1On October 29th, Changchun Metro1line has three sections, and six sections are run through by two lines, namely: North Ring Road Station-Qingfeng Road Station, Qingfeng Road Station-Yi Kuang Street Station, Yi Kuang Street Station-Changchun North Station and Renmin Station. On September 30th, 20 16, the whole line was opened to traffic. The rail transit 1 line can be put into operation after it has passed the acceptance and evaluation by the transportation authorities. It is expected that citizens will take the 1 line in the first half of 20 17. Status of the line: Construction has started, and the target task in 20 14 years is to complete the investment of 65,438.05 billion yuan. Among them, the construction of West Railway Station has been completed, and the construction of Jiefang Road Station is completed by bid 07 of 1 Line. 20 18 12 officially opened for trial operation.
Model: Type B cold train set produced by Changchun Railway Passenger Car Co., Ltd.
Line length: the total length is 38.85 kilometers, with 28 stations in * * *, and the main urban area is 23.58 kilometers.
Line overview: This line is a subway. It is the backbone line in the east-west direction. It runs through Lvyuan District, Chaoyang District, Erdao District and Economic Development Zone. It mainly passes through the West Railway Station, Cultural Square, Yatai Garden Residential Area, Changchun Economic and Technological Development Zone, Applied Writing Magazine and other major passenger distribution points, and is a large-capacity backbone line in the network. The train plan consists of six cars.
Main sites: Automobile Park-Jetta Road-West Lake-Yuanjiadian-Changchun West Station-Xixing-Xihuan Road-Heping Street-Cheng Chun Street-Jingyang Square-jiefang bridge-Jianshe Square-Cultural Square-Jiefang Road-Pingyang Street-Nanguan-Jilin Road-Dongsheng Street-Donghuan Road-Century Street-Oriental Square-Taiyanggou-Jiasan Road-Fogai.
Note: The italicized part is the second-phase planning, and the car park to West Lake is the first-phase westward extension project, with a line length of 5.3km and three stations, with an investment of 3.35 billion yuan; The East Plaza-East Hub is an eastward extension project, with a line length of 2km, a station 1 seat, an investment of10.79 billion yuan, and a planned construction period of 20 15 ~ 2005. The rest is the second phase of the project.
The first phase line is laid along Jiefang Road and Jilin Road, and 19 station is set between Xihu Station and Dongfang Square Station, all of which are underground stations. The total length is 22.80 kilometers and the total investment is 654.38+05.4 billion yuan. Construction started on April 20 12. By the end of August, 20170.5 billion yuan had been completed, accounting for 1 1% of the total investment. Seven of the eight sections of the whole line have started construction, and the rest 1 section (Dongsheng Street to Century Street) is under construction preparation.
In 20 14 years, the investment for the completion of the target tasks is1500 million yuan, and cut and cover construction is mostly adopted, and the segmented shield construction is mostly adopted. Yuanjiadian Station of Line 2 is the first prefabricated subway test station in China. Metro Line 2 will use prefabricated technology to build four stations, namely West Lake Station, Xixing Station, West Ring Road Station and Jianshe Street Station. The main works of two stations (Changchun West Railway Station and jiefang bridge Railway Station) have been completed. Jilin Dalu Station is a special interchange station, which will be interchanged with Light Rail Line 4. It will be the only transfer station on Metro Line 2 that directly connects the viaduct without leaving the station underground, so its design will become the most dazzling "bright spot" of Rail Transit Line 2. It is planned to officially open the trial operation on 20 18 and 12. Status of the line: The line has been put into use-Changchun Station-Chang Ying Century City 3 1.9 km, that is, light rail 1, Phase II project. Model: CCQG2000 series and CCQG3000 series of Changchun railway passenger cars.
Line length: the total length is 35.88 kilometers, with 35 stations and 24.70 kilometers in the main city ... Line overview: this line is a light rail. The line is located at the core edge of the city, surrounding the north, west and south, showing a U-shaped line and extending to Jingyue Group. It mainly passes through Changchun Railway Station, Meng Jia Square, Jingyu Square, Changchun Pearl, Convention and Exhibition Center, Northeast Normal University, Jingyue Park, Ski Resort and Chang Ying Century City. , which is a medium traffic auxiliary line in the network. There are two types of trains: 3 and 6. Main sites: Pseudo Palace-East Square-Changchun Station South-Liaoning Road-Furong Bridge -Xi 'an Bridge-Nanchang Road-Chaoyang Bridge-jiefang bridge-Huxi Bridge-Kuanping Bridge-Fusong Road-Nanhu Road-Huguang Road-Silicon Valley Street-Qianjin Station-Qianjin Street-Weiming Street-Weiguang Street-Satellite Square-Yatai Street-Yitong River-He Lin.
Running time: The early bus leaves at 6:00 and arrives at Changchun Station-Chang Ying Century City-Changchun Station at 6:00.
Evening bus: Dajiao Road Changchun Station-Chang Ying Century City 2 1: 00 Chang Ying Century City-Changchun Station 2 1:00 Jiao Xiao Road Century Square-Changchun Station 2 1:00 Changchun Station-Century Square 2 1:00 Time interval: usually, the average interval is 4 minutes.
Depot: Huguang Road Depot
Parking lot: Jingyue parking lot.
Remarks: Usually, the average interval between buses is 4 minutes, and turn back after Century Square. Pay attention to the direction sign of the vehicle when taking the bus. There is no bus until after 9 o'clock.
Note: The italicized parts are engineering extension projects. Status of the line: the line has been put into use 16.33km, which is the third phase of the light rail project.
Vehicle types: CCQG2000 series, CCQG3000 series and 100% low-floor trams for Changchun railway passenger cars.
Line length: the total length is 45. 19 km, with 33 stations in * *, and the main urban area is 28.96 km.
Line overview: This line is a light rail. The line is located in the northern and eastern areas of the urban core area, extending in an L-shape to the west and south. It mainly passes through Hexin Formation in Kuancheng District, Nongke Formation, Changchun Station North, Puppet Manchu Palace in Nanguan District, Jilin Road in Erdao District, Customs and He Lin Street. , which is the auxiliary line of medium traffic level in the network. The third phase of the light rail project will invest 23 vehicles, each with 6 modules, and the specific operation interval depends on the passenger flow. The new car (a new light rail bus produced by CNR Changchun Rail Bus Co., Ltd., which has reached the leading level in China) consists of six modules, equivalent to six carriages, with a total length of nearly 60 meters. * * * With more than 130 seats, the full load capacity exceeds 500 people.
Main operating sites: Hexintuan-Academy of Agricultural Sciences-West Third Ring Road-Keelung Road-Qingnian Road-Qingshi Road-Changchun Station North-North Yatai Street-Pseudo Palace-East Bridge-Dongxin Road (not yet opened)-Jilin Road-Fair Road-Free Road-Pudong Road-Southeast Lake Road-Beihai Road-Satellite Road-Rong Shi Road-South Third Ring Road-South Fourth Ring Road.
Running time: early bus Changchun Station North -6:00 parking lot -6:00 Changchun Station North.
Evening bus Changchun station north-parking lot 2 1:00- Changchun station north 2 1:00.
Interval: The average interval is 5 minutes.
Note: The italicized parts are engineering extension projects. Status of this production line: production line plan.
Line length: the total length is 4 1.32km, * * * there are 25 stations, and the main urban area is 32.94km.
Overview: This line is a subway, which is the backbone line from southwest to northeast. It runs through High-tech Zone, Chaoyang District, Nanguan District, Erdao District and Kuancheng District. It mainly passes through passenger distribution points such as Fufeng Group, Hi-Tech Group, Nanhu Park, Northeast Normal University, Stadium, Handsome Group and Xinglong Group, and is the backbone of the road network with large traffic flow.
Main operating sites: Fufengtuan-Chaoyang Industrial Zone-Bayi Reservoir-Jingyu Square-Qianjin Square-Fanrong Road-Nanhu Square-Huxi Road-Xinmin Square-Cultural Square-People's Square-Chongqing Road-Changchun Street-Dongqiao-Changchun East Station-Dongrong Road-Yuandajie-Tongkang Road-Changxin Road (Balipu)-Qinjia-Shuai-Xinglong Bonded Zone.
Line length: the total length is 29.42km, * * with 18 station and 19.75km in the main city.
Line overview: This line is a subway. In order to cooperate with the development of the western urban area, Changchun is planning rail transit line 6, which runs northwest-southeast and is an auxiliary line in the south. The line is connected in series with West New Town, South New Town and Jingyue Group. The line starts from Xiaokaiyuanbao in Changchun West, runs along Feiyue North Road, Feiyue Road, Cao Fang Street, Planning Road, Cai Yu Street and Planning Road, and ends at Changying Century City.
Main stations: West Lake-Changchun West Station-West Fourth Ring Road-Daishan Park-Feiyue Square-Silicon Valley Square-Jida South District -CBD West -CBD East-Darkmouth Zi-Nanxi-Golden World-Fuxi Road-Wujiadian-Xincheng Street-Juye Street-Provincial Museum-Chang Ying Century City Line Status: Line planning.
Line length: the total length is 43.64 kilometers, with 27 stations in * * *, and the main urban area is 34.64 kilometers.
General situation of the line: This line is a subway and an auxiliary line from southwest to northeast. The line is connected in series with Fufeng Group, the main city, Yingjun Group and Changnortheast Open Development Experimental Zone. The line starts from Bailongju of Fufeng Group in the west, runs along Planning Road, Dongfeng Street, Nanhu Road, Donghuancheng Road, Changji North Line, Planning Road and Zhongke Street, and ends in Taiping Village.
Main operating sites: Bailongju-Dazhou Square-Chaoyue Street-Changchun FAW-Feiyue Square-Kaiyun Street-Changchun South Station-Dongfeng Street-Nanhu Square-Nanhu Road-Hongcheng Garden-Zoo-Sports Center-Liberty Road (Customs)-Middle East-Lequn Street-Fourth Road-East Third Ring Road-Shuai-Xinkai Street-Changdongbei Industrial Park-Xinghuayuan
Line length: the total length is 50.65km, and there are 32 stations in total.
Overview of the route: This line is a light rail, starting from Lanjia in the northwest of the city, passing through Keelung North Street, Zhengyang Street and Huxi Road, passing through Nanhu Park, passing through Nanhu Middle Street to reach the southern new city, and finally reaching Changping Cooperation Zone.
Main operating stations: Lanjia-Zhengyang Street-Nanhu Park-Southern New Town-Changping Cooperation Zone. Production line status: The production line is being planned.
Line length: the total length is 39.37 kilometers, and there are 32 stations in * * *.
Overview: This line is a subway, starting from Hao Yue Park, passing through Dafangshen Airport, Xi 'an Road, People's Square, Kang Min Road, Dongling Street, Nanhu Road, Donghuan Road and Xincheng Street, and finally reaching the area south of Fuzhi Road.
Main operation sites: Hao Yue Park-Dafangshen Airport-People's Square-Nanhu Road-East Ring Road-Xincheng Street-Fuzhi Road South Line Status: The line is under planning.
Line length: the total length is 47.4 1 km, * * with 2 stations1seat.
Overview: This line is a subway, starting from Misha, a new town in the northeast of Changchun, passing through Changde Cooperation Zone, Changchun Jiutai Economic Development Zone, Economic Development Zone, Changchun Xinglong Comprehensive Bonded Zone and Changxin Street, and finally connecting with Rail Transit Line 4 and metro line 8 West Extension Line near West Expressway.
Main operating sites: Misha-Changde Cooperation Zone-Jiutai Economic Development Zone-Economic Development Zone-Economic Development Zone-Xinglong Comprehensive Bonded Zone-West Expressway. Status: April 28th, 2004, 20 18: 09. Under the Beihu Bridge, the launching ceremony of the Beihu fast track test section was officially held. In 20 17, it is expected that Changchun rail transit 1 line and Beihu rapid rail transit will be opened to traffic at the same time.
Line length: the total length is 27.6km, and there are 22 stations in total, and the whole line is elevated.
Route overview: The Beihu route starts from the intersection of Planning Road on the south side of the North Ring Road and the North Extension Line of Renmin Street, mainly heading northeast, and ends near Taiping Village outside the Ring Expressway. The line is mainly laid along the passenger corridors such as Planning Road, Yatai North Street, Longhu Road, Yuanda Street, Geographical Road and Zhongke Street on the south side of the North Ring Road, breaking through the traffic bottlenecks such as the railway around the city, wetland park and expressway, and providing a passage for Changdongbei High-tech Zone to quickly enter the central city. The total length of the line is 26.7 kilometers, and there are 22 stations with an average distance of 1. 1 km, among which there are 4 transfer stations, that is, take the subway 1 line at the starting point of Beihuan Road Station, transfer to Line 5 at Sanjianfang Station and Incubation Park Station, and transfer to Line 7 at Taiping Village Station. A 1 depot is set at the end of the ring road outside expressway and east of Zhongke Street, covering an area of about 17 hectares. The North Lake Express Rail Project will be completed and opened to traffic in 20 17 together with the subway 1 line.
The Beihu line project of Changchun rapid rail transit is a hub line connecting the long northeast open development experimental area and the old city of Changchun. This will be the fastest and earliest expressway for the whole Changdongbei New District (including Gaoxin New District and Changjiang Road Economic Development Zone) to be integrated into the city center.
Main operating sites: North Ring Road-123 Middle School-Xiaonan Village-Xiaochengzi Street-Houshuiquan-Beihu Park-Sanjianfang-Longxiang-Incubation Park-Changchun University of Technology-Changchun Normal University-Jilin Jiaotong University-Taiping Village.
Vehicle base: Taiping Village Vehicle Depot
Vehicles used: Changchun Light Rail Line 100% low-floor EMU Status: The line has been put into use.
Model: SYYG600-2 Modern Tram.
Line length: the total length is 7.6 kilometers, with * * stations 16.
Overview of the line: The line is a tram, running between the old CBD of Xi 'an Road and the business circle of Hongqi Street.
Main operation sites: Xi 'an Road-Nongfeng Market-Lvyuan-Hao Yue Street-Jingyang Road-Tram Company-nanyang road-Chuangye Street-Dongfeng Street-Yingchun Road-Kuanping Bridge (interchange with Tram 55 and Rail Transit Line 3)-Kuanping Road-Changjiu Road-Huxi Road-Chang Ying Studio-Gongnong Road.
Running time: the first bus on Gongnong Road is at 5: 30, and the last bus is at 20: 05; Xi 'an Road leaves at 5: 45, and the last bus 19: 30. And all-night trains.
Interval between trains: 5 minutes on flat peak and 4 minutes on peak.
Ticket price: 1 yuan.
Operator: Changchun Bus Group Line Status: The line has been put into use.
Model: SYYG600-2 Modern Tram.
Line length: the total length is 9.62km, with stations 18.
Overview: The line is a tram, which runs between Changchun West Station and Hongqi Street business circle of Harbin-Dalian high-speed railway.
Main stations: Changchun West Railway Station-Dingsanshan Road-Yisanshan Road-West Third Ring Road -C Sanshan Road-West Ring Road-Luoyang Street-Heping Street-nanyang road-Chuangye Street-Dongfeng Street-Yingchun Road-Kuanping Bridge (interchange with tram line 54 and rail transit line 3)-Kuanping Road-Changjiu Road-Huxi Road-Chang Ying Studio-Gongnong Road.
Running time: the first bus of Gongnong Road and Changchun West Station leaves at 6 o'clock; The last bus leaves at Changchun West Railway Station 19: 00, Gongnong Road 19: 50, and the whole journey takes 35 minutes.
Interval between trains: 5 minutes on flat peak and 4 minutes on peak.
Ticket price: 1 yuan.
Operator: Changchun Bus Group Line Status: The line is the planned line.
Model: SYYG600-2 Modern Tram.
Line length: the total length is 9.96 kilometers.
Overview of the line: This line is a tram. On the basis of the existing 54-way tram, the northern line extends to Yingbin Square in the west and Nanhu Square in the south, and can be interchanged with the planned rail transit line 5. The line of Hongqi Street can be used as a branch line of rail transit 1.
Ticket price: 1 yuan.
Operator: Changchun Bus Group Line Status: The line is the planned line.
Line length: 8.80km
Overview of the route: The line is a tram, running along the West Third Ring Road, passing through Yingbin Square, Qingzhou Road, Qinglin Road, Keelung Street, Qingnian Road to Kaixuan Road, and rail transit 1 line, realizing the transfer outside the station.
Ticket price: 1 yuan.
Operator: Changchun Bus Group Line Status: The line is the planned line.
Line length: total length 12.90km.
Overview: This line is a tram, running along Keelung Street, Zhengyang Street and Chuangye Street, passing through West Third Ring Road, Xinyue Road, Hualien Road, Xi 'an Road, Xijiao Road, Jingyang Road, Auto Trade City, Kuanping Road, Wen Ming Road, Cross-country Road and Feiyue Road to Anqing Road. This line can be interchanged with Rail Transit Line 2 and Line 4.
Ticket price: 1 yuan.
Operator: Changchun Bus Group Line Status: The line is the planned line.
Line length: the total length is 6.50 kilometers.
Overview: This line is a tram, which runs along Xi 'an Road, starts from Dafangshen Airport in the west and ends at Xi 'an Bridge in the east, and can be interchanged with the completed rail transit line 3.
Ticket price: 1 yuan.
Operator: Changchun Bus Group Line Status: The line is the planned line.
Line length: total length 12.00 km.
Overview of the route: The northern end starts from Radio Street, and it can be interchanged with Huguang Road Station of the existing rail transit Line 3. The preliminary planned route takes the intersection of Radio Street and Guanggu Street as the starting point, and takes Guanggu Street, Ulsan Road, Innovation Street and Fan Chao Street as the routes, and goes deep into the High-tech South Zone. Form a smooth and fast traffic network between the central area of the city and the peripheral new area.
Ticket price: 1 yuan.
Operator: Changchun Public Transport Group