Take the general project cost bidding as an example. The basic contents of bidding are tender instructions, contract terms, engineering technical conditions and technical specifications, and bidding documents.
Take the basic contents of bidding quotation for project cost as an example, which includes the following contents:
1, implement the current Comprehensive Quota for Construction Projects in XX Province, Comprehensive Quota for Installation Projects in XX Province, Price List of XXXX Region, charging standards and related documents.
2. The pre-tender estimate of this project is compiled according to XXX charging qualification grade, and the artificial price fluctuation has been submitted in the tender according to document J.J. Zi [2000] 16, and the charging grade and artificial price of the tender are taken as the standards for completion settlement. If the bid winner's expense level is lower than XXX level, it shall be priced and settled according to the actual expense level of the bid winner.
3, materials supplied by the contractor, its quality and price must be approved by the construction unit.
4. The off-site transportation distance of concrete members shall be calculated within 5km.
5, regardless of the price difference of various materials.
6. Labor cost is based on the floating unit price in Article 8.2, but it is not included in the budget quotation. The "budget quotation" is still priced according to the original fixed labor cost, and the bid opening is scored according to the comparison between this quotation and the floating unit price of labor cost. (Pre-tender estimate is also priced according to this regulation)
7. The bidder shall also quote the "contract price", that is, the difference between the artificial floating unit price and the fixed labor cost determined by the bidder shall be added to the quotation calculated in the preceding paragraph according to the charging procedure. This "contract price" is not used for comparison and scoring, but can be used as the contract price of the winning bidder after verification.
8. The latest price list for quota implementation.
8.9 Bid currency: RMB.
For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.