Implementation scheme of water conservancy informatization construction

Implementation scheme of water conservancy informatization construction

In order to do a good job in water conservancy informatization, the implementation plan of water conservancy informatization in XX city was formed on the basis of fully soliciting the opinions of all offices of the bureau and XX Water Investment Group. The relevant matters are hereby notified as follows:

I. Construction objectives

On the basis of key information engineering achievements, we will further establish a flood control and drought relief command system and related water conservancy information business system based on water, rain, engineering, drought, disaster and related information collection systems, guaranteed by communication systems and supported by computer network systems. The system requires advanced, practical, efficient and reliable, reaching the domestic advanced level.

Second, the construction task

There are seven main tasks of water conservancy informatization construction, specifically:

(1)XX City Flood Control and Drought Relief Command System Construction Project

. Industrial accident collection system

Construction of an industrial injury disaster information collection station within the scope of Xx city, with relevant industrial injury disaster collection equipment and industrial injury disaster data processing and reporting software.

Intelligent image hydrological acquisition system

Construction of intelligent image analysis system in Xx water conservancy data center and intelligent video monitoring equipment for important news websites.

. Xx county branch meeting project

On the basis of the completion of the main venue project of the video consultation system, it will be extended downwards to build a video sub-venue system in XX county.

Application Software Phase II Project

On the basis of the first-phase software project, the second-phase software project includes flood forecasting system, flash flood disaster forecasting system, flood control consultation support system, meteorological product system, water conservancy project planning, construction and management system, water resources management system, water conservancy project construction management system, soil and water conservation monitoring and management system, local power management system and so on. Will be activated.

(2) Construction of hydrological station network

Construction of production and operation sites, rainfall observation sites, the Middle East and other hydrological stations water level and flow test facilities, equipped with rainfall, evaporation, water level, flow, sediment concentration and communication equipment and instruments.

(3) Dam safety management system

Construction of medium and small (a) type reservoir dam safety management system, maintenance of the dam safety management system and the dam safety management system platform.

(four) water resources fee collection management information system

Using computer network technology, collect water information of each water intake unit in time; Through the research and development of information management system, the automatic monitoring and management of water resource fee collection can be realized; Build a system remote management platform to realize real-time, scientific and efficient management.

(5) XX city flood control and drought relief materials management system

Establish material management database, standardize material storage and allocation process management, and realize information management of flood control and drought relief materials.

(6) River Management Information System

Xx city river shoreline planning management, river-related construction project management, river sand mining management and other information systems.

(7) Archives information database

By developing a software management system, documents, pictures, images and other materials are classified and saved, and an archive information base is generated as needed.

Third, decompose and implement responsibilities.

(1) Construction of XX flood control and drought relief command system and archives information database project: XX water conservancy informatization project office takes the lead in overall responsibility, with the assistance of relevant offices and units such as flood control office, bureau office and XX county.

(2) Construction of hydrological station network: The Municipal Hydrological Bureau is responsible for the whole.

(3) Reservoir dam safety management system: XX Water General Station is fully responsible, with assistance from XX County.

(4) Water resource fee collection management information system: the water resource management station of XX City is in overall charge, assisted by the water resource information center of XX City.

(5) Management system of flood control and drought relief materials in 5)XX city: the Municipal Flood Control Office is fully responsible, with the assistance of the Municipal Flood Control Mobile Rescue Team.

(6) River Management Information System: The River Management Office is responsible for the whole, with the assistance of the Municipal Water Resources Information Center.

Four. Related requirements

The construction of water conservancy informatization in XX city must follow the "three unifications" principle of "unified planning, unified construction and unified management" established by the bureau party group, and do the following work specifically:

(A) attach great importance to and strengthen leadership

Jinshui project, as a new task of water conservancy work in the new period, is listed as one of the top ten tasks of water conservancy in the Eleventh Five-Year Plan by the Ministry of Water Resources. In the Memorandum of Cooperation on Building and Coordinating Urban and Rural Comprehensive Reform Experimental Zone signed with XX Municipal Government, XX City was listed as the pilot area of water conservancy informatization in the western region by the Ministry of Water Resources, and water conservancy informatization became the key work of water conservancy work in the future. Therefore, the bureau party group regarded it as "Wang Yubei" and attached great importance to the water conservancy bureau (water conservancy and agricultural machinery) in XX County (hereinafter referred to as XX County), all its offices, all its subordinate units and the municipal water investment group, and clearly took charge of the leadership of informatization, and set up special institutions. ,

Implementation scheme of water conservancy informatization construction

(two) a clear task, the implementation of funds.

Xx County (XX County) Water Conservancy (Water Affairs, Agricultural Machinery) Bureau, its offices, bureaus' subordinate units and municipal water investment group should implement the project construction and management funds one by one according to the established construction tasks, the actual situation, and the principle of "who is responsible, who builds, who raises funds and who maintains" (see Annex). For the information engineering projects that have not been approved, the Municipal Water Conservancy Bureau will follow the principle of "Who is responsible, who builds, who raises funds and who maintains" At the same time, the connection of water conservancy information center in XX city, the principle of "three unifications" in water conservancy information planning and informatization in XX city, and the technical standards of each subproject are consistent with the municipal platform in XX city to ensure the enjoyment of resources. Information project (including hydrological information) ×× Municipal Water Conservancy Information Center for the record.

(3) Effectively strengthen the operation and maintenance of information projects.

Our bureau has successively completed the computer backbone network and communication system engineering of the municipal flood control and drought relief command system, the first phase of software engineering, the construction and civil engineering of water regime collection subsystem, and the Chongqing Drought Relief Sub-center of the first phase of the national flood control and drought relief command system. Projects such as "Application Service Platform Project of City Flood Control and Drought Relief Command System", "Main Conference Center Project of Video Consultation System" and "Emergency System for Industrial Disasters" have been started one after another. The application level of water conservancy information system in XX city is related to the success or failure of the construction of "Jinshui Project" in Chongqing. Please attach great importance to the management and protection units, clarify the special information operation and maintenance funds, and make every effort to ensure that the project plays its due role. ,