Chongqing Tiefa Suiyu expressway Co., Ltd., jointly funded by China Railway Construction Corporation and Chongqing expressway Group Co., Ltd., is responsible for the construction, operation and management. The total investment of the project is about 4.75 billion yuan, the planned construction period is four years, and it was actually completed one year ahead of schedule. The total length of Suiyu expressway is 147.965 km. After the opening of Chongqing-Suiyuan Expressway, it will be connected with Chengnan Expressway, becoming the shortest expressway from Chengdu to Chongqing (to be replaced by Chengdu-Chongqing Expressway), with a total length of about 295 kilometers, 50 kilometers shorter than the current Chengdu-Chongqing Expressway. It is estimated that the maximum speed limit will reach 120 km/h by then.
Suiyu expressway
At 9: 00 am on February 29th, 2007, Chongqing to Suining expressway, an important part of the National expressway Network from Ningbo to Zhangmu expressway, was officially opened to traffic. Chongqing Tiefa Suiyu expressway Co., Ltd., jointly funded by China Railway Construction Co., Ltd. and Chongqing expressway Development Co., Ltd., is responsible for the construction, operation and management. The total investment of the project is about 4.75 billion yuan, the planned construction period is four years, and it was actually completed one year ahead of schedule.
The total length of Suiyu expressway is 147.965 km, of which the Sichuan section is 36.64 km, starting from Luojiawan of Suihui Expressway and connecting with Shuanglong Temple via Gu Bei, Xining, Nanqiang and other towns. The design standard is two-way four-lane, fully enclosed and full interchange with a total investment of 964 million yuan. Chongqing section starts from Gaotanyan in Shapingba, Chongqing, connects with the inner ring section of Chongqing-Changchun Expressway, passes through Xiyong, Qingmuguan, Bishan, Tongliang and Tongnan, connects with Dingjiagou at the junction of Sichuan and Chongqing, and finally connects with Suining Chengnan Expressway, with a total length of11.8km..
After opening to traffic, Suiyu Expressway will be connected with Chengnan Expressway, becoming the shortest expressway from Chengdu to Chongqing, with a total length of about 295 kilometers, 50 kilometers shorter than the current Chengdu-Chongqing Expressway. It is estimated that the maximum speed limit will reach 1.20km/h by then.
Forestry will be developed on both sides of Chongqing section of expressway in Chongqing, which will become the first "forest expressway" in Chongqing. To develop forestry industry along the highway is to combine ecology with industry, develop forestry industry with landscape utilization and economic benefits, so that people along the highway can enjoy the benefits brought by convenient transportation and forestry industry development, and realize the "three wins" of ecological benefits, economic benefits and social benefits. The pilot project was carried out in Chongqing section of expressway, Chongqing.
Chongqing: covering an area of 82,400 square kilometers, it has jurisdiction over 40 administrative districts (autonomous counties) and 19 districts (Wanzhou District, Fuling District, Yuzhong District, dadukou district, Jiangbei District, Shapingba District, Jiulongpo District, Nan 'an District, Beibei District, Wansheng District, Shuangqiao District, Yubei District, Banan District, Qianjiang District, Changshou District, etc. 2 1 county (autonomous county) (Qijiang, Tongnan, Tongliang, Dazu, Rongchang, Bishan, liangping county, Chengkou, Fengdu, Dianjiang, Wulong, Zhongxian, Kaixian, Yunyang, fengjie county, Wuxi, Shizhu Tujia Autonomous County, Xiushan. All districts and counties (autonomous counties) are shaped like stars and arches the moon, forming a group-like and networked modern urban agglomeration that organically combines large, medium and small cities. It is a megacity with the largest administrative area, the largest population and the largest number of administrative units in China.
Suining: Located in the middle of Sichuan Basin, the middle reaches of Fujiang River, bordering Chongqing, Guang 'an and Nanchong in the east, Chengdu in the west, Neijiang and Ziyang in the south, Deyang and Mianyang in the north, forming an equidistant triangle with Chengdu and Chongqing. Historically, Suining once became the political, economic and cultural center of central Sichuan with its profound cultural heritage, charming spiritual landscape and developed agriculture, industry and commerce, especially famous for its textile and food industries, and was known as "Dongchuan Town", "Central Sichuan Town" and "Little Chengdu". 1Feb. 985, with the approval of the State Council, Suining City was established, which now governs chuanshan district, Anju District, Shehong County, Pengxi County and Daying County. It covers an area of 5,325 square kilometers and has a population of 3.84 million. The urban built-up area is 40 square kilometers with a population of 430,000.
Ningbo-Zhangmu Highway: One of the national key highways with "13 vertical 15 horizontal" planned by the state, with planned 13 vertical, 15 horizontal and * * 28 roads, with a planned total mileage of 7 1 10,000 kilometers, which spans Zhejiang, Jiangxi and Jiangxi provinces.
Thirteen verticals: 1, Jiayin-Nanping 4020km;; 2. Heihe-Tonghua1440 km; 3. Jiagedaqi-Jinzhou1570 km; 4. Tianjin-Shanwei1570 km; 5. Dongying-Hong Kong 2720km6. Arong Banner-4460km away from Shenzhen; 7. Taiyuan-Macau 2327 kilometers; 8. Linfen-Sanya 3281km; 9. Baotou-Youyiguan 2920km 10, Lanzhou-Mohan 2730km;; 1 1, Zhangye-Rhoda 4120km; 12, Altay-Ruoqiang1580 km; 13, Altai-Las 3990 km.
Fifteen horizontal lines: 1, Changbai Mountain-Aershan1140km; 2. Ji 'an-Xilinhot1790 km; 3. 6040 kilometers from Dandong to Jillger Stan; 4. Weihai-Wuhai 2400 kilometers; 5. Qingdao-Hongqi Rafe 6080 km; 6. Rizhao-Nanyang 810 km; 7. Shanghai-Luoyang1230 km; 8. 2750km9 from Shanghai to Wuwei 9. 3460km from Hangzhou to Lanzhou; 10, Chengdu-Naqu 2020km 1 1, Ningbo-Zhangmu 6020km;; 12, Quanzhou-Bijie 2430 km; 13, Xiamen-Kunming 2400 km; 14。 Shantou-Kunming1870 km; 15, Shanwei-Qingshuihe 2460 km
China Railway Construction (hereinafter referred to as China Railway Construction) was formerly the Chinese People's Liberation Army Railway Corps, which was established in July 1948. 1984 65438+ 10, according to the decision of the CPC Central Committee, the State Council and the Central Military Commission, the whole system was collectively transformed and merged into the Ministry of Railways. In September 2000, with the approval of the State Council, China Railway Construction was decoupled from the Ministry of Railways and handed over to the Central Enterprise Working Committee for management; At present, it is a large-scale comprehensive construction enterprise group managed by the State-owned Assets Supervision and Administration Commission of the State Council, with special engineering general contracting qualification and overseas management right. It has jurisdiction over 27 holding (wholly-owned) enterprises and institutions, including China Railway 11th Bureau and 25th Bureau Group Co., Ltd., China Civil Engineering Group Co., Ltd., China Railway Construction Group Co., Ltd., Railway First Survey and Design Institute, Railway Architecture Research and Design Institute and Shanghai Railway Urban Rail Transit Design and Research Institute. There are more than 220,000 employees. At present, there are more than 69,800 professional technicians, including 502 senior engineers1person and 4,336 technicians and senior technicians. The construction teams are all over the provinces, municipalities, autonomous regions and Hong Kong and Macao except Taiwan Province Province, and undertake engineering projects in more than 30 countries and regions abroad.
Chongqing expressway Development Co., Ltd. is a highway construction investment and financing enterprise established by Chongqing Municipal Government, and a specialized company established for the construction of expressway in Chongqing. The company is a large state-owned enterprise in Chongqing with a registered capital of 2 billion yuan. The company's main task is to be responsible for the construction, operation, maintenance and financing of expressway under the guidance of the national and Chongqing traffic development planning. According to the modern enterprise level, the company has established and improved a perfect corporate governance structure and implemented the general manager responsibility system under the leadership of the board of directors. Founded in 1994, it was then Chongqing expressway Development Corporation, and was reorganized into Chongqing expressway Development Co., Ltd. in 1998. In order to change the situation that there are too many management units, overlapping institutions and fragmented management in expressway, in June 2000, the Chongqing Municipal Transportation Commission made a decision to improve the system of high-risk departments and hand over the construction and operation of expressway in the city to the high-risk departments for unified management. From June, 5438 to October, 2003 10, Gaofa Company separated the construction and management of its wholly-owned subsidiaries, and set up professional construction and operation companies according to the time sequence and took on the heavy responsibility of the construction and management of the 2000-kilometer expressway. The corporate status of secondary companies was cancelled to strengthen the asset and financial management of high-risk companies. Except that the joint venture company is a subsidiary with the qualification of second-class legal person, all other companies are changed into branches.
Chongqing Tiefa Suiyu expressway Co., Ltd.: Chongqing Tiefa Suiyu expressway Co., Ltd. was established with the approval of Chongqing Municipal People's Government, with 80% and 20% contributions from China Railway Construction Corporation and Chongqing expressway Development Co., Ltd. respectively, and is responsible for the construction, operation and management of Chongqing-Sichuan Suining expressway (expressway, Sui Yu) and its ancillary facilities. The construction and operation period of Sui Yu expressway Project is 30 years, which is the investment of Chongqing Municipal Government in Chongqing. The company was incorporated in Chongqing on September 9, 2004 with a registered capital of 200 million yuan.
The above is the introduction of Suiyu Expressway by CBI Zhong Da Consulting. For more information about expressways, please pay attention to the architectural knowledge column of Zhong Da Consulting.