(Unit: 10,000 yuan) Investment estimate (100 million yuan) 0.3-22-10/50-100100 The environmental impact report (including outline) of consulting services above 0.3-22-/kloc-0. 438+01010 Preparation of Environmental Impact Report Form1-22-44-77The above-mentioned environmental impact assessment report (including outline) 0.8-1.5-33-77-99-. Table 0.5-0.8 0.8-1 .51.5-22 The figure above indicates:1,and the lower limit of the figure in the table contains exclusivity and the upper limit contains inclusiveness;
2. Estimated investment refers to the estimated investment in the project proposal or feasibility study report;
3. The consulting service fee is calculated by interpolation method in the corresponding interval according to the estimated investment;
4. Based on the charging standard in this table, according to the characteristics of the construction project industry and the regional environmental sensitivity, multiply the adjustment coefficient to determine the benchmark price of consulting services (see table 1 and table 2 for the adjustment coefficient);
5. The cost of the environmental impact assessment report (including the outline) does not include the travel expenses of experts attending the review meeting, and the technical assessment fee of the environmental impact assessment outline accounts for 40% of the assessment fee of the environmental impact report;
6. The charging standards for the preparation of the environmental impact report listed in this table are: there is no benchmark price for the evaluation topic, and 50% will be charged for each additional topic;
7. The expenses in this table do not include remote sensing, telemetry, wind tunnel test, pollution meteorological observation, tracer test, ground exploration, geophysical exploration, satellite image interpretation and special monitoring expenses requiring the use of ships and aircraft.
Adjustment coefficient of charging standard for environmental impact consultation of construction projects
Table 1 Environmental Impact Assessment Outline and Report Compilation Fee Industry Adjustment Factor Chemical Industry, Metallurgy, Nonferrous Metals, Gold, Coal, Mining, Textile, Chemical Fiber, Light Industry, Medicine, Region 1.2 Petrochemical, Oil and Gas, Water Conservancy, Hydropower, Tourism 1. 1 Forestry, Medicine Tobacco, Weapons 1.0 Posts and Telecommunications, Radio and Television, Aviation, Machinery, Ships, Aerospace, Electronics, Exploration, Social Services, Thermal Power 0.8 Grain, Construction, Information Industry, Warehousing 0.6 Table 2 Outline of Environmental Impact Assessment, Report Preparation Fee Environmental Sensitivity Adjustment Coefficient Sensitivity 1.2 General 0.8 Daily calculation of employees of consulting service providers.
(Unit: Yuan) Senior Consultant 1000- 1200 Senior Professional Technician 800- 1000 General Professional Technician 600-800.