Steel structure workshop mainly means that the main load-bearing components are made of steel. Then, in the quotation case of building a standard steel structure factory building, the basic price elements include:
According to the square meter, for example, there are 300-400 yuan/square meter, 700-800 yuan/square meter and even 1 1,000 square meter. Steel structure workshop 400-600/ m2 (excluding crane beam) and 600-800/ m2 (including crane beam). The scale and use requirements of the project are different. According to the tonnage, there are more than 6000 tons, 8000- 14000 tons, and even more than 20000 tons (special-shaped steel structure). (Hint: The final steel structure cost needs to be differentiated according to the local steel market. )
Quotation factors of standard steel structure workshop:
1. Project area
For localized enterprises, enterprises from other provinces need to consider the differences in material market, processing cost, construction specifications and standards in the construction area and make comprehensive quotations.
2. Types of steel structures (such as steel workshops, steel garages, office buildings or mezzanines, stairs, billboards, outdoor elevator shafts, steel canopy carports, etc.). ).
3. The scale of the project.
4. Location and height of the building.
5. Material selection.
For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.