Installation of new energy vehicle charging pile

For friends, the new energy vehicle charging pile is still a relatively unfamiliar product, and it is even more confusing to install. Driven by various policy forces, the sales of new energy vehicles are naturally rising. Such a hot market has also spawned a number of new forces to build cars, which have the potential to compete in the Central Plains. At present, China's new energy policy subsidies focus on pure electric vehicles and plug-in hybrid vehicles. These two types of vehicles basically need an external power supply to charge well, so the charging terminal is inconvenient and not fast, which has become a very important link in the experience of new energy vehicles. Let's take a look at the installation guide and cost of charging piles for new energy vehicles with our car lover Xiao Bian.

Installation Guide and Installation Conditions of Charging Piles for New Energy Vehicles

Step 1: Contact the property company to determine the charging pile installation policy. At present, most of the charging piles are parking spaces, which need to have their own property rights. In addition, some properties are not suitable for installing charging piles because they were built earlier. If the installation of charging piles requires additional technical equipment, it is necessary to communicate with the property in advance.

Step 2: Check your parking space. This kind of inspection refers to the owner's own on-the-spot inspection, which is very important for saving costs. Most communities basically have many power distribution rooms. The key is to choose the nearest parking space, which can save a lot of money when installing.

Step 3: Provide relevant materials. Provide the staff with a copy of ID card, a description of parking space property rights (which can be issued by the property) and a description of the property's consent to installation. At present, Beijing Electric Power Company only accepts applications from charging pile companies, and car owners themselves cannot apply.

Step 4: Field trip. Engineers of the power company will inform the charging pile company for a period of time. At that time, property electricians, charging pile companies, power companies and owners basically needed to determine the final construction plan on site.

Step 5: Install. After the construction scheme is determined, it is time for installation and construction. According to the different situation of each community and the location of the garage, the construction time may be different. Some only need 2 hours to complete the construction, and some may need a whole day to complete the construction.

Step 6: Accept. After the completion of the construction, the charging pile company declared to the power company, and the power company went to the site for acceptance. After acceptance, the electric meter will be sealed, and then the power company will make corresponding electric cards, which will be collected by the charging pile company and handed over to the owner, or the owner can collect them by himself.

Installation Guide and Instructions for Charging Piles of New Energy Vehicles

Before installing the charging pile, the first thing we have to do is to investigate whether we have the installation conditions, such as whether there is a fixed parking space, how far it is from the national grid line and so on.

1. Go to the residential property to find out the situation. Because it is possible that residential properties have installed charging piles for owners and merchants before this, it is a familiar experience. But when they know about the property, they will also know something about the installation, such as the installation plan, electricity consumption, installation area and so on. I don't think you need to worry because you don't understand, because subsequent manufacturers will send relevant personnel to answer these professional questions.

2. Go to the 4S shop to apply for the survey and installation site and select the charging pile type. After knowing it, you can register for the household survey in the 4S shop, but then there will be corresponding personnel and friends to make an appointment for the survey time. When the staff come to investigate, it is best to call the property to discuss the installation problem together, because this will not only have professionals to answer the doubts of the property, but also improve the installation efficiency. As for the types of charging piles, there are generally wall-mounted charging piles and vertical charging piles for household use. The advantage of wall hanging is that it saves vacant rooms and has a low price, but it must be installed on a wall that can be wired. The price of the vertical type is high, which will take up a lot of vacant rooms, but it can be installed in the parking lot around the open space.

3. Understand what kind of power source the community is. After consulting the construction site, you should solve the power supply problem. I think what we often encounter in charging pile power supply is the electricity consumption of ordinary residents. We need to apply to the State Grid for power box wiring. If the approval is qualified, the State Grid will send corresponding staff to the door for wiring. I think the whole process is similar to installing optical fiber broadband. In addition, if commercial high-voltage self-managed electricity is used in residential areas, it can be said that there are advantages and disadvantages. One of the disadvantages is that the electricity price is much higher than that of civil electricity. The advantage is that you can avoid the tedious process of dealing with the state grid, and you can solve the problem by consulting the property directly.

4. Start construction after confirming that the installation scheme of charging pile is correct. After a few days' inspection of the installation site, the construction party will give the corresponding installation plan, mostly the installation cost and details, as well as the construction effect diagram. After the riders and the property confirm that the price and materials are correct, workers can enter the site to install charging piles. At this time, if the national grid routing has been completed, then your charging pile can be used normally after it is connected. Because charging piles are also necessary supporting equipment for automobiles, many automobile manufacturers have different installation policies for charging piles, and some are also responsible for installing charging piles for free. Some manufacturers provide the necessary installation funds, and a few need customers to pay the fees.

5. If the fixed charging pile is not completed, you can use the portable charger for emergency. Because of multi-party negotiation, this kind of construction will be slower, and it is abnormal that the construction period is mostly about one month. Then in the period when there is no private charging pile, in addition to charging in public charging stations and 4S shops, under the premise of ensuring safety, you can also use portable chargers for emergency, but&; Ldquo flight route &; Rdquo is exposed after all, and it is not recommended to use it for a long time.

What should I pay attention to in the installation guide and cost of charging piles for new energy vehicles?

1. Safety issues cannot be ignored: for the safety of others and public facilities, there may be many problems in the property, such as whether the charging pile will catch fire, leak electricity and short circuit. Therefore, it is necessary for the staff to answer patiently during the investigation. Don't get angry because of financial difficulties. I think paying attention to safety is also responsible for the safety of others.

2. Fixed parking spaces: Even if some riders have fixed parking spaces for annual rent, few residential properties are easy to manage, which avoids the trouble of disassembling equipment after renting out, so simply let the parking spaces be equipped with charging piles. What's more, the car owner can only install the charging equipment after purchasing the parking space. So go to the property in advance to understand the parking situation.

It can be seen that the installation of charging piles is not necessarily a simple verbal matter, but requires a lot of work from friends. Note: if the user entrusts the 4S shop to install the charging pile and negotiates with the power company, the user does not need to pay the cable pulling fee. However, if the user comes forward or connects the household electricity with the residential property electricity, the user will have to pay the cost of wire installation. If the charging pile is damaged during use, you can consult the automobile manufacturer or 4S shop for after-sales service. I hope that the installation guide and cost information of new energy vehicle charging piles shared by Bianxiao Automobile can help friends better understand the problem.