4. 1 Layout principle
4. 1. 1 Arrange according to the site scope specified in the tender documents;
4. 1.2 Reasonably arrange the construction site, so that the traffic at all stages of construction is convenient and smooth, people and logistics can reach their destinations smoothly, and reverse transportation and secondary handling can be reduced as much as possible.
4. 1.4 comprehensively consider factors such as plane layout, engineering quantity and geological conditions, and divide the construction area according to the principle of meeting production needs and facilitating construction and management, so as to minimize construction interference. Compact layout, land saving,
4. 1.5 The plane layout meets the requirements of safety, flood control, fire prevention, explosion protection and environmental protection.
4.2 Construction site layout
4.2. 1 Construction living area: According to the principle of "beneficial to production, convenient to life, and beneficial to the health and safety of employees", temporarily rent nearby residential houses and container-type mobile homes.
4.2.2 Construction office area: container-type mobile homes shall be adopted uniformly.
4.2.4 Equipment stacking area: The equipment stacking area shall be arranged in the construction site near the substation, and the equipment stacking area shall be arranged near the foundation of each wind turbine.
For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd