Engineer's performance summary report 1
I joined the group in 20__, and have been responsible for the technical support and process audit of energy technical transformation and new projects of the whole group company. The professional and technical work in recent years is summarized as follows:
First, the political demands for progress.
Over the past few years, I have actively participated in various trainings organized by the company, made full use of my spare time to learn the Party's line, principles and policies through magazines, newspapers, computer networks and TV news, supported the Party's leadership, supported the socialist system, supported the reform and opening up policy, loved chemical technology and engineering work, and was full of affection for the units I served.
Second, pay attention to learning at work.
If you can learn and master new technologies, new knowledge, new standards and new norms in time and apply them to your work, you should persist in strengthening the study of chemical technology according to the needs of your work and apply the skills you have learned to your practical work, so that your business level will be greatly improved and you will have strong business working ability. In recent years, I have been engaged in technical and management work in multiple positions, and can obey the arrangement of leaders according to the needs of work. When I was a technician in industry and trade, because I studied chemical engineering and technology, there were many shortcomings in silicate deep processing. I study and work in my daily work, strive to improve my professional and technical level, and learn the advanced glass deep processing technology in China.
During my work in this company, I have a certain foundation in silicate deep processing, and because I have strong drawing ability in chemical industry, I constantly improve my professional skills in practical work and strive to learn more advanced processing technology. During this period, I completed the design and drawings of Suzhou high-speed rail window glass processing, successfully completed the project, and created brand benefits and economic benefits for the company. In addition, in 20__, the company cooperated with Asahi Glass, the largest glass company in the world, and undertook the tempering project of solar glass of Asahi Glass Company. In this project, I am mainly responsible for the quality control of tempering. Through the unremitting efforts of the whole company, the tempering of the solar glass of Asahi glass was finally completed, which made its own contribution to the brand value of the company.
20__, moved back to my hometown to work in March, and joined this company group after returning to my hometown to hold my present position. Joining the company is closer to my major. In my work, I made better use of the professional skills I learned during my college years, constantly studied and improved myself in my company's work, and made my own efforts in many engineering projects, such as dry quenching, flue gas waste heat recovery, low-concentration gas power generation projects in coal industry, and energy-saving technical transformation projects in steel. In addition, the on-site engineering of steel slag barrier process was investigated, and the most advanced steel slag treatment process in China was most intuitively and aptly understood.
It laid a technical foundation for the new technology of steel slag treatment in the future. In addition, this year, we also carried out the investigation and environmental impact assessment of the 600,000-ton steel slag micropowder project in the second phase of Sub-products Co., Ltd., put forward our own opinions on the feasibility analysis of the project and the preparation of the environmental impact assessment report, and participated in the preparation and evaluation of the project. It laid a theoretical foundation for the implementation of the next project. In the process of constantly improving and upgrading myself, I love this job more and more. Will make its own contribution to the progress of the company.
Third, do a good job of passing, helping and bringing.
Since joining energy group co., ltd. in 20 years. Because I am a newly established energy management department, there are few professional and technical personnel and lack of professional skills guidance. In addition, most employees are recent and their technical level is relatively insufficient, so the manager asked me to help and teach you professional skills. I patiently taught them the knowledge of chemical technology, not only the theory, but also in some places. At the same time, I teach them some principles of being a man, so that they can like this job quickly. After more than a year, they can not only work independently, but also become the backbone of the department. In the process of project assistance, we do our best, do our duty, and combine theory with practice, so that everyone can get in touch quickly and easily in the learning process, and at the same time learn from each other's strengths and constantly enrich themselves.
Fourth, study patiently at the professional level.
Because the times are developing and society is progressing, some high and new technologies are constantly being put into the energy industry. Especially in recent years, the problem of energy utilization has attracted more and more attention from the society. Many energy-saving technologies and waste heat recovery technologies have been put into practical production process. In order to better serve the company, we have to constantly improve ourselves, study patiently, study hard, learn new knowledge and new technology, and put forward new projects that are more energy-saving and more environmentally friendly in combination with the actual situation of the company. To this end, I often contact various energy-saving service companies to learn about the latest energy-saving technologies in China, and put forward some ideas to the leaders according to the actual situation of the group. I hope I can better serve the company and be responsible for my work.
Verb (abbreviation of verb) professional continuing education
Due to the need of work, I attended the advanced seminar on investment, financing and capital operation in colleges and universities held in Taiyuan in June 2000. We should not only know the knowledge of our major, but also look at the whole domestic economic situation to understand the economic situation and avoid the narrowness of theoretical study. The study of this seminar made me fully realize that technical work should adapt to the market economy in order to highlight the role of technology as the primary productive force.
The above is a brief description of my technical work in recent years. Through learning from books, learning from practice, learning from others, plus my own analysis and thinking, I have indeed made great gains and progress. However, achievements and shortcomings coexist, and experience and lessons keep pace. Overcome shortcomings and learn endlessly. In the future, I will, as always, go all out in my work, keep learning, strive for progress, constantly improve my professional quality, exercise my working ability, sum up experience and learn lessons, do my work better, serve the training and care of the unit, and contribute all my energy to the unit and the port cause.
Engineer's performance summary report II
20__ years have passed, and in a busy year, with the help of company leaders and colleagues in various departments, I successfully completed the work of _ _ engineer this year. In order to work better in the future, sum up experience and learn lessons, I summarize my work this year as follows:
First of all, talk about work attitude, because attitude determines everything. I have been adhering to the belief of being an honest man, and I have been working hard until now, saying that I should be worthy of the company's training and my salary; Being young means being worthy of your youth and your future. To be honest, this job is actually very stressful for me. When I first arrived at the company, the workload was not very heavy. Mainly to express the company's previous equipment and facilities, maintenance plan, maintenance cost budget, etc. In electronic form, and establish the corresponding files, and then do some maintenance on the previous equipment.
First, good ideological and political performance
My principle in dealing with people is "study hard, work hard, be an upright person and live a happy life". I am strict with myself, work hard, treat others sincerely, and match my words with my deeds. Law-abiding, modest and prudent, decent style, with good ideological quality and professional ethics. Actively demand progress, unity and friendship, courtesy and integrity.
Second, weight-bearing exercise, encourage and tap the potential, and better complete the work.
Strengthen the sense of responsibility, carry forward the spirit of struggle, and enhance the sense of pioneering and innovation.
Third, constantly strengthen theoretical study and expand knowledge.
Concentrate on studying the current situation and development trend of computer technology at home and abroad, absorb rich computer theoretical knowledge, improve the ability to solve practical problems of this major, coordinate the relationship between this major and related majors, coordinate and solve related technical problems, and guide engineers to work and study. It also strengthens the ability of writing expression, organization and coordination and judgment and analysis.
Fourth, the direction of future efforts.
1, caught in the special situation of serious transactional work, the role technology must be changed. Modern newspaper technicians in the new era should be technical organizers, network security builders, news and information product developers, information technology service consultants and information technology teachers.
2. To innovate, we need to subconsciously strengthen technical management, and pay equal attention to technology and management.
3. We can't be complacent about the status quo, don't make progress, and can't enjoy a market, which will not be conducive to the development and innovation of the Group's technology.
4. Strengthen the training of journalists' computer knowledge, promote the development of information construction and reduce the overall maintenance cost of construction.
Engineer's performance summary report 3
20__ years have passed inadvertently, and it is the fifth year since I came to _ _. Looking back on this year's work, the company leaders paid special attention to it, arranged the work tasks reasonably, and still had time to prepare for the registered cost engineer seriously in the heavy work tasks. During this period of work, I worked hard to complete my work and actively cooperated with my colleagues and other ministries. As a cost engineer, I work in strict accordance with the rules and regulations of the company and the engineering department, and complete the engineering audit work of the engineering department on time and with good quality. The following is my summary since 20__ years:
Work completed according to the requirements of company leaders.
1, __C2 plot settlement audit.
2._ _ Decoration project of printing and dyeing office building, comprehensive building and dormitory in Binhai Factory.
3._ _ Real estate development projects.
4. _ _ A series of project budgets.
5. Obey the work arrangement of the company leaders, take the interests of the company as the foundation, complete the duties and cooperate with other colleagues in the company.
6. Use the rest time after work to prepare for registration as a cost engineer. I applied for four subjects at one time this year, and I want to pass the cost engineer exam at one time. Although it is difficult, God will repay those who help him. I believe that as long as we have a correct attitude towards exams and study hard, there is still hope.
7. Make a good work plan for the next year, so as to do every job in an orderly way.
As the saying goes, it is never too old to learn, especially in cost audit. In the audit process, we often come into contact with many new things and encounter many new problems, but at the same time, it will also provide us with opportunities to learn new knowledge and experience, so that we can improve our ideological understanding and work ability. While learning a lot of new knowledge, I also understand my own shortcomings.
First of all, it is very important to improve the professional knowledge and skills of cost. Now the engineering cost industry has moved from the era of manual calculation to the era of computer calculation, and the whole industry is vigorously promoting the mode of bill pricing. Fast electronic calculation and cost software are essential for cost engineers. After such a long period of theoretical study and practice, I have basically mastered some basic skills in using Guanglianda computing software and tea pricing software. I will strengthen my exercise in this area and pay attention to my study skills in the future.
Secondly, our company is a cost consulting enterprise, which can be said to be an intermediary service company. It is to provide professional suggestions and opinions on project cost for construction units and construction units. A professional and profound understanding of project cost is the foundation of our foothold. Besides, we must have good communication skills to provide better service. The construction unit and the construction unit are often opposed to each other in the project cost. One side wants to earn more and the other side wants to spend less. Our consulting unit is the bridge between them. Good communication skills can make us more familiar with them, understand their needs and differences, and then on the basis of maintaining the principles, use our professional skills to eliminate their differences and achieve a win-win situation for both sides.
Although this year's work tasks and preparation for the four exams for cost engineers are very busy and hard, they are all worthwhile. In the process of preparing for the exam, through the study of the teaching materials, I know that I have not done well in many aspects of my usual work. Through this preparation, I feel that my professional knowledge, skills and audit reform ability have been greatly improved, which is the harvest of my efforts.
The above is my year-end summary. If there is anything wrong, please ask the leaders to criticize and give directions.
Engineer's performance summary report 4
In a blink of an eye, 20__ years passed quietly. Looking back on this year, I summarized my personal work in 20__ years as follows: With the strong support of the leaders and colleagues of the Institute, all the staff of the Design Institute, Qi Xin, worked together to overfulfil the scheduled target in 20__ _. Summarizing the past year, the main work contents are as follows:
First of all, the workload
In the past year, I mainly participated in the structural design of buildings in Liangzhou District of Wuwei City, guo zhuang cun City, Tumen City of 20 Gulang, Jinsha Township, Gulang People's Visiting Hall and Zhangye Sanyi Chemical Plant. Through my own efforts, I faced difficulties and constantly solved the problems encountered in my work, and finally successfully completed the task of 350 thousand yuan output value given to me by the college. In terms of personal workload, I completed an output value of 545,000 yuan, and the actual fee reached 382,000 yuan. While successfully completing the task of output value, I also improved my professional level. Here, I thank my leaders and colleagues for their support and concern.
Second, other aspects.
(A) to deal with on-site problems
It is a skill and an obligation of structural designers to deal with the problems existing in site construction and coordinate the relationship between various units involved in construction.
(2) Drawing quality.
As a structural designer, this requirement is more stringent, because the drawings we design directly affect the reliability and economic rationality of the building, so I never dare to ignore the quality of our products in my work. I often communicate with professionals and technical backbones. When encountering technical problems, actively consult predecessors and leaders. At the same time, look up and browse information on the Internet, and strive to solve the problem reasonably and comprehensively.
(C), with the old with the new
As a master, I carefully guide my apprentice's work, urge him to study the specifications and software operation seriously, answer the questions in the design process and the problems found in the drawings seriously, and minimize the problems in the drawings as much as possible, so that the tasks assigned by the company can be successfully completed.
(4) Marketing
Seeking the market through the relationship of friends is also an important opportunity and task to exercise yourself. I must seize every information, strive to win the market and contribute my meager strength to the company and research institute.
(5) Registration examination
Because of my inertia, I didn't take the registration exam seriously, and the registration exam of 12 was not ideal. This year, I will correct my mind, adjust my mentality, actively strive for review time, cherish the examination opportunities provided by my unit, and strive for good results in this year's exam.
(6) Pay attention to unity and harmony.
A design unit is like a team, which operates by teamwork. A design project involves the cooperation of many professions, and each profession also needs many links such as design, drawing and drawing review. Teamwork is particularly important in design.
To sum up, I came into contact with many new things, produced many new problems, learned a lot of new knowledge and experience, and improved my ideological understanding and working ability. In my daily work, I always ask myself to proceed from reality, adhere to high standards and strict requirements, and strive to improve my professional quality and moral quality.
Finally, I sincerely thank all the leaders of the company and all my colleagues who care about helping me. I wish you all greater achievements in the new year.
Engineer's performance summary report 5
In the past five months, under the leadership of the engineering service department, through the struggle with my colleagues and my own active efforts, I have done the following work.
1. Work attitude and ideological work. Work attitude, I love my job very much, I can be strict with myself, abide by the systems of the engineering department, maintain a responsible work attitude, learn with an open mind, take the initiative, constantly improve my technical level, and strive to do the best in every task assigned by the leader. Guide the installation work.
2. Guide the installation work. In the practical work of Jinli permanent magnet installation, through the installation of pipeline interface, rectifier cabinet and control cabinet, the understanding of equipment process flow and line power supply and distribution is deepened. It also cultivated my ability to understand the schematic diagram of electrical wiring and the installation diagram of pipeline connection. At the same time, I also learned the cognitive skills of equipment spare parts. Every step of the installation process is done in detail. Found lye filter installation errors, timely put forward and correctly installed. Although the guidance work was successfully completed, it was found that the understanding of plc model configuration, detailed names of accessories and functions in the control cabinet was not deep enough. Focus on some technical drawings in the future, and go to the material support department to learn about accessories after work. Ask colleagues and leaders if you don't understand. Equipment testing and debugging.
Third, equipment testing and debugging. When Saudi equipment was tested and debugged in the workshop, the startup sequence and pid parameter setting of cndq- 10 hydrogen production equipment in power plant were known. At the same time, understand the working principle of rectification from the shallow to the deep. Before commissioning, ensure that the straight-through cylinder is 90 degrees and the tee is 180 degrees. The straight-through ball valve adjusts the closed state. Jordan's pneumatic diaphragm control valve should be initialized and adjusted. During debugging, the image equipment can't reach the system pressure, the actual liquid level doesn't match the upper computer, and the electric pump is sometimes damaged. Therefore, we should make an appropriate investigation according to the actual situation.
Fourth, the future direction of work. Next month, we will focus on the content of debugging stage. Cultivate your ability to find fault. Feedback the problems found on the spot to the leaders and ask more questions. Make up for the shortcomings in the future work and strive to do the work better.
Articles related to the engineer's performance summary report:
★ Five essays summarizing the personal work of engineers.
★ 5 excellent papers summarizing engineers' personal work in 2020.
★ Five essays on the summary of engineers' work in 2020.
★ Excellent Edition of Engineer's Personal Work Summary
★ Selected Summary of Engineer's Personal Work
★ Engineer's annual work summary model essay daquan
★ Summary of personal work of technical engineer
★ Selected 5 reports of the annual work summary of engineers in 2020.
★ Model essay on technical engineer's work summary