Model plastering contract 1

The labor contractor (hereinafter referred to as Party A) and the subcontractor (hereinafter referred to as Party B) plastered the 3# building of Dongshan Xiakou Return Project in _ _ _ _ _ _ City contracted by the general contractor. Due to the needs of the project, the plastering work inside and outside Building 3 of Dongshan Xiakou Return Project is subcontracted to Party B for construction. In order to clarify the responsibilities, rights and interests of both parties to complete the project tasks according to the contract time limit, this contract is hereby signed through consultation in accordance with the provisions of the Economic Law of People's Republic of China (PRC) and the Labor Law for mutual compliance.

I. Project Name: Building 3 of the Municipal Return Project

Two. Project location: _ _ _ _ _ _ _

3. Form of contract: contract liquidation.

IV. Contents of the contract:

1, plastering of internal and external walls shall be subject to the construction drawing, and it shall be transported by mixing with sand and mud; Wet wall surface, gunite, plastering ash cake, plastering net, corner wrapping, door and window wrapping edge, ceiling shade edge, roof parapet, roof truss, awning, roofing fine stone leveling, gutter leveling, stair step calendering, balcony, air conditioning board, internal and external mortar plastering; A complete set of procedures for external thermal insulation surface, ground fine stone leveling and bottom ground fine stone leveling (5cm to 10cm). In short, all mortar plastering, thermal insulation surface and fine stone concrete on the drawings shall be constructed at the contract price of Party B on average .. (Party A shall be responsible for the construction of granite paving).

2, in strict accordance with the plastering, balcony, floor, roof and other decorative mud engineering current standard operating procedures for civilized and standardized construction, in this work area must be done after the site cleaning (left hand clean) work habits.

Verb (abbreviation of verb) contract price

If the project quality reaches one-time qualification, it shall be settled in 45 yuan per square meter of the construction area above the basement contracted in point 4 of this contract. (The calculation rules of construction area shall be subject to the settlement method of this project department)

Payment and settlement methods of intransitive verbs

1. Party B shall report to Party A the quantities completed this month before 25th of each month, and the accountant shall settle the project payment according to the actual progress of the project, and pay 80% of the project payment in the next month (20th to 25th). The progress was not completed, which affected the construction of the next working procedure and was punished. If the quality does not meet the requirements, Party B shall unconditionally rework until it is qualified, and bear the relevant economic losses caused thereby. After the construction is completed and the project department meets the pre-acceptance conditions, 90% will be paid, and the remaining 5% will be paid after the completion acceptance. Finally, the hospitality will be paid by the project department to Party A, and Party A will pay it to Party B in one lump sum.

2. The expenses for the safety helmet and raincoat required by Party B at the site shall be borne by Party B. If Party B leaves the site without authorization during the construction, all the balance will not be settled. For employees who retire halfway or postpone retirement, Party A will not consider the salary paid by Party B..

Seven, the time limit for a project requirements

The construction period of this project will be subject to the time specified by the project department.

Eight, quality requirements

The quality target of this project is guaranteed to be qualified. If the first acceptance is unqualified, all the rework losses and indirect losses caused by it shall be borne by Party B, and the unit price shall not exceed 2 yuan per square meter.

Nine. Responsibility of both parties

1 Party A shall provide the materials needed for the project in time. Party B shall undertake: mixer, mortar machine, water pipe, dump truck, aluminum alloy, mud bucket, shovel, broom, etc.

2. Party B shall be able to arrange daily life, and Party A shall not advance the living expenses. Civilized construction should be carried out in engineering construction to ensure safety. All safety accidents caused by Party B shall be borne by Party B. ..

X. The above terms and conditions are agreed by both parties, without objection, and shall be implemented in good faith. This contract is made in duplicate, one for each party. (It will take effect after being signed by both parties, and will automatically become invalid after the project is completed and the payment is made. )

Representative of Party A: Representative of Party B:

date month year

Model plastering contract 2

Party A:

Party B:

According to the principles of "People's Republic of China (PRC) Labor Economic Contract Law" and "Construction Project Contracting Contract", Party A contracts out the plastering works for interior walls and stair steps to Party B, and both parties reach the following agreement:

I. Contents of the Contract

Floor indoor plastering and stair step plastering.

Second, the contract price and payment method

1. Contract price: indoor plastering is calculated as 12 yuan /m2, and stair tread is calculated as 23 yuan /m2.

2. Payment method: After Party B finishes painting, Party A will pay 50% of the construction area of each floor, and after passing the acceptance, Party A will pay the remaining project funds in one lump sum.

Third, the material use requirements

1. After Party B enters the site, according to the actual situation of the project, Party B proposes a consumption plan, which will be purchased by the material engineer.

2. Party B is responsible for customs clearance, and Party A is responsible for providing all materials and tools to the construction site. However, the arrival time and quantity were proposed by Party B two days ago, and Party A's materials and tools should arrive on time without delay. If the materials and tools cannot be supplied after one day, Party A shall inform Party B in advance to make corresponding arrangements, otherwise Party A will compensate Party B for the lost time of workers by 300 yuan/person-day.

3. If Party B delays working hours due to Party A's reasons (power failure, water stoppage, elevator stoppage, the mixer can't operate normally for more than one hour, or Party A's project payment is not timely), Party A shall compensate Party B for the lost time (calculated as 9 hours per day).

Fourth, the construction quality requirements

1, in strict accordance with the current relevant regulations of the state, and at the same time accept the supervision and inspection of site management personnel.

2. Party B shall carry out the construction according to the intermediate plastering standards stipulated by the state and the requirements of Party A's technical disclosure. After passing the self-inspection, Party B shall promptly report to Party A for acceptance. If it is unqualified, Party B shall rework it.

Five, civilized construction requirements

1. All personnel entering Party B's site shall strictly abide by the rules and regulations of the site and conduct civilized construction at the work site.

2. Management of materials and tools: The materials and tools received by Party B shall be collected by the personnel designated by Party B, and the materials and tools received by Party B shall be handled in strict accordance with the site regulations.

6. This agreement is made in duplicate, one for each party, and it will take effect immediately after being signed or sealed by both parties.

Signature or seal of Party A:

Signature or seal of Party B:

date month year

Model plastering contract 3

Party A: Operation Team (hereinafter referred to as Party A)

Party B: Team (hereinafter referred to as Party B)

According to the needs of Party A's construction task, through friendly negotiation between Party A and Party B, and on the basis of equality, mutual benefit and friendly cooperation, Party A contracted the plastering project of the inner wall of Building No.3 in Sanchun Huixiuyuan to Party B for construction by means of internal labor settlement. In order to clarify the responsibilities and rights of Party A and Party B, this agreement is specially signed for both parties to abide by and implement. The specific terms are as follows:

1. Project name: plastering project for the inner wall of Building 3 of Sanchun Huixiuyuan.

Second, the project address:

Third, the structure type:

Four. Building area:

5. Contracting methods: contract clearing, contract quota acquisition, contract quality, contract safety, contract progress (contract duration), contract civilized construction and contract handover acceptance.

Content and requirements of intransitive verbs:

1. Interior wall plastering includes patting, punching, hanging, marking, plugging screw holes, punching with steel mesh, stairs, etc. All plastering surfaces (including flue, pipe hole plug, back plug, lines, hanging holes, steamed bread, etc. ) must meet the decoration engineering quality acceptance standard. All decoration projects should be unified ingredients, the same room color, specifications. Sealing of back plugs of doors and windows and chiseling of masonry in other parts. All the contents of all plastering surfaces in the room. No shell, crack and sand are allowed on the plastering surface. Clean up the ash attached to the decorative surface, spray water to moisten, plug holes, brush slurry, hang lines, erect ash cakes, transport mortar, erect and dismantle indoor plastering scaffolding, and pile them up neatly at the place designated by Party A, so as to clean up the site after work.

2. Interior wall plastering includes background: sand screening, on-site cement transportation, mortar (and fine stone concrete) mixing, etc.

3. Interior wall plastering includes all plastering works (including plastering of stair floors, side windows and bay windows, balcony floors, etc.). ), such as installing grid lines on the decorative surface, shooting, punching, hanging lines (hanging lines), rough plastering (including corner protection), calendering the cover, cleaning the hopper, and plugging the doors and windows. 4. The plastering surface is severely shelled, cracked and sanded, accounting for one tenth of the living room area, and 30 yuan will be fined for each room found. The surrounding walls such as toilets, washrooms and toilets account for one tenth of the living room area, and each fine is 100 yuan. Balcony, bathroom, bathroom, toilet, etc. The flooded area accounts for one-sixth of this room, and each room will be fined 100 yuan. If the difference in width and height between two adjacent steps of each stair section exceeds 1CM, 50 yuan will be fined for each step.

4. Interior wall plastering includes civilized standardization and cleaning within the scope of work. Engineering quantity increased or decreased by design institute and construction unit due to the change of this project.

5. Interior wall plastering includes safe and civilized construction within the scope of contracted projects. Productive temporary construction and demolition, etc.

Seven, the contract unit price:

VIII. Engineering quality standard: 100% excellent rate. According to the quality requirement standard, each contracting team must strictly follow the quality acceptance standard and construction specification. After each working procedure is completed, each team must do a good job of self-inspection and mutual inspection, and then notify Party A, the general contractor and the supervision unit for acceptance. After acceptance, the next working procedure can only be carried out if it meets the quality standards. Can not meet the quality standards, must be in accordance with the acceptance of the rectification measures and requirements for rectification, until the standard. If the rectification still fails to meet the requirements, Party B must bear the double fine imposed on Party A by the general contractor as compensation for Party A's reputation.

Nine. Time limit for a project: the total time limit for a project (implemented according to Party A's image progress) is fully completed. If the construction period is punished, it will be twice the total contract price of Party B. ..

X. Safety requirements and comprehensive management:

1, each contracting team must seriously study and master the safety production management regulations and operating procedures, and construct in strict accordance with the safety operating procedures. Violation of safety operation procedures, illegal operation, resulting in safety accidents, the violator shall bear all the responsibilities.

2. Strictly abide by the laws and regulations of China and Shanghai, obey the command of the general contractor and Party A and other relevant departments, and consciously abide by and implement the rules and regulations of the general contractor and Party A. ..

3. All relevant documents for the contractor to enter the construction site must be complete, and copies and rosters shall be submitted to Party A for the record.

4. When entering the construction site, you must correctly use and wear all kinds of safety protection articles, wear safety helmets and fasten your seat belts. If you find that you don't wear a safety helmet or a safety belt, you will be fined 10 yuan/person, and you will be fined 50- 100 yuan for violating the safety operation regulations and removing the safety protection without the consent of the competent department.

5. It is forbidden to pull wires in the dormitory, and it is forbidden to cook in the dormitory. Once found, in addition to the confiscation of cooking utensils, 200 yuan will be fined once.

6. Fighting, whoring and gambling are strictly prohibited. If found, both parties will be fined 500- 1000 yuan. Then according to the investigation results, the responsible party shall bear all the losses of the other party, and the serious cases shall be handed over to the judicial department for handling.

7. It is forbidden to mix men and women in the dormitory. Without the consent of the competent department, you are not allowed to be with people who are not in this shift. Punish 200 yuan for every discovery, take good care of public property, and do not damage various facilities.

8. Party B shall be responsible for all public security incidents outside the construction area.

XI。 Party A's responsibilities:

1. Be responsible for the technical disclosure of quality, safety, progress, civilized construction and operation specifications to Party B. ..

2. Evaluate Party B's construction ability, personnel quality and technical quality after entering the site, and give Party B a 30-day probation period. If Party B fails to meet the requirements of quality, progress, civilized construction and comprehensive management during the probation period, Party A has the right to unilaterally terminate the agreement, and the engineering quantity will not be settled as compensation for Party A's reputation loss. Party B shall compensate Party A for its economic losses.

3. According to the site conditions, Party B shall be provided with room and board at its own expense.

4. Party A actively creates construction conditions for Party B and makes good coordination.

5. Party A is responsible for supervising and inspecting the quality, safety, progress and civilized construction of Party B, and putting forward rectification opinions and measures for those that do not meet the requirements. If Party B's rectification fails to meet the requirements or refuses to rectify, Party A has the right to send someone to rectify, and the expenses will be deducted from Party B's labor expenses at twice the amount of rectification work.

Twelve. Party B's responsibilities:

1. Organize the corresponding construction personnel according to the contract quantities. The personnel entering the site must be reasonably matched, and they are male aged 18-45, with good ideological quality, strong technical ability and no health diseases and infectious diseases. Each contracting team has a comrade with strong organizational ability, good technology and strong sense of responsibility as the team leader, forming a systematic management. At the same time, without the approval of Party A's on-site supervision, the team leader shall not leave the site and actively participate in relevant meetings organized by Party A or the general contractor. Leave the site without authorization or fail to attend the meeting that should be attended, and be fined 50- 100 yuan/time.

2. Organize the construction to ensure the quality, progress and safety of the project. Party B shall bear the loss of materials and time limit for a project if it fails to meet the quality standards due to poor management.

3. The personnel entering Party B's site must be relatively stable, and team members shall not be changed at will without Party A's consent. ..

4. Accept Party A's technical disclosure, education and supervision on quality, safety and civilized construction, and obey the command.

5. The rectification opinions put forward by Party A shall be immediately rectified by personnel until reaching the standard.

6. Take good care of the facilities and equipment provided by Party A, and do not damage them at will. If there is any damage, compensation and punishment shall be paid at twice its value.

7. Party B shall return to Party A a payroll of shift workers, which must be signed by the payee.

8. This contract is witnessed by the main members of Party B's team (the signature form is attached).

Thirteen, civilization standardization, health requirements:

1, do a good job in personal, dormitory, site hygiene, keep civilized and clean at any time.

2, in accordance with the requirements of civilized standardization, carefully to classify the materials within the scope of their own contract, neatly stacked.

3, after the completion of each working procedure, must do a good job of cleaning up after work, can use the materials must be used.

4 can not meet the above requirements, according to its nature, scope and value, impose a fine of more than two times, each at least not less than 20 yuan. Fourteen Supply of facilities and tools: In addition to large-scale mechanical equipment provided by Party A, small-scale equipment and tools are provided by Party B (including helmets for shift workers, etc.). ).

Fifteen, labor settlement and payment:

1. In order to ensure the quality and progress of the project, each construction team should pay a deposit of 3,000-5,000 yuan to Party A when signing the contract. After the completion of the project, if the quality and progress meet the requirements of Party A, the expenses will be returned to Party B in one lump sum.

2. After Party B enters the site for one month, Party A shall pay Party B a monthly living allowance of 400 yuan/person (calculated according to attendance).

3. Pay 80% (including borrowing living expenses and fines) after the decoration project is accepted by Party A's general contractor, and pay 10% after the quality supervision station reaches the quality standard. The remaining 10% shall be used as the project warranty fund, with a warranty period of one year and payment after the expiration of one month.

Sixteen. Others:

1. If there are any matters not covered in this agreement, Party A and Party B shall sign a supplementary agreement through consultation.

2. This Agreement is made in triplicate, with Party A holding two copies and Party B holding one copy.

3. This agreement shall come into force from the date of signing until the project payment is paid in full.

Party A: Operation Team Party B:

Person in charge: Manager:

Handler: Tel:

Project manager:

date month year

Model Plastering Contract 4

Party A: _ _ Construction Engineering Co., Ltd.

Party B: Hubei Plastering Team

According to the principles of "People's Republic of China (PRC) Labor Economic Contract Law" and "Construction Project Contract", Party A subcontracted the interior and exterior decoration project of C4#C8#C 10# residential building in Binjiang Jiayuan Area 4 to Party B, and both parties reached the following agreement:

I. Contents of the Contract

According to the construction drawings, indoor plastering, external plastering, stair stepping and roof riser plastering. (excluding ground, outdoor apron, roof leveling layer, indoor shed scraping, external wall plastering) and other projects.

Second, the schedule requirements

Completed from May 5, 2002 1 day to July 3, 20021day. 65,438+0,000 yuan will be deducted for the overdue day, and the construction period will be postponed due to machinery, power failure and material cut-off.

Three. Payment method and price

The contract price is calculated according to the drawing structure construction area per square meter of 40 yuan. After Party B finishes plastering each building, Party A will pay 80% of the project progress, and after passing the acceptance, Party A will pay the remaining project funds in one lump sum.

Fourth, the material use requirements

1. After Party B enters the site, according to the actual situation of the project, Party B puts forward the demand plan for machines, tools and additives, and submits it to the company manager for approval, and the materials engineer will purchase it.

2. The waste of materials caused by Party B's management shall be deducted from the contract project payment according to the highest on-site price.

3. Party B is responsible for clearing the package, and all materials are supplied by Party A to the construction site. However, the time and quantity of entry are proposed by Party B three days ago, and Party A's materials and tools should enter the site on time without delay. If the materials and tools cannot be supplied after two days, Party A shall inform Party B in advance to make corresponding arrangements, otherwise the losses shall be borne by Party A. ..

Five, the construction quality requirements

1, in strict accordance with the current relevant regulations of the state, and at the same time accept the supervision and inspection of site management personnel.

2. For individuals or teams with quality defects who do not listen to the management of site management personnel, the site management personnel have the right to suggest dismissing the project manager;

3. Party B shall carry out the construction according to the intermediate plastering standards stipulated by the state and the requirements of Party A's technical disclosure. After passing the self-inspection, Party B shall promptly report to Party A for acceptance. If it is unqualified, Party B shall rework unconditionally, and the expenses for reworking materials shall be borne by Party B. ..

4. It is forbidden to use overnight ash, and it is forbidden to use dry ash to eat pulp in order to speed up the construction progress. Once found, fine (RMB): 500 yuan;

Six, civilized construction requirements

1. All personnel entering Party B's site shall strictly implement the reward and punishment system and rules and regulations on site, and put an end to all bad habits. If found, Party A has the right to expel it from the site or impose a fine.

2. Strictly implement the on-site access inspection system. Without Party A's permission, off-site construction personnel are not allowed to spend the night at the site, enter the office or other people's dormitory in disorder, and stop all theft. After the discovery, it will be given a warning, a fine or even criminal responsibility according to the seriousness of the case.

3. The hourly workers on the construction site shall be signed by the foreman, and the hourly wages shall be settled in the settlement month.

4. Civilized construction on the construction site, and clean up the site after work.

5. Management of materials and tools. The materials and tools received shall be collected by the personnel designated by Party B, and the delivery time shall be implemented at the site. The materials and tools received by Party B shall be handled in strict accordance with the regulations of the site and taken back to the site according to the ticket.

Seven. Safety requirements

All personnel involved in Party B's construction must strictly abide by the rules and regulations of the site, follow the instructions in all actions, and put an end to all undesirable phenomena. Violators shall be dealt with according to relevant rules and regulations, and the responsibility of the person in charge of Party B shall be investigated. Construction personnel must wear safety helmets when entering the construction site. The responsible party shall be responsible for any safety accident during construction.

Eight. This agreement is made in duplicate and shall come into force after being signed or sealed by both parties;

Party A (full name) (signature or seal)

Party B (full name) (signature or seal)

_ _ _ _ _ _ _ _ _ _ _

Model plastering contract 5

Party A:

Party B: Team Leader: ID number:

Technician: ID number:

In accordance with the relevant national laws and regulations and the specific conditions of this project, in order to ensure the realization of the project quality, construction progress and safety objectives, Party A and Party B, on the basis of voluntariness, equality and mutual benefit, have entered into this contract through consultation and abide by it jointly.

Article 1 General situation of contract

1, project name:

2. Scope of contract: plastering of internal and external walls (specifically including: plastering of internal walls, ceiling repair, hanging nets at the junction of beams and walls, all roofing and wall works, tiling before elevators, backfilling and leveling of toilets, tiling of stairwell walls, roofs, treads, rest platforms, laying tiles on footstones, hanging anti-crack nets on external walls, setting out, finding rules, watering and wetting, gluing, mixing mortar and transporting ash. Such as: electric hanging basket, scraping rod, construction wire, batten, steel wire, ash hopper, safety helmet, gloves, shovel, iron trowel, ash board, consulting board, cables and light bulbs other than lighting and distribution box. In short, after Party A's main body is delivered to Party B, all internal and external painting works must be cleaned up to meet the acceptance criteria and all engineering construction requirements for civilized and safe construction on site.

3. Contract form: A single contractor contracts to Party B, namely, labor, construction period, quality, accessories and tools.

4. Construction period: The total construction period starts from the 20th of next month. No matter which building is mainly completed, Party B must organize all forces according to Party A's overall progress plan, ensure that there are enough teams and personnel inside and outside each building to carry out construction at the same time, complete all construction tasks in the current period with good quality and quantity, and reasonably adjust the number of construction personnel according to the progress plan and actual workload in the construction project (do the work of key personnel before busy farming). Improve the management level, strive for the early completion of all contracted projects, and ensure that Party A arranges the construction period, which shall be subject to Party A's total construction period. If Party A fails to meet the requirements of the total construction period and Party A has requested to improve the labor progress within a reasonable time without any effect, Party B shall bear the direct losses related to the construction period delay.

5. Party B shall have full-time personnel in charge of technology, quality, safety and progress at the construction site; It is convenient for Party A to manage and coordinate.

6. Construction machinery

(1) Party A provides a material hoist for vertical transportation, and Party B drives the mixer.

(2) Main raw materials, etc. Party A shall provide all necessary sand and ash materials according to the engineering requirements, and Party B shall be responsible for all remaining materials, such as sand, cement, mesh, mortar brick materials and glue.

(3) Party B shall use the equipment and materials provided by Party A in a planned and organized way based on the principle of saving materials, and shall not damage the mechanical waste. If Party B exceeds the national quota, the excess expenses will be fully compensated to Party A at one time;

Article 2 Contract Unit Price and Payment Method

1. Contract unit price: calculated according to the construction area in the construction design drawings (excluding the basement area), the agreement includes the elevator shaft, and the unit price per square meter excluding the area is () yuan.

Calculated, the plastering area of the basement is RMB per square meter, the step is RMB per square meter according to the actual area, and the tile of the elevator front room is RMB per square meter according to the actual area.

The price is a one-time guaranteed price, and the price will not be adjusted after the labor cost rises. After the team comes into play, it is necessary to make a sample room, which will be accepted by the project department management and supervision company.

After the probation period, each team can't meet the quality requirements of Party A, and Party B's work can't meet the requirements and satisfaction of Party A during the project period. Party A has the right to terminate the contract, and 50% of the completed works will be retired. In case of reverse engineering, all materials shall be borne by Party B..

2. Payment method:

(1) Borrow the project according to 70% of the completed project quantity after monthly acceptance.

(2) Payment shall be made when the project completion acceptance reaches 90% of the total excellent projects in the city.

(3) The rest of the entertainment expenses shall be paid after Party A's completion and acceptance.

Note: The accumulated fine of the previous construction stage before each payment shall be deducted at the time of payment.

3. Payment process: Each team shall summarize the quantities and corresponding labor costs according to the progress of the current month and submit them to the Engineering Department. After being reviewed and signed by relevant personnel (full-time safety administrator, quality inspector and manager of engineering department), the engineering department will summarize the progress and labor cost of each building and submit it to the project department. After the leaders of the project department review and sign, the financial department will distribute the labor costs to each team.

Article 3, the project quality:

1, the project quality should comply with the relevant national acceptance specifications of the construction industry and the quality requirements and standards of the construction and supervision units. In the construction drawing, it is required that the angle of yin and yang of plastering parts should be vertical and smooth, so as to facilitate post-construction acceptance.

2. The construction quality must be at the municipal level, and the quality shall be subject to the acceptance of Ruian Quality Supervision Station.

3. Carry out the construction in strict accordance with Party A's technical disclosure and construction management .. If Party B fails to meet Party A's technical disclosure requirements and fails to pass the intermediate acceptance at one time, Party B will bear all losses.

Article 4: Safe production and civilized construction;

1. During the construction process, Party B shall strictly abide by the safety operation rules and safety technical measures, correctly use safety protection articles, regularly carry out safety education for all workers in the shift, implement the policy of "safety first, prevention first", do a good job in safety technical disclosure of each sub-project, earnestly carry out safety production and civilized construction, earnestly study the safety technical operation rules, and do a good job in safety technical disclosure of each sub-project to ensure construction safety.

2. This project is a model project of civilized construction, and the site must be kept clean and tidy for cleaning after work. Party B must abide by the rules and regulations formulated by Party A, and it is forbidden to fight, drink too much and make trouble. Keep the construction site clean and tidy. It is forbidden to urinate on the construction site. Workers' accommodation areas should be neat and orderly, and the indoor and surrounding areas should be kept clean. Each team should actively cooperate with the full-time security officer and the person in charge of the building number to do a good job in safe and civilized construction. The project contracted by Party B must meet the standard of civilized model construction site.

Article 5. Responsibilities of both parties' work

1, Party A's work and responsibilities:

① Party A shall make technical disclosure and safety disclosure to Party B according to regulations.

(2) Party A is responsible for guiding Party B to carry out the construction according to the standard operating procedures, checking the construction quality, supervising the construction progress and paying the project funds on time.

(3) Party A is responsible for ensuring the power supply and water source facilities for Party B's temporary electricity utilization. (4) Party A is responsible for providing drawings and technical data related to construction.

2. Party B's responsibilities:

(1) When this contract is signed, Party B promises to organize on-site construction within 3 days of the date specified by Party A, and complete it with good quality and quantity within the agreed time limit. If it is overdue, it will be fined 1 1,000 yuan per day. All workers entering the site must provide valid certificates, such as ID cards. Special posts must provide corresponding work certificates. )

(2) Party B is responsible for ensuring that the cavity filling is completed at one time before plastering, and removing the residual wood, steel bars and other sundries, and cooperating with water and electricity installation, otherwise rework will be at your own risk. The production of this kind of work

Unprocessed construction waste should be removed from the construction site in time. Keep it clean and hygienic.

(3) Party B promises to save materials, clean up the site after work, and be responsible for returning unused materials. For example, every time a waste of materials is found, 200 yuan will be punished.

(4) Party B promises to abide by the on-site management system of Party A, and shall not subcontract the project, specifically according to the reward and punishment clauses of Party A..

⑤ Party B must abide by Party A's working hours, take a vacation without Party A's consent or take a vacation in advance on legal holidays, and Party B shall bear a penalty of 2,000 yuan/time. ⑥ Party B promises to operate and use the machinery and equipment according to the specifications, and be responsible for the maintenance and compensation for the damage caused. Responsible for full compensation for labor tools and safety supplies that are lost or damaged without reason.

⑦ Party B promises to complete the handover procedures. After the process of our team is completed, it must be cleaned up and handed over to the team of the next process. Otherwise, it shall bear the penalty of 500 yuan per process, and matters not covered shall be settled by both parties through negotiation.

Article 7 Liability for breach of contract: If either party breaches the contract, it shall compensate the other party at 5% of the total project cost.

Article 8. Other agreements

1. dispute settlement: any dispute arising from the performance of this agreement shall be settled by both parties through consultation; If negotiation fails, either party may bring a lawsuit to the people's court with jurisdiction.

2. This agreement shall come into effect after being signed by the representatives of both parties, and shall be terminated after the project is accepted and handed over and Party A has paid off all the project funds.

3. This Agreement is made in duplicate, with each party holding one copy.

Party A:

Seal (signature) of Party A's representative:

Party B:

Seal (signature) of Party B's representative:

Date of signature: year month day.

Concise relevant clauses of the model plastering contract;

★ Simple gypsum contract template

★ Mei Sen Project Contract Template Concise Edition

★ 3 copies of contract model for wall plastering project.

★ 3 simple labor contract templates

★ Simple internal and external wall plastering construction contract

★ 3 concise model labor contracts.

★ Concise Edition of Labor Contract in 2020

★ The latest wall plastering contract template

★ Plastering subcontracting template

★ Demonstration Building Plastering Subcontract

var _ HMT = _ HMT | |[]; (function(){ var hm = document . createelement(" script "); hm.src = "/hm.js? fff 14745 ACA 9358 ff 875 ff 9 ACA 1296 B3 "; var s = document . getelementsbytagname(" script ")[0]; s.parentNode.insertBefore(hm,s); })();