From central Liaoning to Goldman Sachs, it can be officially opened to traffic.
The earliest is from 1 1 in 2023 to 1 in 2024. According to Liaoning media reports, this road has entered the stage of traffic coordination and trial operation, and it is expected to be officially opened to traffic as soon as 2023 1 to 20241. Liaozhong-Goldman Sachs is an important traffic trunk line connecting Shenyang and Dalian, with a total length of about 1 10 km, which is mainly composed of expressway and national highway. After opening to traffic, it will effectively alleviate the traffic pressure between the two places and strengthen the economic ties and development in Northeast China.