What is the consulting standard of project cost?

Take 202 1 Hebei construction and installation engineering cost consultation as an example, and the charging standards are as follows:

1. Construction drawing budget, pre-tender estimate, bill of quantities and tender measurement and valuation: the construction area of civil installation works is 0.5~3 yuan /m2.

II. Analysis on the price and quotation of bill of quantities for civil installation:1000 ~ 5,000 yuan/bid.

Third, the whole process of civil engineering installation cost tracking consulting services: 3~8 yuan/m2.

Four. Measurement of concrete and formwork: 0.3~ 1.2 yuan /m2.

Verb (abbreviation of verb) Measurement of reinforcement: 0.2~0.8 yuan /m2.

Six, masonry measurement: 0. 1~0.3 yuan/square meter.

Seven. Fine decoration: 2 yuan /m2.

Eight. Luxury decoration: 5 yuan /m2.

9. Curtain wall project: 0.35 yuan/m2.

X. Indoor water supply and drainage works: 0.2 yuan/m2.

XI。 Indoor heating project: 0.24 yuan/m2.

12. Indoor ventilation and air conditioning project: 0.36 yuan /m2.

Thirteen. Indoor fire fighting project: 0.32 yuan/m2.

14. Indoor electrical engineering: 0.35 yuan /m2.

15. Indoor intelligent project: 0.2 yuan /m2.

16. Outdoor facilities: 0.6 yuan/m2.

17. annex building and outdoor environment: 0.6 yuan/m2.