Introduction by expressway Chengren?

Chengren expressway refers to Chengdu-Renshou expressway, a part of Chengzi-Luchi expressway, with a total length of 63.8 kilometers in Renshou. Zhong Da Consulting consulted various building websites to obtain information about Chengren Expressway:

Chengren Expressway enters the territory of Renshou in Meishan City from Dalin Township, Shuangliu County, Chengdu, passing through 12 townships, namely Aoling Township, Wengong Township, Gufo Township, Jia Zhu Township, Baoma Township, Fujia Township, Shizui Township, Wanglong Township, Baofei Town, Lujia Town, Wang Yang Town and Swan Township, and is located in Wengong, Renshou (urban area) and Fujia Township.

Chengren Expressway starts from Jiangjia of Chengdu Ring Expressway and ends at Zhichanggou at the junction of Renshou County of Meishan City and Weiyuan County of Neijiang City, with a total length of about 106.6 km.

According to the Reply of Sichuan Provincial Department of Transportation and Sichuan Provincial Development and Reform Commission on the Trial Vehicle Toll from Chengzi to Luchi, expressway, Chengdu to Meishan (Renshou), the toll standard of Chengren expressway is: 28.842km from expressway in Chengren to Yongxing Town in Shuangliu County, and 77.7 1km from Yongxing Town in Shuangliu County. The basic bus rates are 0.6 yuan/standard car km and 0.5 yuan /0 km respectively. Passenger cars passing through the Er 'eshan Tunnel (2350.5m) will be charged 8 yuan/vehicle toll at the base price; Trucks are charged by weight according to the requirements and charging standard (0.075 yuan/ton-km) in the Reply of Sichuan Provincial Communications Department and Price Bureau on the implementation of truck charging by weight in networked expressway.

The above is the introduction of CBI Zhong Da Consulting to Chengren Expressway. For more information about expressways, please pay attention to the architectural knowledge column of Zhong Da Consulting.

For more exclusive information about the construction industry, please pay attention to the micro-signal of the construction network in real time.

For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.