165438+1October 18. The mobilization meeting for land acquisition and demolition of expressway Tea Farm (including Anren Branch Line) was held. The total length of tea plantation in expressway (including Anren branch line) is 153.655 kilometers, and the route in Anren County is 62.979 kilometers, with an investment of about 8.3 billion yuan, of which the main line is 29.48 kilometers long, passing through four towns, such as Pailou, Lingguan, Anping and Wanghua. Anren branch line has a total length of 33.499 kilometers, passing through Longshi Township, Yonglejiang Town, Yangji Township and Lingguan Town, and connecting with the main line in Shibi Village, Wanghua Township. The whole line is designed according to the two-way four-lane expressway standard. The planned construction period is 3 years, and 424.7 hectares of land will be requisitioned and 303 houses will be demolished.