Project cost consultation refers to the whole process and dynamic cost management of construction projects entrusted by the society, including feasibility study, investment estimation, project economic evaluation, project budget estimate, budget, project settlement, project completion settlement, project tender base price, tender quotation preparation and review, project cost monitoring and providing relevant project cost information.
Engineering cost consulting service refers to the activities of engineering cost consulting enterprises to provide professional services for the determination and internal control of construction project cost and to issue engineering cost achievement documents. The main contents of engineering cost consulting service include: economic evaluation of feasibility study of construction project, investment estimation, preparation and review of post-project evaluation report; Preparation and review of budget, budgetary estimate, settlement and completion report of construction projects; Compilation and review of pre-tender estimate and bid quotation in the implementation stage of construction projects; Compilation and review of bill of quantities; The change of construction contract price and the calculation of claim cost: provide appraisal service for economic disputes of project cost; Provide cost monitoring and services for the whole process of construction projects; Provide engineering cost information services, etc.
2, the project cost settlement audit fee?
There are charging standards for project cost audit fees, and the fluctuation of audit fees can be negotiated by both parties.
3. How is the project cost budget collected?
A, project budget, pre-tender estimate, bill of quantities, tender budget, bill of quantities quotation.
1 The total cost of civil installation project is less than 2 million yuan, and the total cost from 3 ‰ to 5 ‰ is not less than 2,500 yuan. The reinforcement shall be calculated separately.
The total cost of the civil installation project below 23 million yuan is 2.5‰~4‰, and the steel bar extraction is counted separately.
3. The total cost of civil installation project is less than 5 million yuan, and the total cost is 2.5 ‰ ~ 4 ‰, which shall be calculated separately.
4. The total cost of civil installation project is 5-20 million yuan, and the total cost is 2.5 ‰-4 ‰, which shall be calculated separately.
The total cost of the civil installation project below 55,000 yuan is 2.5‰~4‰, and the reinforcement is calculated separately.
6. The total cost of civil installation project is more than 50 million yuan, and the total cost is 2‰~4‰, and the steel bar is calculated separately.
7 decoration project budget total cost of 3‰~5‰ is not less than 3000 yuan.
8. The total budget cost of the garden construction project is 3‰~5‰ and not less than 3,000 yuan, and the reinforcement is counted separately.
9. The total cost of greening project budget is 3%~4‰, not less than 3,000 yuan.
The estimated total cost of 10 project is 2‰~4‰, and not less than 3,000 yuan.
1 1 The total budgeted cost of lightning protection project for electrical installation is 2.5%~3‰, and not less than 3,000 yuan.
12 the total budget for fire water supply and drainage, heating and ventilation is 2.5‰~3‰, not less than 3,000 yuan.
Second, the whole project cost service: 2%~5% of the total investment in construction and installation.
Three. Engineering settlement service: 1. The total settlement price of the basic service fee for settlement audit is less than RMB100,000, and the total cost is not less than RMB 3,000 from 2 ‰ to 4 ‰. Total settlement price100000 yuan, total settlement price 1‰~3‰.
2. 8%~20% of the settlement audit incentive fee shall be agreed upon by both parties according to the increase or decrease.
3. 3‰~ 1% of the total cost of decoration project settlement shall not be less than 3,000 yuan.
4. The total cost of fire water supply and drainage and HVAC settlement is 3‰~6‰, and not less than 654.38+10,000 yuan.
5. The total settlement cost of lightning protection project for electrical installation is 3‰~6‰, and not less than 654.38+10,000 yuan.
4. Calculation of reinforcement quantity (reinforcement drawing): more than 500 tons, 5~8 yuan/ton, not less than 2,500 yuan, which will be calculated separately after checking (the above charging standards are for reference only).
Project budget A project budget is a plan for the income and expenditure of a project in a certain period of time in the future. It can evaluate the investment of the project and reflect the economic effect of the project through monetary form. It is the basis for strengthening enterprise management, conducting economic accounting, assessing project cost and making construction plans. It is also the main basis for bidding quotation and determining the project cost.
4. How does the project cost company charge?
1, engaged in engineering cost business for 5 years after graduation from engineering cost college; After graduating from engineering or engineering economics, I have been engaged in engineering cost business for 6 years.
2. Bachelor degree in engineering cost, engaged in engineering cost business for 4 years; After graduating from engineering or engineering economics, he has been engaged in engineering cost business for 5 years.
3. After graduating from the above-mentioned second bachelor's degree or postgraduate class or obtaining a master's degree, he has been engaged in engineering cost business for 3 years.
4. After obtaining the above-mentioned professional doctorate, he has been engaged in engineering cost business for 2 years.
Information required for examination registration:
1, two copies of ID card and two copies of * high education certificate;
2. Original ID card and education (returned after examination);
3. Six one-inch blue photos;
4, fill in the "qualification registration form" and approved by the unit;
5. Two copies of relevant work certificates issued by the unit.
The application conditions vary slightly from place to place. Please refer to the local examination documents.
5. I am from Guangdong. How to charge for a 70 million project cost consultation? The whole process from budget to settlement
If it is only budget audit and settlement audit, it can be negotiated with the entrusting party according to the high standards stipulated in Guangdong Price Letter [2011] No.742.
_ High standard of engineering budget preparation or audit specified in the document:100 * 0.18%+400 * 0.16%+500 * 0.14%+4000 * 0.
The high standard of project settlement audit specified in the document:
Basic expenses (according to the submitted amount):100 * 0.28%+400 * 0.25%+500 * 0.22%+4000 * 0.16%+2000 * 0.13% =
Benefits: (| subtract |+increase |)*5%=
Don't ask or add, do a whole process of cost control!
6, the project audit fee
The project cost audit fee usually consists of two parts: basic fee and surcharge. The basic fee is generally set at about 0. 1-0.3% of the total cost submitted by the construction unit, and the surcharge is generally set at about 4-9% of the amount reduced by the medium-priced institution.
The audit service fee shall be paid by the construction unit and shall be charged separately in the project investment (the Ministry of Finance has relevant regulations).
At present, the state does not make rigid provisions on the charging standard of engineering audit, but only makes the guiding price. The specific price can be negotiated with the specific audit department.
However, at present, when hiring an audit institution or signing a construction contract, it is agreed at the meeting that after the reduction or exemption ratio exceeds a certain proportion, the audit fees payable in excess of the proportion shall be paid by the construction unit. Prevent joint fraud between the construction unit and the audit unit.