Model collection of engineering technical service contract

Technical service contract refers to a contract concluded by one party to solve a specific technical problem for the other party with technical knowledge. The following is the engineering technical service contract I compiled. Please refer to.

Article 1 of the model contract for engineering technical services

Number:

Date: Year Month Day

China Company (hereinafter referred to as "Party A") is one party and China Company (hereinafter referred to as "Party B") is one party, and both parties authorize their representatives to sign this agreement on the technical consulting service of this project according to the following terms:

1. Party A requires Party B to provide technical consulting services for this project, and Party B is willing to provide such services.

Two. The scope of technical consulting services provided by Party B to Party A is as follows:

1. Stability, deformation and foundation treatment measures of dam foundation rock mass.

2. Flood control and scour prevention and bank slope protection downstream of the dam.

3. Surge problem of reservoir bank landslide and observation technology of bank slope deformation.

Three. Party B's responsibilities are as follows:

1. Party B shall send three healthy and qualified experts to China for technical consultation service for 25 days within the month, and the list of technical consultation experts shall be approved by Party A in advance.

2. Party B's experts shall go to the site for inspection and answer the consulting questions raised by Party A's personnel correctly and comprehensively. Before leaving China, they shall submit the first draft of the consultation report to Party A, and submit the formal consultation report in quintuplicate within one month after leaving China. The contents of the report shall include those listed in annex 1 and be written in English.

3. The time for Party B's experts to provide technical consulting services in China is twenty-five calendar days (including four business days and three weekend days), working six days a week and eight hours a day.

4. While working in China, the experts shall abide by the laws of China and the relevant regulations of the working area.

5. After sending the formal technical consultation report to Party A, Party B shall inform Party A of the following contents by telex: the date of sending the report and the mailing number.

6. If the technical consultation report is lost in the mail, Party B will reissue it free of charge immediately after receiving the notice from Party A. ..

Four. Scope of responsibility of Party A:

1. In consideration of the consulting services provided by Party B as stipulated in Articles 2 and 3 of this Agreement, Party A shall pay Party B a total fee of USD (in words).

2. Provide accommodation and transportation for three experts of Party B to work in China.

3. Provide technical data, drawings and technical documents required by the project.

4. Provide translators for working in China.

5. Provide assistance and convenience for experts to apply for entry and exit visas and stay and travel in China.

Verb (abbreviation for verb) payment of expenses

1. The fees of this agreement shall be paid in US dollars.

2. The total amount of this agreement is 25% USD. After the experts sent by Party B arrive in Beijing, Party A will pay Party B through Beijing China Bank and X Commercial Bank within 3 days after receiving the following documents.

A _ One original and one copy of the irrevocable letter of guarantee issued by Beijing Development Co., Ltd. in favor of Party A, with the amount of 25% (USD) of the total amount of the agreement (see Annex 2 to this contract for the format of the letter of guarantee).

One original and five copies of commercial invoice.

3. The total amount of this agreement is 75%, calculated in US dollars. After Party B completes the technical consulting service and submits the formal technical consulting report, Party A will pay Party B through Beijing China Bank and X Commercial Bank after receiving and verifying the following documents no later than.

A. original commercial invoice in sextuplicate.

B. sight draft in duplicate.

C two copies of the postal bill or air waybill for mailing the formal technical consultation report.

6. All bank charges incurred outside China shall be borne by Party B. All bank charges incurred in China shall be borne by Party A. ..

7. Both parties shall keep all information provided by the other party confidential and shall not disclose it to a third party without the written consent of the other party.

Eight. taxes and administrative charges

1. All taxes and fees levied by China government on Party A according to the current tax law shall be paid by Party A. ..

2. All taxes and fees related to the implementation of this Agreement levied by China Government on Party B according to the current Individual Income Tax Law of People's Republic of China (PRC) shall be paid by Party B. ..

3. All taxes and fees levied outside China related to the implementation of this Agreement will be paid by Party B. ..

9. All disputes arising from the execution of this agreement between Party A and Party B shall be settled through friendly negotiation.

X all documents and materials for the implementation of this agreement shall be written in English and metric.

XI。 This Agreement shall come into force after being signed by both parties and approved by the China Municipal Government. This agreement is written in English in duplicate, with each party holding one copy, all of which are equally authentic.

Twelve, two ways to solve

Chinese company

Address:

Telex:

Guo company

Address:

Telex:

Signature of Party A's representative: Party B's signature: China Company.

Article 2 of the model engineering technical service contract

Party A: Project Management Department (representative)

Party B: Engineering Technical Service Group (Representative)

Through friendly negotiation between Party A and Party B, Party A decides that Party B will contract the technical services of the third bid section of Yinzhong Road. Based on the principle of consensus, both parties have reached the following contract terms for their compliance.

I. Overview of the Project

1, project name:

2, section pile number:

3. Content of technical contract: Party B provides technical services such as engineering construction survey, engineering quality inspection, measurement, engineering change and completion data to Party A..

4. The term of the contract is 12 months, the start date of technical service: subject to the notice of commencement issued by the owner, and the completion date of technical service: handover of project completion and completion of completion data. The early completion of the project will not affect the technical contract fee and the implementation of the contract terms.

5. Costs and payment methods of technical contracting:

(1), the technical contract fee 10000 yuan is taken as the total basic salary of the technical team.

(2) Bonus and commission: On the basis of the above total basic salary, Party A shall pay Party B% of the engineering quantity generated by technical means (that is, the unit price in the bid-winning bill of quantities multiplied by the engineering quantity generated after deduction by Party B).

(3) Payment method of technical service fee: three months before the project starts, Party A shall pay Party B the technical service fee of RMB yuan every month, and the payment time is 10. After that, Party B shall pay RMB monthly, and within 30 days after the project is completed and accepted by the intermediary agency, Party B shall pay the total technical service fee in one lump sum, and Party B shall not bear the risk that Party A's project payment cannot be settled in time.

Two. Responsibilities and obligations of both parties

(I) Responsibilities and obligations of Party A

1. Party A is responsible for providing Party B's personnel with office space, accommodation, meals, daily life and office water and electricity, and providing Party B with necessary and sufficient labor protection articles, and the expenses required shall be borne by Party A. ..

2. Party A shall provide Party B with sufficient office equipment, test equipment, measuring equipment and paper and computer consumables.

3. Party A's site management personnel, drivers, construction personnel, materials workers, migrant workers and mechanical teams must obey the technical arrangement of Party B's work. With the consent of Party A, Party B has the right to replace incompetent site management personnel, drivers, construction workers, materials workers and migrant workers. ..

4. Party A is responsible for handling the relationship between foreign owners, regulatory authorities and local farmers, and all expenses incurred shall be borne by Party A. ..

(II) Responsibilities and obligations of Party B

1. Provide technical services for Party A's engineering construction, mainly including engineering survey, measurement, quality inspection and completion acceptance, and actively cooperate with Party A's work according to the requirements of Party A's engineering construction progress.

2. After Party A pays Party B the technical contract fee, Party B shall be responsible for the salaries of all technical personnel of the technical service team, and Party A shall bear all expenses of this project.

3. During the service of Party A, Party B's personnel shall abide by Party A's rules and regulations and actively make suggestions for Party A. If Party B's personnel cause economic losses to Party A, Party B shall bear corresponding responsibilities.

4. According to the requirements of the owner and the supervisor, report all kinds of engineering data in a timely manner in strict accordance with the design and construction specifications.

5. Party B is responsible for assisting Party A in arranging the labor force. Matters not covered herein shall be settled by both parties through friendly negotiation. The above agreement is made in duplicate, with each party holding 1 copy, which shall come into effect after being signed by both parties.

Representative of Party A: _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Representative of Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Engineering technical service labor contract III

Project name:

Project number:

Party A:

Party B:

In accordance with the results of government procurement in Nanning in 2009 and other relevant laws and administrative regulations, both parties have entered into this contract on the principles of equality, voluntariness, fairness and honesty.

I. Contents of the Contract

Party A entrusts Party B to prepare the tender control price (including bill of quantities) of (project name), and the professional category is municipal public works (or construction projects).

Second, the time to submit the tender control price

The time for submitting the tender control price (including the bill of quantities) is within 10 days from the date of signing the contract, that is, from, to, 2009. The submission time should be as early as possible.

Three, the tender control price (including bill of quantities) preparation service fee:

Preparation of tender control price service fee = tender control price approved by the project × "tender agent service fee standard "× 30 %× 30%

(1- Uniform discount rate)

Four. Payment of service fee

Declared by Party B and paid by Party A according to the project.

If the service fee for site establishment calculated at the rate corresponding to the tender control price is less than 1000 yuan, it shall be calculated at 1000 yuan.

Verb (short for verb) Both parties agree.

1. Party B shall not hand over the compilation entrusted by Party A to a third party for completion.

2. Party B shall prepare the bill of quantities in strict accordance with the national standard GB50500-2003 "Code for Valuation of Bill of Quantities for Construction Projects", "Application Guide for Valuation of Bill of Quantities for Construction Projects in Guangxi" and other relevant valuation standards. Atlas nodes shall not be used to describe the project features in the bill of quantities. If there are new regulations in the country, the new regulations shall prevail.

3. After accepting the entrusted task, Party B shall actively contact Party A to implement specific matters and arrange enough personnel to complete the preparatory work within the specified time.

4. Party B shall complete the preparation of the project bidding control price (including the bill of quantities) within the time stipulated in the contract, and submit the project bidding control price (including the bill of quantities) in quintuplicate to Party A, as well as the electronic documents and working papers for calculating the quantities ... If the relevant information provided by Party A is incomplete, the time for Party B to submit the information to Party A shall be postponed accordingly.

5. If it is necessary to adjust the project in the process of compiling the tender control price (including the bill of quantities), Party A shall immediately notify Party B; If Party B finds any problems in the process of compiling, it shall immediately notify Party A. ..

6. If the bidder (bidder) of this project raises questions related to the bill of quantities, Party B must give a written reply within the specified time, and Party A will reply to the bidder (bidder) after sending it to Party A for approval.

7. Party B shall not disclose the compilation contents of the project bidding control price (including the bill of quantities) entrusted by Party A to anyone other than Party A. If Party B's breach of contract is found and verified, Party A has the right to terminate the contract and hold Party B liable for breach of contract.

8. During the validity period of this contract, if Party A thinks that the personnel actually invested by Party B are not enough to meet the needs of staffing tasks or the staffing is not up to the job, it may send a notice to Party B requesting to add or replace (if necessary) personnel, and Party B shall add or replace the corresponding personnel within 5 days after receiving the notice, and the expenses arising therefrom shall be borne by Party B. ..

9. If Party B accepts the bidding control price (including the bill of quantities) of a project entrusted by Party A, it can no longer provide services related to the bidding of this project for the relevant bidders of this project; If Party B's breach of contract is found and verified, Party A has the right to terminate the contract and hold Party B liable for breach of contract.

10. When Party B submits the project bidding control price (including bill of quantities) and bill of quantities calculation to Party A, it must have completed the internal three-level audit procedure. ..

1 1. Other protocols:

(1) If the compilation of the project bidding control price only needs to issue the results of the bill of quantities and the bill of quantities calculation due to the project itself, it will be paid at 60% of the bid price in this project.

(2) The preparation of the tender control price, if the tender control price has been completed and provided, but the material price needs to be adjusted due to market reasons, the preparation service fee will not be counted separately; If the tender control price has been completed and provided, but it needs to be adjusted due to design changes, the difficulty coefficient can be increased by 0. 1 to 0.3 according to the actual situation.

Related articles in the model collection of engineering technical service contracts:

1. Engineering technical service contract template

2. Classic contract of engineering technical service

3.5. Model clauses of technical service contract

4.5 copies of model engineering service contract

5.5 pieces of practical engineering technology contract model

6 excellent technical service contract model daquan

7. The latest mode of engineering service contract

8. Technology Development Service Contract Fan Wenxuan

9. Simple model of technical service contract

10. Technical service contract standard template