Waterproof decoration in Wuhan can not be ignored;
The renovation of new houses is bound to carry out hydropower transformation, which will inevitably destroy the waterproof layer made by the original developers. In order to strengthen waterproof setting, protect property safety and avoid neighborhood disputes, new house decoration must be waterproof.
Judging from the mainstream waterproof materials in the market, waterproof coiled materials are mainly suitable for roofing projects because of their high construction technical requirements, and are not suitable for small-area waterproof construction in families; 9 1 1 polyurethane waterproof coating is difficult to be accepted by families because of its defects such as emitting volatile toxic gases, requiring the base surface to be dry, and not sticking tiles on the surface. JS cement-based waterproof coating is composed of organic polymer liquid and inorganic powder, which combines the advantages of high elasticity of organic materials and good durability of inorganic materials. The waterproof coating with high strength and toughness formed after painting has the advantages of good waterproof performance, aging resistance, crack resistance, environmental protection and convenient construction, and is gradually becoming an ideal choice for family waterproofing.
Waterproofing is not a new topic, whether it is tunnels, bridges, roads, buildings or houses we live in every day, waterproofing can not be ignored.
Key points of waterproof decoration in Wuhan:
First of all, resurfaced floor tiles should be waterproof.
If it is necessary to replace the original floor tile in the bathroom, after the original floor tile is chiseled off, the ground must be leveled with cement mortar first, and then waterproof treatment is carried out to avoid leakage caused by uneven thickness of waterproof coating. Be sure to clean the ground before waterproofing and brush polyurethane waterproof coating for 2 to 3 times.
Second, try not to destroy the original waterproof layer.
The floors of newly delivered buildings, bathrooms, bathrooms and kitchens have waterproof layers made in accordance with relevant specifications. Therefore, under the condition of not destroying the original waterproof layer, there is generally no leakage. At present, the common problem is that some toilet facilities will be added in the decoration, and a variety of water supply and drainage pipes will be rearranged or moved, which has seriously damaged the original waterproof layer of the building. However, the waterproof construction was not repaired or redone, so that the problem was discovered only after leakage occurred.
Three, the water tank on the wall should also be waterproof.
During construction, when pipes and floor drains pass through the floor, the waterproof layer around the holes must be carefully constructed. Water pipes should be buried in the wall and have a reasonable layout. All laid water pipes should be made into grooves with a diameter larger than the pipe diameter, and plastering in the grooves should be smooth, and then polyurethane waterproof coating should be brushed in the grooves.
Four, with 24 hours "water storage test" acceptance of waterproof.
After the waterproof project is completed, seal the door and drain, fill the toilet floor with water to a certain height, and mark it. If the liquid level does not drop significantly within 24 hours, especially if there is no leakage on the roof of the downstairs home, the waterproofing is qualified. If the acceptance is unqualified, the waterproof project must be redone as a whole before it can be re-accepted.