Paragraph 1 of Article 45 of the Urban and Rural Planning Law of People's Republic of China (PRC) "The competent department of urban and rural planning of the local people's government at or above the county level shall, in accordance with the provisions of the State Council, verify whether the construction project meets the planning conditions. If it is not verified or verified that it does not meet the planning conditions, the construction unit shall not organize the completion acceptance. "
Examination and approval conditions:
The construction unit shall complete all the construction contents in accordance with the requirements of the construction project planning permit, approved construction drawings and environmental design. Application materials:
(1) 1 application, applicant's main qualification certification materials, power of attorney and basic information of the project (2) 1 construction project planning permit (original review) 1 drawing general plan (3) construction drawing changes, Need 1 query opinion on planning change of construction project (original review) and 1 attached drawings (4) 1 review opinion on environmental design of construction project (original review) and 1 attached drawings (5) 1 single acceptance opinion (original review) (6)
Go to the local planning bureau for consultation, get a form, and the contents above can be organized for acceptance.