Compensation standard for demolition and resettlement of villages in Hangzhou

If government construction needs demolition, of course, compensation for demolition can be obtained. Under normal circumstances, the relevant government departments will issue a written notice six months ago and send people to the site to do work for the houses within the scope of demolition. The government department responsible for the demolition work is the local demolition office. If you have any questions or problems, you can consult the demolition office to solve them.

The annex is "Compensation Measures for House Demolition of Collectively Owned Land in Hangzhou"

These measures are formulated in order to standardize the assessment of the demolition of houses with collectively owned land in Hangzhou (excluding Xiaoshan District and Yuhang District) and reasonably determine the compensation prices of various houses, combined with the actual situation of our city.

First, the total compensation for house demolition consists of the compensation for house, the compensation for house decoration and the compensation for attachments.

Two, housing (including the main room, annex), courtyard, tunnel area, according to the demolition of legitimate ownership documents to determine. If the relevant area is not recorded in the certificate of ownership source, or the person being demolished fails to provide the certificate of ownership source within the prescribed time limit, it shall be decided by the original examination and approval authority or other authorities with the power of examination and approval according to law.

Three, the amount of housing compensation is the product of the total score of housing compensation and the score. The total score of housing compensation is based on the housing sub-compensation, adjusted by the main housing sub-projects, and calculated by combining the housing compensation area with the new one.

The housing compensation amount divided by the housing compensation area is the housing replacement price.

Four, the amount of compensation for house decoration is the product of the total score and the compensation score for house decoration. The total score of house decoration compensation is calculated based on the benchmark of house decoration compensation, adjusted in the decoration process and combined with the compensation area of the house.

Five, the amount of seizure compensation is the product of the total score of seizure compensation and the score. The total compensation score of the above-ground attachments is calculated by combining the benchmark compensation score of the above-ground attachments with the corresponding land area.

Six, the above compensation score is 100 yuan/minute. In the future, according to the economic development level of our city, the municipal land administrative department shall report to the municipal government for timely adjustment.

Seven, the replacement price of new houses (settlement price), according to the relevant provisions of the municipal government.

Eight, in order to encourage the demolition to sign the contract in advance and vacate the house, the demolition can be rewarded. Before the demolition, the reward conditions and standards should be clearly defined and reported to the district government for the record.

Nine, Xiaoshan District, Yuhang District and five counties (cities) can be implemented with reference to these measures.

X. These Measures shall be implemented as of April 1 day, 2009.

Attachment 1 Rating Scale for Housing Compensation

(a) residential housing breakdown score table.

Project nameNo. Salary benchmark score (min /M2) depreciation rate under specific conditions

main reinforcement

specific

Structure 1- 1 9 1. Foundation, column, beam, roof, floor slab, floor slab and roof are all reinforced concrete (full frame).

2. It is all reinforced concrete bearing, and the wall has no bearing function.

3. Reinforced concrete walls or brick infilled walls. 0.5%/ year

brick setting

Structure 1-2 7 1. Reinforced concrete foundation or masonry foundation.

2. Reinforced concrete columns or brick columns.

3. Beams, roofs, floors and floors are all reinforced concrete.

4. The walls, columns and beams bear the same load.

5. Brick walls. 0.75%/ year

Brick wood

Structure 1-3 4 1. Masonry foundation.

2. Wooden frames and beams; Brick columns and brick walls (ordinary bricks); Wooden stairs; tile roof

3. Brick walls and brick columns bear loads.

4. Brick wall or batten wall. 1%/ year

Wood structure 1-4 3.5 1. Wooden frames, beams, columns and walls; Wooden stairs; tile roof

2. Cylindrical bearing.

3. Flat wall. 1%/ year

simple and easy to do

mix

Structure 1-5 2.5 1. Low-standard reinforced concrete roof or wooden roof truss, bamboo roof truss and tile roof.

This wall is load-bearing.

3. Brick walls or mud walls such as homemade bricks, cinder bricks and miscellaneous bricks. 1.25%/ year

Door solid wood door 1-6 0.8 high-grade solid wood door or high-grade anti-theft steel door (including door cover and screen door). By house

Calculation of major depreciation rate

Solid wood door 1-7 0.5 multi-layer solid wood door or plastic steel door, aluminum alloy door, common anti-theft steel door (including door cover and screen door).

Empty doors 1-8 0.25 plywood empty doors and wooden doors (including door covers and screen doors).

Window plastic-steel window 1-9 0.5 Various plastic-steel windows (including window covers, curtain boxes, curtain rails and screens).

Aluminum alloy windows1-10.4 Various aluminum alloy windows (including window covers, curtain boxes, curtain rails and screens).

Steel and wood windows 1- 1 1.25 All kinds of steel or wood windows (including window covers, curtain boxes, curtain rails and screens).

Cast-in-place reinforced concrete on the floor

Floor slab 1- 12 1 cast-in-place reinforced concrete floor slab. By house

Calculation of major depreciation rate

steel reinforced concrete

Floor slab 1- 13 0.9 precast floor slab.

Ordinary wooden floor 1- 14 0.85 with wooden joists and flat floor.

Cement floor 1- 15 0.4 concrete and brick cushion, fine stone concrete surface.

Water and electricity facilities are good 1- 16 1, water and electricity, water pipes, faucets, dark wires and cables are complete, switches are good, and sockets are good.

General water and electricity facilities 1- 17 0.7 have complete water and electricity, including wires, cables, master switches and master sockets.

(two) the main items of residential housing adjustment scale.

Adjust project compilation

Number adjustment content compensation sub-adjustment and condition

reinforcing steel bar

specific

2- 1 floor-to-floor building, add 0.8 points for the main item of the building (per square meter, the same below); For the second-floor house, add 1.6 points to the main item of the house; For houses with three or more floors, add 2.4 points to the main item of the house.

2-2 Foundation Pile Cap Foundation, the main item of the house is increased by 1.5 points.

2-3 layers of brick-concrete structure, 0.6 points for the main building project; For the second-floor house, add 1.2 points to the main item of the house; For houses with three or more floors, the main item of the house will be added with 1.8 points.

2-4 Reinforced concrete foundation with foundation cap, and the main item of the house is increased by 1.5 points.

For reinforced concrete strip foundation, the main item of the building is increased by 1 min.

Column-supported reinforced concrete ring beam foundation, the main components of the building increased by 1 min.

Reinforced concrete ring beam foundation, the main components of the house increased by 0.8 points.

Brick-wood structure 2-5-story roof truss, thin thick wood roof truss (more than 25 cm in diameter) or reinforced concrete herringbone roof truss, the main item of the house will be increased by 0.6 points.

2-6 columns are loaded with thin thick wood (more than 25 cm in diameter), and the main part of the house is increased by 0.6 points.

2-7 foundation reinforced concrete ring beam foundation, the main item of the house is increased by 0.6 points.

Wood structure 2-8 roof truss adopts superior thick wood (more than 25 cm in diameter), and the main item of the house is increased by 0.6 points.

2-9 columns are loaded with thin thick wood (more than 25 cm in diameter), and the main part of the house is increased by 0.6 points.

Simple mixing

Structure 2- 10 foundation reinforced concrete ring beam foundation, the main component of the house increased by 0.6 points.

(3) Calculation method of compensation amount for residential houses.

1. Housing compensation amount = total score of housing compensation × score.

2. Total score of compensation for residential housing = (main sub-item compensation benchmark score+door weighted average compensation score+window weighted average compensation score+floor weighted average compensation benchmark score+main sub-item adjustment score) ×× compensation area of residential housing× new housing.

Where: (1) weighted average compensation score of gates = ∑ (number of gates × compensation reference score of sub-gates)/total number of gates;

(2) weighted average compensation score of windows = ∑ (number of windows × partial compensation benchmark score of windows)/total number of windows;

(3) Floor weighted average compensation score = ∑ (number of floors × floor partial compensation benchmark score)/total number of floors;

(4) new buildings = 1- depreciation rate × (construction time -2 years) (construction time > 2).

The construction time is calculated from the second year after the approval of the building.

If the building is less than two years old and in good condition, it can be evaluated as new. No less than 80% of the houses are new.

Houses that have changed their structural categories after being overhauled with the approval of the competent authorities shall be assessed as new according to the changed structural categories, and the date of overhaul shall be regarded as the date of completion.

(4) Sub-item scoring table for non-residential houses.

Category number salary benchmark score

(Minimum /M2) Adjustment of salary benchmark and conditional depreciation rate

reinforced concrete structure

House 3- 1 10 is calculated according to the construction area. For houses with more than two floors (including two floors), the actual level will increase by 0. 1 minute/square meter for each additional floor.

The fractional line for commercial comprehensive non-residential buildings is 12, as in level modulation. 0.5%/ year

Brick-concrete structure houses with 3-2 buildings and 8 buildings are calculated according to the construction area. For houses with more than two floors (including two floors), the actual level will increase by 0. 1 minute/square meter for each additional floor.

The fractional line for commercial comprehensive non-residential buildings is 10, as in level modulation. 0.75%/ year

Steel structure

Workshop 3-3-6 is calculated according to the construction area. For houses with more than two floors (including two floors), the actual level will increase by 0. 1 minute/square meter for each additional floor.

If the floor height is 6 meters or more, score 7 points. 0.75%/ year

Brick-wood structure (or other structures) houses with 3-4 buildings are calculated according to the construction area. For houses with more than two floors (including two floors), the actual level will increase by 0. 1 minute/square meter for each additional floor.

The commercial comprehensive non-residential score is 6, and level modulation is the same as above. 1%/ year

(V) Calculation method of compensation points for non-residential houses.

1. Compensation amount for non-residential houses = total compensation score for non-residential houses × points.

2. Total score of non-residential housing compensation = (non-residential housing compensation benchmark score+main sub-item adjustment score) ×× compensation area of non-residential housing× new housing.

3. Newly built houses = 1- depreciation rate × (construction time -2 years) (construction time > 2).

The construction time is calculated from the second year after the approval of the building.

If the building is less than two years old and in good condition, it can be evaluated as new. No less than 80% of the houses are new.

Houses that have changed their structural categories after being overhauled with the approval of the competent authorities shall be assessed as new according to the changed structural categories, and the date of overhaul shall be regarded as the date of completion.

Annex 2 Rating Scale for Housing Decoration Compensation

(1) Rating Scale for House Decoration.

The subject number specifically requires compensation for the benchmark score.

(min /M2)

Decoration and facilities (residential) 4- 1 1. Interior decoration is above the ceiling, above the retaining wall with three plywood on the interior wall, above the floor composite floor or polished tiles.

2. Outdoor decoration roofs have mid-range roofs (small blue tiles, corrugated tiles) guardrails, etc. And the exterior wall has middle-grade wall tiles (imitation stone, antique brick, glazed tile, etc. ).

3. Facilities include complete sanitary ware, sewage treatment system, fixed telephone, pipeline gas, broadband network, cable TV, water and electricity for one household, solar water heater, air conditioner, etc. 10

Decoration and facilities

(Non-residential) 4-2 According to the decoration quota, complete sets of decoration shall be unified. six

Note: Fixed telephone, pipeline gas, broadband network, cable TV, one meter per household, solar water heater, air conditioner and other facilities shall be paid separately according to the relevant regulations of the industry.

(two) the housing renovation process adjustment score table.

The grade number specifically requires an adjustment factor.

First-class 5- 1 all meet the specific requirements of decoration scoring. According to the decoration budget quota, the decoration company completed the decoration according to the drawings, with exquisite craftsmanship and novel and high-grade decoration materials. 120%

The second-class 5-2 basically meets the specific requirements of the decoration score, and it is not completely decorated. It is decorated according to normal technology and construction procedures, and the decoration materials are better. 100%

The third-class 5-3 parts meet the specific requirements of decoration scoring. 80%

(3) Calculation method of compensation amount for house decoration.

1. Compensation amount for house decoration = total compensation score for house decoration × score.

2. Total score of house decoration compensation = weighted average score of ground decoration compensation × housing compensation area, in which:

Weighted average score of floor decoration compensation = ∑ decoration benchmark score × adjustment coefficient of each floor/level.

Annex 3

Appendix salary scale

(1) Appendix Scoring Table.

Classification number. Salary benchmark score for specific project (minimum /M2)

Residential courtyard 6- 1 includes garden facilities, stalagmites, rockeries, ponds, bridges, lawns, fruit trees, trees, seedlings, flowers and trees, bamboos, hedgerows, wells, floors, fences, yards and other ground attachments. nine

Non-residential courtyard (enterprise) 6-2 includes garden facilities, stalagmites, rockeries, ponds, bridges, floors, lawns, trees, fences, gates and other ground attachments. three

The residential tunnel with 6-3 floors contains stalagmites, rockeries, ponds, bridges, floors and other ground appendages. three

(two) the calculation method of the amount of compensation for appendages.

1. Compensation amount of residential courtyard appendages = total compensation score of residential courtyard appendages × score, in which:

Total score of appendages compensation in residential courtyard = benchmark score of appendages compensation × (approved homestead area-construction area).

2 non residential courtyard appendages compensation amount = non residential courtyard appendages compensation total score x score, of which:

Total score of appendages compensation for non-residential courtyards = benchmark score of appendages compensation × (approved land area-construction area).

3 residential tunnel ground appendages compensation amount = tunnel ground appendages total compensation score x score, including:

Total score of tunnel appendage compensation = benchmark score of appendage compensation × tunnel land area.