Linghe Expressway starts from Yimaling, Lingqiu, Datong City in the east (connected with Laiyuan, Hebei Province) and passes through Fan Shi, Daixian, Yuanping, Ningwu, Shenchi, Wuzhai and Pianguan Dahequ (connected with Zhungeer Banner, Inner Mongolia) in Xinzhou City, with a total length of 288 kilometers, including 275 kilometers in Xinzhou City, with an investment of about 7.3 billion yuan.
Lingqiu Yimaling to Hunyuan Wangzhuangbao Section
This section is connected with G 18 Wurong expressway. It's already open to traffic.
Hunyuan Wangzhuangbao to Fan Shi Section
This section was officially opened to traffic with the S45 Tian Li Expressway * * * line of Tianjin Expressway, 2013165438+1October 9.
Fan Shi to Daying section
Fan Shi to Daying expressway starts from the south of Lougang Village in Fan Shi and ends at the south of Madigou Village in Yuanping City, with a total length of 59.847km. This section of expressway was officially opened to traffic on 20141191October 65438.
Daying-Shenchi section
Daying to Shenchi expressway starts from Madigou Village, Yangou Township, Yuanping City and ends at Donghu Village, Donghu Township, Shenchi County. The total length of the route is 64.76 kilometers, and the expressway standard of totally enclosed, fully interconnected, two-way and four-lane is adopted. The design speed is 80 kilometers per hour and the subgrade width is 24.5 meters. It is expected to be completed on 20 15 and 10.
Shenchi-Hequ section
Shenchi to Hequ expressway, with a total length of 99 kilometers, starts from the northwest of Donghu Township, Shenchi County, Xinzhou City, and connects with expressway Daying to Shenchi and Shuozhou to Kelan in the west. The southwest enters Wuzhai County via Zhuangzi, Yijing Town, Guojiazhuang, Daheizhuang and Xiahuayuan, and reaches Liujiazhuang in Pianguan County via Zhangjiaping, Liujiagetai and Wang Jiaping. The entire Shenhe Expressway is equipped with six interchanges, namely East Lake Hub, Shenchi West Interchange, Sancha Interchange, Liuzhaigou Interchange, Pianguan Interchange and Hequ Interchange, 1 management sub-center, 2 maintenance work areas, 2 Shenchi service areas and Hequ service areas, 1 Wuzhai parking area, 5 interchange toll stations and 5 connecting lines: Shenchi West Interchange Connecting Line/. Shenhe Expressway is built according to the four-lane expressway standard, with an estimated investment of 7.607 billion yuan. This section of expressway was officially opened to traffic on September 25, 20 14.
major function
Linghe Expressway runs through the economic artery line in the north-central part of Xinzhou, which is eight counties (cities) in Xinzhou City. It is also the main channel for transporting coal from Yulin City of Shaanxi Province and Erdos City of Inner Mongolia Autonomous Region to Beijing, Tianjin and Hebei.
The above is the introduction of Zhong Da Consulting to Linghe Expressway. For more information about expressways, please pay attention to the architectural knowledge column of Zhong Da Consulting.