The total length of the route of this project is 6 1.465km (the main line in Yongren County is 29.245km long and the main line in Dayao County is 32.22km long). It is built according to the design standard of two-way four-lane expressway, with a speed of 80km/h and a roadbed width of 25.50m The total investment of this project is 8.23 billion yuan, and the average cost per kilometer is about 65.438+34 billion yuan.
On rainy days, the road is slippery and the line of sight is blocked, and the speed will slow down, but your speed should not be too low. On the one hand, it may be photographed when the speed is lower than the minimum speed requirement of a certain section.
Although it is a special case of rainy days, the traffic control department may be lenient, but it may not be completely ignored. On the other hand, if your speed is too low, it will also affect the normal driving of the vehicles behind you, and it will easily lead to rear-end collision if you are not careful.
In addition, when driving in rainy days, try to drive in the middle of the road, not along the side of the road, to prevent scratching, bumping and hitting the guardrail, to avoid colliding with vehicles parked on the side of the road in an emergency, and there is less water in the middle lane.