What does the comprehensive knowledge of information system project management division test?

Project management division, information system, belongs to the advanced qualification examination of soft test. Project management division comprehensive knowledge subjects, information system, morning exam. The test questions are objective multiple-choice questions, with a full score of 75. The examination time is 9:00- 1 1:30.

Project management division morning exam for advanced information system is comprehensive knowledge, with a full score of 75, and the questions are objective multiple-choice questions. According to the project management division Examination Outline of Information System, the examination scope of comprehensive knowledge subjects is as follows:

1. Informatization and information system;

1. 1 information system and its technology and development method;

1. 1. 1 information system foundation;

The meaning, characteristics or attributes of information and information systems;

The goal and composition of the information system;

Information system life cycle model;

1. 1.2 design and development method of information system;

1. 1.3 general information system integration technology;

Computer network technology (standards and protocols, network equipment, network access, network design and planning, performance indicators);

Server technology (architecture, performance indicators);

Storage technology;

Database technology (database management system, data warehouse);

Middleware technology;

High availability and high reliability planning and design;

1. 1.4 software engineering;

Software engineering and its life cycle;

Software architecture (definition, model, analysis and evaluation);

Object-oriented analysis, design and development;

Process management of software engineering;

Software configuration management;

Quality management and evaluation of software;

Software testing and evaluation;

Software integration technology and management;

1. 1.5 new generation information technology;

Internet of things;

Cloud computing;

Big data;

Mobile internet;

Large information system;

1.2 information system security technology;

1.2. 1 information security foundation;

Related concepts of information security;

Information encryption, decryption and common algorithms 1.2.2 information system security;

The technology, equipment, facilities, tools and methods of general information system security management;

1.3 information development and application;

1.3. 1 New features of information development and application;

1.3.2 information development strategy;

Regional informatization;

Domain informatization;

1.3.3 e-government;

1.3.4 e-commerce;

1.3.5 integration of industry and informatization;

1.3.6 intelligence;

1.4 information system service management;

1.4. 1 information system service industry and its development;

1.4.2 the concept and development of information system engineering supervision;

1.4.3 the concept and development of information system operation and maintenance;

1.4.4 standards and framework for information technology service management;

1.5 information system planning;

1.5. 1 large information system;

1.5.2 information system planning process;

1.5.3 information system planning tool;

1.6 enterprise chief information officer and his responsibilities;

2. Foundation of information system project management;

2. 1 theoretical basis and system of project management;

2. 1. 1 project management basis;

2. 1.2 Composition of project management knowledge system;

2. 1.3IPMP/PMP? ;

2. 1.4PRINCE2? ;

Definition and structure;

Principle;

Theme;

Process;

Tools;

2. 1.5 project management maturity model;

2. 1.6 quantification of project management;

2.2 The influence of organizational structure on the project;

2.3 Typical life cycle model of information system project;

Waterfall model;

V type;

Prototype model;

Spiral model;

Iterative model;

Agile development mode;

2.4 the management process of a single project;

3. Project management;

3. 1 project management content;

3.2 Feasibility study;

3.3 Project evaluation and demonstration;

4. Overall project management;

4. 1 Significance and role of overall project management;

4.2 Overall project management process;

4.2. 1 Formulate the articles of association of the project;

4.2.2 Prepare the project management plan;

4.2.3 Guide and manage the project work;

4.2.4 Monitoring project work;

4.2.5 Overall change control of the project;

4.2.6 Ending the project or stage;

4.3 Technologies and tools for overall project management;

5. Project scope management;

5. 1 The meaning and function of project scope management;

5.2 Project scope management process;

5.2. 1 planning scope management;

5.2.2 Collect requirements;

5.2.3 Definition scope;

5.2.4 Create a work breakdown structure; ;

Scope of confirmation;

5.2.6 Control range;

5.3 Techniques and tools for project scope management;

6. Project schedule management;

6. 1 Significance and function of project schedule management;

6.2 Project schedule management process;

6.2. 1 schedule management;

6.2.2 Define activities;

6.2.3 Arrange the sequence of activities;

6.2.4 Estimate the activity resources;

6.2.5 Estimate the duration of the activity;

6.2.6 Make a progress plan;

Control the progress;

6.3 Techniques and tools for project schedule management;

7. Project cost management;

7. 1 project cost and cost management basis;

7.2 Project cost management process;

7.2. 1 planned cost management;

7.2.2 Estimate the cost;

7.2.3 Make a budget;

7.2.4 Control costs;

7.3 Techniques and tools for project cost management;

8. Project quality management;

8. 1 quality management basis;

8.2 Project quality management process;

8.2. 1 Planning quality management;

8.2.2 Implement quality assurance;

8.2.3 Quality control;

8.3 Techniques and tools for project quality management;

9. Project human resource management;

9. 1 Project human resource management foundation;

9.2 Project human resource management process;

9.2. 1 Planning human resource management;

9.2.2 Establish a project team;

9.2.3 Construction project team;

9.2.4 Manage the project team;

9.3 Techniques and tools for project human resource management;

10. Project communication management and stakeholder management;

10. 1 project communication management basis;

10.2 project communication management process;

10.2. 1 planning communication management;

10.2.2 management communication;

10.2.3 control communication;

10.3 project communication management technology and tools;

10.4 Project Stakeholder Management Foundation;

Project stakeholder management process;

10.5. 1 Identify stakeholders;

10.5.2 planning stakeholder management;

10.5.3 participation of management stakeholders;

10.5.4 control the participation of stakeholders;

10.6 technologies and tools for project stakeholder management;

1 1. Project risk management;

1 1. 1 risk and project risk management basis;

1 1.2 project risk management process;

1 1.2. 1 planning risk management;

1 1.2.2 Identify risks;

1 1.2.3 Implement qualitative risk analysis;

1 1.2.4 Implement quantitative risk analysis;

1 1.2.5 Plan risk response;

1 1.2.6 Monitoring risks;

1 1.3 project risk management technology and tools;

12. Project procurement management;

12. 1 procurement management basis;

12.2 procurement management process;

12.2. 1 planning and procurement management;

12.2.2 Implement procurement;

12.2.3 control procurement;

12.2.4 terminal procurement;

Techniques and tools for purchasing management;

12.4 bidding methods and procedures;

13. Project contract management;

13. 1 contract management basis;

13.2 contract management process;

13.2. 1 signing;

13.2.2 Contract performance;

13.2.3 contract management;

Archives management;

Claim management;

Default management;

13.2.4 Contract liquidation;

13.3 contract management technology and tools;

14. Information document management, configuration management and knowledge management;

14. 1 Information system project related information documents and their management;

14.2 configuration management foundation;

14.3 knowledge management foundation;

15. Project change management;

15. 1 Change management roles and responsibilities;

15.2 work procedures for change management;

15.3 the relationship between project change management and other management elements;

16. Strategic management;

16. 1 Organizational strategic management;

16. 1. 1 strategy and strategic management;

16. 1.2 main contents of organizational strategy;

16. 1.3 policy implementation process decomposition;

16. 1.4 policy monitoring;

16.10.5 strategic assessment;

16.2 types and levels of organizational strategy;

16.2. 1 organizational strategy type;

16.2.2 organizational strategy;

16.2.3 decomposition of organizational strategic objectives;

16.2.4 organizational strategy and project management;

17. Organization level project management;

17. 1 Overview of organization-level project management;

17.2 content of organization-level project management;

17.3 project process management at the organizational level;

17.4 organizational level project management maturity model;

17.5 organization-level project management process system design;

17.6 organization-level project management information system (PMIS);

18. Process management;

18. 1 process management basis;

18.2 process analysis, design, implementation and evaluation;

18.3 process transformation and improvement;

18.4 management and optimization of project management process;

19. Project (large-scale project) management;

19. 1 program management basis;

19. 1. 1 program management standard;

19. 1.2 Definition of related roles in the program;

19.10.3 the role of the project manager and his knowledge and skills;

19.2 program and strategic consistency;

19.2. 1 Consistency between plan and organizational strategy;

Business demonstration of the project set;

Program plan;

19.2.2 program circuit diagram;

19.2.3 environmental assessment;

Business environment factors;

Environmental analysis;

19.3 project life cycle and revenue management;

19.3. 1 program life cycle;

Project set definition stage;

Project setting income delivery stage;

The end stage of the project set;

19.3.2 program revenue management;

Identification of project set income;

Analysis and planning of project aggregate income;

Project collection delivery;

Deliver the project set income;

Maintenance of project set income;

19.4 project stakeholder management;

19.4. 1 identification of planned stakeholders;

19.4.2 Prepare the project stakeholder management plan;

19.4.3 Stakeholders in management projects;

19.4.4 monitoring project stakeholders;

19.5 project management;

19.5. 1 Project Management Committee and its responsibilities;

Project governance and organizational vision;

Approval, signing and start-up of the plan;

Project collective financing;

Establish a project governance plan;

Communicate and sign the success criteria of the project;

Approve the project method and plan;

Program performance support;

Plan reporting and control;

Start handing over and closing program components;

19.5.2 Plan component governance and other support activities;

Project set component governance;

Project set information system;

Project set knowledge management;

Project management audit support;

19.6 project management support process;

19.6. 1 integrated management of programs;

19.6.2 project communication management;

19.6.3 project financial management;

19.6.4 project procurement management;

19.6.5 project quality management;

19.6.6 program scope management;

19.6.7 program resource management;

19.6.8 project risk management;

19.6.9 project schedule management;

20. Project portfolio management;

20. 1 foundation of project portfolio management;

20. 1. 1 project portfolio management concept;

The relationship between project portfolio management and organizational governance;

Project portfolio management module;

Portfolio management office and portfolio manager role;

Project portfolio management process cycle;

20. 1.2 project portfolio management process group;

Define a process group;

Adjustment process group;

Authorization and control process group;

20. 1.3 Interaction in the process of portfolio management;

Joint input and output;

Key deliverables in the whole project portfolio process;

20.2 Project portfolio management;

20.2. 1 Formulate the project portfolio management plan;

20.2.2 Define the project portfolio;

20.2.3 Optimize the project portfolio;

20.2.4 Authorized project portfolio;

20.2.5 stipulate the supervision of the project portfolio;

20.3 Project portfolio performance management;

20.3. 1 Formulate the performance management plan of the project portfolio;

Managing supply and demand;

20.3.3 Management portfolio value;

20.4 Project portfolio risk management;

20.4. 1 Develop the project portfolio risk management plan;

20.4.2 Manage the project portfolio risk;

2 1. Project Management Office;

2 1. 1, only sum category;

2 1.2 responsibilities of project management department in organizing PNO;

2 1.3 organization-level project management office;

2 1.4 planning and planning management office;

22. Information system security management;

22. 1 information system security policy;

22. 1. 1 the concept and content of information system security policy;

22. 1.2 Relationships to be handled when establishing security policies;

22. 1.3 design principles of information system security policy;

22. 1.4 information security level protection;

22.2 Information security system engineering;

22.2. 1 information security system engineering overview;

22.2.2 Information security system;

22.2.3 Information security system architecture;

22.2.4 Information security system engineering foundation;

22.2.5 Information security system engineering architecture;

ISSE-CMM foundation;

ISSE process;

ISSE architecture;

22.3 public key infrastructure;

22.3. 1 public key infrastructure (PKI);

22.3.2 Digital certificate and its life cycle;

22.3.3 Newcomer mode;

22.3.4 Application mode;

22.4PMI Authority (Authorization) Management Foundation;

22.4. 1 PMI authority (authorization) to manage infrastructure;

22.4.2 Difference between PMI and PKI;

22.4.3 Definition of attribute certificate;

22.4.4 Access control;

22.4.5 PMI support system;

22.4.6 PMI implementation;

22.5 information security audit;

22.5. 1 safety upgrade concept;

22.5.2 Establish a safety audit system;

Network and host information monitoring and auditing based on intrusion detection and early warning system;

Audit of the operation of important application systems 22.5.3 Distributed audit system;

23. Knowledge management;

23. 1 the concept of knowledge and knowledge management;

23.2 Common methods and tools of knowledge management;

23.3 intellectual property protection;

24. Laws, regulations and standards;

24. 1 law;

24. 1. 1 contract law;

24. 1.2 bidding method;

24. 1.3 Copyright Law;

24. 1.4 government procurement law;

24.2 standards;

24.2. 1 basic standards;

Information technology software engineering terminology GB/T11457-2006;

GB/T 1526- 1989 File editing symbols and conventions for data flow diagram, program flow diagram, system flow diagram, program network diagram and system resource diagram of information processing;

Information processing system computer system configuration diagram symbols and conventions GB/T14085-1993;

Guide to Software Engineering Knowledge System GB/Z 31102-2014;

24.2.2 Life cycle management standards;

Information technology software life cycle process GB/T 8566-2007;

System engineering system life cycle process GB/T 22032-2008;

System and software engineering software engineering environmental service GB/T 30972-2014;

Computer software reliability and maintainability management GB/T 14394-2008 24.2.3 Documented standard;

The administrator's requirements for user documentation of system and software engineering are GB/T16680-2015;

Computer software document specification GB/T 8567-2006;

Specification for Computer Software Requirements GB/T 9385-2008;

Code for writing computer software test files GB/T 9386-2008;

24.2.4 Quality and test standards;

Software engineering product evaluation part 1: Overview GB/T18905.1-2002;

Evaluation of Software Engineering Products Part 2: Planning and Management GB/T18905.2-2002;

Evaluation of Software Engineering Products Part 3: Developer's Process GB/T18905.3-2002;

Evaluation of Software Engineering Products Part 4: Process Used by Demand Side GB/T18905.4-2002;

Evaluation of software engineering products Part 5: Process used by evaluators GB/T18905.5-2002;

Evaluation of software engineering products Part 6: Evaluation module file GB/T18905.6-2002;

Software engineering product quality Part 2: External measurement GB/T16260.2-2006;

Software engineering product quality Part 3: Internal measurement GB/T16260.3-2006;

Software engineering product quality Part 4: Measurement of service quality GB/T16260.4-2006;

25. Basic knowledge of management;

25. 1 Basic knowledge of mathematical modeling;

25.2 Basic knowledge of data analysis and processing;

25.3 Basic methods of operational research;

25.4 The application of mathematics in economic management;

25.5 Basic knowledge of system management;

26. Professional English;

26. 1 Have the English reading level required by senior engineers;

26.2 Master English vocabulary in this field;

27 information system project management division professional ethics.

Tips: Due to the constant change and adjustment of examination policies and contents, the above information provided by Hunting Examination Network is for reference only. If you have any objection, please refer to the contents published by the authoritative department!

Here are the free review materials: 2023 system analyst preparation knowledge collection.

Format: DO size:11189.97kb, the second phase of project management division information system model test paper in the second half of 2022 (case analysis).

Format: DO size: 2964.28KB

If you have questions about the qualification examination, don't know how to summarize the contents of the test center, and don't know the local registration policy, click on the bottom to consult the hunting test network and get the review materials for free.