On the summary of completion acceptance

Writing the final acceptance summary is a test of our self-working ability. Do you know how to write the final acceptance summary? The following are the reference materials of three model essays on completion acceptance summary for your reference. You are welcome to read them.

Model essay summary of completion acceptance 1 1. Project overview

1, engineering structure:

2. Building area:

3. Investment scale:

4. Start time

5. Completion time

Second, the construction quality

In the process of engineering construction, the project department has implemented a strict system of raw material sampling, sampling inspection, inspection and inspection, and all double-control materials are double-controlled. All incoming raw materials are put into use after being accepted by the supervisor, the construction unit and the construction unit. In terms of construction quality, the project department has established a project quality assurance system. Prepare special construction plans for important sub-items and submit them to the supervisor for approval. During the construction, the inspection shall be carried out in strict accordance with the quality acceptance standards of each sub-item, and a three-level quality inspection and acceptance system of team self-inspection, mutual inspection and handover inspection shall be implemented. Construction data should be synchronized with the construction progress, and the arrangement should be complete and true. During the construction period, the terms of the contract shall be carefully performed without breach of contract. Safety: Safety facilities and protective articles are complete, safety management system is perfect, safety measures are put in place, and no major or minor safety accidents have occurred during the whole construction process. Civilized construction: The construction unit controls the construction time and dust pollution at night to ensure that the construction will not disturb the people and there will be no complaints.

Three. Division acceptance: the main body, decoration, roof, electrical installation, water supply and drainage of this project have been divided into several divisions, and how many sub-items and inspection lots have been inspected. How many batches of materials used in the project have been inspected? What is the comprehensive evaluation of visual quality? Okay? After verification, it meets the construction specifications and is qualified.

Final acceptance summary model essay 2 leaders:

Thank you for coming to participate in the energy-saving pre-acceptance of the self-use office building project of Shangye Machinery Factory in Beibei District of Chongqing.

The project completed all the construction procedures and started construction in xx month of 20xx, and all the construction parties fulfilled the contract well.

Organize the blue prints.the design when the project starts, approve and issue the engineering changes and negotiations proposed by the construction unit during the construction period; Quality management: conformity? Quality first? Quality management principle, in terms of safety work, we earnestly study the laws, regulations and rules on safety production promulgated by government departments at all levels, and implement the responsibility system for safety production and safety supervision and management. In terms of construction funds, our unit raises funds through various channels to ensure that the project funds are in place.

We insist on strengthening the comprehensive supervision and management of construction units. Friendly neighborhood, harmonious public security. Here, on behalf of the construction unit, I would like to congratulate the construction unit on its safety and smoothness in the whole project construction, meeting the design requirements and completion acceptance specifications.

We would like to express our heartfelt thanks to the quality supervision, design, geological exploration, supervision, construction and other units that have given us great support during the construction process! Everyone has worked hard! !

Thank you!

Xx,XX,XX,XX,XX

Final acceptance summary model essay 3 Hello, experts and leaders:

The comprehensive office building project of Longhui Steel Plant was undertaken by Huihui Design Company, Beijing Cyrus International Engineering Consulting Co., Ltd. and Qinhuangdao Elite Decoration Engineering Co., Ltd. Now the construction situation is reported as follows:

I. Overview of the Project

This project has a building area of 7600m2 and a five-story brick-concrete structure. The total height of the six floors above ground is 19.80m, and each floor is 3m. The first floor is mainly latex paint and floor tile, the first floor is mainly stone and latex paint, the second floor is mainly stone and latex paint, the third floor is mainly floor tile and paint, and the fourth floor is mainly latex paint.

This project started in 20xx, in which four floors above ground were completed in 20xx, a floor was completed in 20xx, pre-acceptance was completed in 20xx, and acceptance was completed in 20xx.

Second, the construction process quality assurance measures and control situation

1. In order to ensure the quality of the project, all teams and groups from the company to the project department attach great importance to it during the construction process. First, determine the quality control objectives of the project. From the company to the project department, from the project department to the construction team, quality assurance is always carried out in a planned, organized and step-by-step manner.

2, the implementation of target management, establish the corresponding target responsibility system, the project department quality target decomposition, refinement for subentry project quality target, finally implemented to the team and every operator. Make the project have a clear quality goal and carry out strict management to urge the construction personnel to work towards the goal.

3, standardize the construction behavior. To achieve the quality goal, it is necessary to standardize the construction behavior of construction personnel, and the project department mainly adopts the following measures to achieve it.

1) Implement national standards and enterprise quality documents, so as to make construction activities procedural and standardized.

2) Prepare the construction organization design and special roof construction scheme, and make written technical disclosure for each subdivisional work. Guide the construction work.

3) Organize drawing disclosure, specification disclosure, quality inspection and evaluation standard disclosure and safety technical disclosure, so that the personnel engaged in construction know what to do and how to do it, and meet the standards and requirements.

4) do a good job? Three inspections? Through self-inspection, mutual inspection and handover inspection, the quality problems in the construction process can be found and eliminated in time, and the construction quality of each working procedure can be ensured and passed? Three inspections? Constantly improve their own construction behavior to meet the specifications and design requirements.

5) Strengthen inspection and supervision, strengthen full-time quality inspection and evaluation, implement quality rewards, reward the superior and punish the inferior, and strive to urge the construction personnel to work in the direction of technological progress and superior quality, and constantly improve the overall quality and quality awareness of the construction team.

4, assault key, pays special attention to the quality management of subdivisional work (process), in the whole process of construction, the project department to strengthen the incoming inspection and test of raw materials.

Each batch of raw materials comes into play, and the quality controller and the supervisor conduct on-site acceptance. The materials to be inspected are designated by the supervisor, and the samples are sent for inspection according to the requirements of the specification to prevent the use of unqualified materials.

5, finished product protection, while paying special attention to the engineering quality, focus on the finished product protection of internal and external wall coatings, doors and windows and other engineering parts, and reduce the quality defects caused by human factors to a minimum.

Third, civilized construction.

Strengthen the three-level safety education for all employees on site, make them consciously abide by various safety production rules and regulations, eliminate hidden dangers of accidents, and lay a good foundation for the smooth completion of this project. There are no quality accidents and safety accidents in this project.

Fourth, the quality inspection and self-evaluation of divisional projects.

(1) Concealed works

1. Division quality self-evaluation: there are 36 inspection lots for the first floor circuit part, the hidden keel part, the second floor electrical part and the hidden keel part. All qualified, the relevant quality information is complete, and the enterprise self-evaluation is qualified.

(2) Perception part

1. Division quality self-evaluation: there are 6 subprojects, namely, floor tile 1, stone 1, latex paint 1, and 88 inspection lots. All qualified, the relevant quality information is complete, and the enterprise self-evaluation is qualified.

In the process of installation engineering construction, relevant construction specifications shall be strictly implemented, and all materials shall be delivered to the site and submitted to the supervisor for acceptance. After the acceptance of each working procedure, the next working procedure is entered, the completion data is complete, and the project quality self-evaluation is qualified.

V. Quality Assurance Information

1, 10 copies of cement factory certificate, and the test reports of various specifications and models are complete and qualified;

2. 17 copies of mortar mixture ratio test report, of which 17 copies are qualified.

3. Mortar block test report 12 copies, qualified 12 copies.

4, joinery board factory certificate 3 copies, test report 3 copies, qualified 3 copies;

5, gypsum board factory certificate 4 copies, 4 copies of test report, 4 copies of qualified;

6, engineering data and construction progress synchronization, concealment acceptance data is complete.

Six, the unit project quality self-evaluation.

The self-evaluation of unit engineering quality inspection is good, and the self-evaluation of unit engineering quality is qualified. The above is my construction unit's report on the completion of the project, but there are some deficiencies in our technical level and understanding, and there will inevitably be some deficiencies in the project construction. Please criticize and guide the leaders of experts so that we can correct them and do better in the future. Thanks for shooting!