Tianshui high-speed railway station 24-hour consultation telephone

093 1-95 105 105。

Tianshui station was built in 1945, and its housing reform and expansion project started in September of 20 16. The renovation project was completed and put into operation on October 30th, 20 18/KLOC-0.

As of June 20 18, Tianshui Station has a building area of 109 16 square meters and a waiting room of 3,000 square meters, which can accommodate 20,000 passengers. The scale of Tianshui Station is 3 stations and 6 lines.

Precautions:

The reconstruction design of Tianshui Station adheres to the concept of "restoring old buildings to preserve urban memory, expanding the volume to live in harmony with old buildings, simplifying streamline and improving the quality of internal space", and shows Tianshui local culture and Tianshui Station culture in the shaping of external modeling and internal space.

According to official website, China Railway Lanzhou Bureau Group Co., Ltd. in June, 2065438+09, Tianshui Station is divided into No.1 yard and No.2 yard, which belong to the two-level to three-level series layout. There are three freight yards in the east, west and north, with arrival and departure lines 14, 9 marshalling lines and special freight yard lines 15.

Reference to the above content: Baidu Encyclopedia-Tianshui Station