Three Personal Reports of Senior Engineers

Senior engineer's personal debriefing report refers to the staff of various organs at all levels, and generally makes statements for business departments, mainly focusing on the main performance business, with less statements for functions and management departments. It is mainly for subordinates to state their positions to superiors, competent departments and subordinates, including achievements, shortcomings and ideas in performing their duties and tasks, as well as written reports of self-review, evaluation and appraisal. This article is three model articles of my personal senior engineer's debriefing report for your reading.

Senior engineer's personal debriefing report has been engaged in construction since he joined the work. From budget to construction site, from participating in technical work to presiding over construction, we finally combined the learned professional knowledge with practical experience in our work and successfully designed several projects. On the one hand, my work achievements have been recognized by leaders and colleagues. On the other hand, I am deeply in love with this line.

When I first joined the work, the leader arranged the budget work. I used this time to familiarize myself with the drawings and recall the materials taught by the school teachers. Concretize an abstract theory. In just two months, the works are colorful. Because I basically understood the designer's intention, I remembered the drawings after reading them several times. The quota was used reasonably and the calculation was accurate. Two months later, the leader trusted me and asked me to work on the construction site.

Starting from the most basic level, I studied hard and humbly asked experienced engineers and old workers, which greatly improved my practical work potential. In 20xx, when the company was working on the comprehensive building project of Kaiping building materials market, I took a worker to be fully responsible for the setting-out work of the project and made the budget of water, heating and electricity for the project. I usually work hard, master a lot of basic knowledge, and also determine my position among the company's technical personnel. In the second half of 20xx, when the company was doing the aquatic products wholesale market in Nanxindao, Tangshan, I became the head of plumbing technology and participated in the civil engineering technical work. Due to the tight construction period and imperfect preliminary design, I boldly innovated and put forward my own views and opinions, which were affirmed by the representatives of Party A and the owners. So I was commissioned to do most of the later design. My technical experience has increased rapidly in this project.

In 20xx, the company disintegrated for various reasons, so I applied for a job in Tangshan Sanyou Group Jidong Chemical Co., Ltd., and previously worked in the Infrastructure Department as the representative of Party A to supervise the construction quality of various construction teams. I went deep into the construction site, strictly checked, used my spare time to strengthen my theoretical knowledge, summed up the previous work, and got a deeper understanding of the construction industry. At the same time, I presided over the design and construction of the whole company's plumbing renovation, participated in the design of the company's frozen circulating water, and the project was successfully constructed, which brought huge economic benefits to the enterprise. According to the accounting of the company's enterprise management office, only one water heating renovation will save the company 65,438+10,000 yuan every year.

In 20xx, the leader put me in charge of the company's infrastructure team. Infrastructure team 150 people, basically covering all temporary employment of the company, responsible for internal infrastructure construction and equipment maintenance. After I arrived, I quickly became familiar with my work and quickly entered the leading role. Successfully completed more than ten overhauls organized by the company. In recent years, the company has many technical transformation, technical measures and expansion projects. I led the infrastructure team to complete several major renovation projects, such as new refrigeration project, new fractionation project, new polymerizer project, new drying project, new 42% alkali project and new rectification project. After the completion of the project, all qualified, get the praise of colleagues and company leaders.

Autumn 10 is the harvest season, and I am facing new challenges. The company will build a new oxygen and nitrogen production workshop, and at the same time, several units will be moved to a new location, and the construction period is very tight. But I am not afraid, but I am happy to meet it, because this is my favorite job, my career and my tomorrow!

Personal debriefing report of senior engineer 2 1. As a budget officer of the project department, I can complete the operation and management of the project department on time according to the rules and regulations of the company and the project department.

1, internal working condition. According to the requirements of the company, the actual construction output value and cost analysis of the month are counted at the end of each month. Participate in the cost analysis meeting in time, make an analysis report on the monthly profit and loss of the project department, prepare the budget for the construction stage according to the actual situation of each sub-project on each floor, print all the quantity analysis, and distribute it to the production manager as quota labor and quota materials. In the actual construction process, according to the actual situation on site, the quantity and content of the quota are adjusted scientifically and reasonably as the basis for manual control and distribution of the engineering task list, and the quota materials are used as the warehouse of the quota. Usually, I have been cooperating with the project manager in contract management, participating in some subcontracting negotiations, and drafting some subcontracting contracts according to the company regulations and the actual situation of the project department. After the subcontract is signed, I will track and manage the subcontract, complete the actual construction work of the project department last month (including the rough work of subcontractors) at the beginning of each month, count the quota materials, submit relevant reports to the company, submit the main material plan for next month to the company at the end of each month, and estimate the construction output value of next month. In the construction process, the quota acquisition and cost tracking control are implemented, which brings some reasonable safeguard measures for the cost control of the project department, brings some business information and data to the project department in time, and completes the project cost accounting in time. Attend project meetings on time and be on duty according to company rules and regulations.

2, foreign (to the owner and supervision) working conditions. Submit the construction progress report to the owner and supervisor at the end of each month as the basis for paying the project progress payment, check the engineering quantity with the investment supervisor in time, and cooperate with the project manager to urge the owner to pay the project progress payment last month after the progress output value is determined. Issue the project visa to the owner in time, do a good job in claiming compensation for some projects, and quote some engineering materials to the owner and supervisor in advance, so that after the owner's review, our construction material engineer can purchase them in time and make the project smoothly constructed.

In a word, income and minimum expenditure are part of enterprise policy. Internal work should be timely, accurate and realistic, grasp the quota, control the quantity, and sometimes leave the necessary allowance; Foreign work information is complete, make full use of policies and opportunities, always handle the relationship between the owner, the supervisor and the contractor, and sometimes encounter some work difficulties, contact the leaders in time to report, so as to better solve the problems and strive for profits for the company.

Second, do a good job in project audit.

We have completed the settlement of Xiangyin Road and the audit of Yuqiao Garden.

Third, obey the work arrangement of the company leaders and do a good job outside the project department.

I always put the overall situation first in my work. Participate in the bidding work and other budget work of the company with your heart. No matter how busy I am in the project department, I always obey the work arrangement of the company leader. At that time, there were many events in the project department, so I always worked overtime and used my time reasonably and scientifically, which not only completed my own events, but also completed the tasks arranged by the company.

Fourth, adapt to and abide by the reform of the company's various management systems, and further strengthen the sense of responsibility.

Since the beginning of this year, the company's rules and regulations have been improved or further improved. I always adapt to this situation with my heart, strengthen my sense of responsibility, do my work well in time and try my best to serve the enterprise on the basis of the current rules and regulations of the company and the professional ethics of budget officers.

Fifth, use the rest time after work to strengthen study.

Usually, we should pay attention to collecting the current quota documents in Shanghai and strengthen the study of business knowledge such as engineering quantity calculation skills. Study computer knowledge hard to improve my work efficiency.

The above is a rough summary of my personal work, please review it. If there are any shortcomings in my work, please point them out so that I can correct them in time and work better.

According to the division of labor, my main work is project technology, experiment, science and technology, quality management and participation in project construction management. Over the past year, under the correct leadership of the Party and government of the Project Department, with the support and help of leaders and comrades, I have been able to perform my duties conscientiously, be loyal to my duties and work pragmatically, and have made remarkable achievements in implementing strategies, strengthening the construction of technical management potential, scientific and technological work, and gold project construction, and successfully completed various tasks assigned by the Party and government of the Project Department. The work in the past year is briefly described as follows, please review it.

First, strengthen learning and improve the level of policy theory.

In this paper, the central group of the Party Committee of the project focuses on learning and self-study in spare time, and mainly systematically studies the spirit of the xx report and the Fifth Plenary Session of the xx session, and writes some experiences. Over the past year, with the company party Committee? Keep improving? Activities, with the spirit of the company party Committee activities as a weapon, come? Strive for Excellence? With this as the goal, we will participate attentively, strive for excellence, promote scientific development, form a good atmosphere of party member taking the lead, full participation and continuous improvement, and drive all construction departments and teams of the project department to devote themselves to excellence and do great things, ensure the construction period, strengthen construction and promote development. In the work, the center of gravity moves down, the leader moves down, the details move down, and ideological problems, problems and details are solved.

Put the cause first, work hard, strengthen study, and contribute to the development of the enterprise. I talked with the leaders of the project department and the construction team, talked about responsibilities, handed in tasks, and pressed the burden, which achieved cohesion, carefully formulated the working ideas of the 150-day battle, clarified the reward and punishment measures, and refined the construction tasks and time limit; Formulate and strengthen the management of publicity information report to reflect the progress of the project in a timely manner; Strengthen dispatch and command, and give full play to the overall advantages; Storm key points to ensure the completion of the task; Take a multi-pronged approach, work together, strive to tap the internal potential and enrich the construction strength; Optimize the construction of key projects and formulate specific countermeasures such as construction plans. At the same time, it is reiterated that we should strengthen labor discipline and strictly implement the leave system. During the war, no vacation is allowed without special circumstances. Leaders, departments and employees should go deep into the construction site and command from the front. In wartime, we should correctly handle the relationship between safety and progress, safety and quality, cost and benefit, resolutely implement the responsibility system for safety and quality leadership, consolidate the foundation of safety and quality, carry out rectification of potential safety hazards, and do a good job in safety and quality work on the construction site.

Effectively change the style of work, work hard, establish a sense of responsibility, urgency and crisis, and enhance the sense of service. Three highs? With the guiding ideology as the direction, excellence as the driving force, give full play to the leading role of party member V, and do a good job in safety, quality, image progress, civilized construction and site management in an all-round way in strict accordance with the overall working ideas of the project department. In urgent, difficult, dangerous and heavy engineering construction, improve the team's organization and coordination potential and effectively solve the problems on the construction site; Strengthen management in quality and safety management, civilized construction of environmental and water conservation, tests, indoor materials, etc., take the lead, face up to difficulties, stand on the post, strive for Excellence, strive to be a pioneer, and strive to overcome key difficulties in construction production with the goal of ensuring time limit, safety, quality, quality and reputation, so as to ensure excellent engineering quality, no accidents in safe production, no delay in contract period, high quality and high efficiency. Strive for excellent political quality, job skills, work performance and public evaluation? Four excellent? * Members.

Two, 20xx years of hard work, practical work, and constantly enhance their own execution.

Over the past year, I have focused on the overall situation, made overall plans, made reasonable arrangements, carefully coordinated the relations between all levels and departments, been a good staff assistant to the principal responsible comrades, and promoted the orderly development of all the work in charge.

1。 Strengthen cultivation, strive for high-quality projects and make historic breakthroughs. According to the arrangement of the project party and government, I will work with the Safety and Quality Department to create excellent projects. Comrades from the Safety and Quality Department and I have carefully analyzed the situation of our project department, determined the key points of striving for Excellence, established the technical innovation system of the project, improved the quality assurance system and improved the application materials by relying on assistance and careful cultivation. In order to strive for the high-quality project of Beijing Great Wall Cup, I went to the Rail Company and the Construction Committee several times with the heads of relevant departments to publicize and promote the high-quality project of our project department to the leaders of Beijing Construction Industry Association. At the same time, leaders of the Association were invited to our project for investigation and guidance, and visited the construction site for many times, which further deepened the superior leaders' intuitive understanding of the project status and declared high-quality projects for the project? Pave the way? . After scientific training and hard work, Chengnan Station? Beijing Structural Great Wall Cup Quality Project? Title, ranking 1 in the whole bank, has been praised and rewarded by leaders at all levels.

2。 Strengthening infrastructure construction and promoting subway safety risk monitoring system have made gratifying achievements. First, the construction of emergency headquarters was completed. According to the arrangement of the party and government of the project department, the investment is nearly 2 million yuan, and a scientific and reasonable emergency command safety risk monitoring system with high definition of video images is built, which integrates video alarm, emergency command and video supervision demonstration, and realizes the docking of video monitoring with the emergency command center of the rail company, which has been affirmed by leaders at all levels. The second is to do a good job in the technical support of the mountain safety risk supervision information system and build a technical platform. Organize training on the maintenance and use of the software system for the relevant regional directors of the project department, so that the regional directors of the project department can master the use skillfully. The third is to complete the construction of video surveillance system with high quality. In order to speed up the construction of our department's video surveillance system, we have coordinated and communicated with the video system suppliers for many times, and went to the project department for on-the-spot investigation with the technicians of the video system suppliers to understand the current situation of the existing surveillance system. Combined with the actual situation of this department, the appropriate network access scheme is formulated, and the work arrangement and task division are defined. Fourth, strengthen monitoring and measurement management, upload monitoring data in time, and handle alarm points in time.

3。 Strengthen scientific and technological innovation, and build the potential of scientific and technological innovation to a new level. First, innovate the work concept and promote the performance-oriented operation of technical departments and laboratories. In order to further expand the business scope of technical departments and laboratories and better meet the needs of the project, the application of technical performance knowledge to the development of technical departments and laboratories was formally put forward for the first time, which injected the concept of technical performance into technical departments and laboratories and played a role in attracting jade. Taking this as an opportunity, the laboratory has increased its cooperation with outsourcing testing units, and made major breakthroughs in business volume and business performance. Second, strive for financial support attentively to improve the potential level of technical departments and laboratories of our project department. The third is to build a scientific research platform and encourage independent innovation. With everyone's efforts, we organized and compiled a lot of technical summaries, which were recognized and praised by leaders in the technical exchanges of brother units.

4。 Strengthen the organization, carefully prepare and successfully complete the acceptance work. Carefully clean up all the completion acceptance data to ensure that the completion acceptance data is put into storage on time. On February 5th, 20xx, the main structure of Chengnan Station passed the pre-acceptance; on August 3rd, 20xx, it passed the mutual inspection of the engineering and technical risk prevention work of the rail company; on September 5th, 20xx, the main structure of Chengnan Station was renovated; the main structure and evacuation platform between Chengnan Station and Gaoyueyuan Station passed the pre-acceptance; and on June 65438+ 10/7, the substation and traffic facilities passed. 20xx65438+1October 26th, Chengnan Station passed the pre-completion acceptance, 20xx165438+1October 7th, and the civil air defense project passed the pre-acceptance, 20xx165438+1October 9th. 20xx 165438+1October16 passed the pre-completion acceptance, 20xx165438+1June passed the retest, and 20xx1.

5。 Strengthen coordination, elaborate organization, strictly control the project cost, and ensure that the project produces benefits and talents. I visited the supervisor, designer and owner for many times, organized the contract department, engineering department and other departments to complete the engineering design change and negotiation 10 on time, and improved the relevant signing procedures. Strengthening the training and management of technical cadres has guided many interns, and now many of them have grown into technical backbones.

6。 Strengthen leadership and be responsible for project quality. Around the key work of the project department, various learning activities were carried out, which comprehensively improved the overall quality and professional level of cadres and workers. At the same time, the external coordination has been strengthened, and the cooperation with outsourcing testing units has been strengthened, and the laboratory level has been greatly improved.

Mainly to grasp the progress of the project, control the quality of the project, and cooperate with the deputy manager to grasp the safety production management of the construction site.

The project construction in 20xx entered a critical period. Whether the project can be completed on schedule is the primary problem for every builder. As the chief engineer, we should keep abreast of the progress of the project and strictly control the quality to ensure the smooth progress of the project.

At work, I can improve my sense of service, give advice to the construction team, find ways, combine the engineering practice, adopt reasonable and advanced construction technology, and speed up the construction progress. The management level, technical potential and personnel quality of the construction team are not very high. The potential to solve problems and deal with emergencies is not strong. At the construction site, we will study together when we encounter problems, brainstorm and find ways.

There are many uncertain factors in underground excavation, and landslides and water inrush often occur. I often go deep into the construction site and patrol the construction site with engineers every day to master the situation of each point. Find problems, deal with them in time, and report to the leaders in time if they can't be handled. For emergencies such as landslide treatment, I can go to the site in person, check the situation, study with the supervision, geology and ZuoYeDui on the spot, formulate the construction plan and supervise the implementation. Simplify the examination and approval process and speed up the construction.

There are many working faces in Changping line, and there are insufficient management personnel in the early stage. Most of the workers in the ZuoYeDui are migrant workers with poor quality awareness. In pursuit of progress, quality is easily overlooked. I will go into the cave with engineers and supervisors to check the quality and strictly control the quality. Unqualified products are not allowed to be transferred. Joint acceptance system is implemented for key working procedures and concealed works to ensure the quality of the whole project, so that the quality of the project is always under control. According to different construction stages, the key points of quality control should be determined in time. I organized technical cadres to learn concrete construction specifications and anchor spray specifications. Pre-job training was also organized. The work and specific index requirements for preparation, inspection and acceptance before, during and after support are defined. So as to ensure the smooth development of quality control projects. In the underground excavation of tunnel, it is difficult to control the plane and elevation, so the survey work is very important. We require the ZuoYeDui to carry out the construction in strict accordance with the specifications and detailed rules. Due to strict requirements and proper control, tunnel excavation is progressing smoothly. After penetration, the horizontal penetration error is 52mm, which is within the specification requirements (100 mm); The vertical penetration error is 32mm, which is also within the specification requirements (50mm). The survey ensures the smooth connection between the project progress and the whole project. Winter construction measures are an important guarantee for concrete construction quality. I organized the formulation of winter construction measures and strictly implemented them. Before reaching the winter construction standard, no construction shall be carried out, and the construction period and economic losses caused thereby shall be borne by you. This ensures the quality of concrete construction in winter.

Due to the lack of engineering cost surveyors, coordinate the engineering department to participate in the contract department. The data, engineering quantity, unit price and cost of the changed project can be reasonably and legally audited, with sufficient evidence and complete procedures. Before the monthly valuation and payment meeting, I and the personnel of the engineering department and the contract department carefully reviewed the engineering quantity to ensure the accuracy, and then reported the research situation at the meeting.

7。 Staff night school and technical cadre training

The technical personnel in the project department are in the majority, so it is very important to do a good job in science and technology and social work and mobilize the enthusiasm of technical personnel for the smooth development of the project. Party and government leaders attach great importance to science and education. At the beginning of this year, I organized a study meeting on stent technology. Before the meeting, I worked with relevant personnel to determine the location, number of people and agenda. And organized a number of technical cadres to go out to visit and study, and used the night school of employees to preach the important and difficult technologies in construction to the technical cadres many times, and asked the technical cadres to write their experiences. Technical competitions were also held to reward the excellent and punish the poor, which mobilized the intention of technicians and put them into scientific research.

Third, keep a clear head, establish a good image of honesty, strengthen the construction of its own clean government, and consciously understand the supervision of the masses.

I cherish what I have at this moment. I want to create a safe and calm environment for my family and myself. Therefore, through the education and self-study of the Party committee and the leading group, I can be honest and self-disciplined, and maintain a good image of honesty and integrity in strict accordance with the requirements of the code of conduct for cadres in party member and provincial organs.

In order to implement the provisions of the party's work style and clean government, set an example, take the lead in setting an example, and insist on doing what others ask. I have to do it first, and I won't do it first if I'm told not to. Earnestly abide by the system of leading cadres' income declaration, gift registration and personal major events reporting. In daily work and life, pay attention to start from scratch and exemplary implement the company's various rules and regulations. In terms of receiving visitors, inspecting and guiding grassroots work. Take the lead in severely stopping public funds from eating, drinking and giving gifts. Consciously understand the supervision of the broad masses of cadres and all walks of life, pay attention to heart-to-heart communication with the broad masses of workers, and solicit opinions and suggestions on their own and unit work.

Four. 20xx work prospect and future work direction

Over the past year, with the care and support of the superior leaders and the help and cooperation of everyone, the work of the whole year has been successfully completed, mainly thanks to the meeting: first, the leaders attached great importance to and strongly supported it, and second, the joint efforts of various departments and related employees. Although all the work has achieved necessary results, there are still many gaps and some problems and deficiencies compared with the requirements of superiors and everyone's expectations. Mainly at present: the degree of ideological emancipation is not enough, and the sense of innovation needs to be further strengthened; The coordination of all units and departments is not strong enough; In the future, I will further strengthen my study, improve my political literacy and theoretical level, overcome existing difficulties and shortcomings, work hard and forge ahead with a strong sense of professionalism and responsibility, and make new contributions to the technical research of our company.