Introduction of construction projects?

The Project Bidding Model was compiled by Zhong Da Consulting Company in combination with the actual situation and many other articles, as follows.

Construction project demonstration tender

According to the requirements of the bidding documents and design drawings of XX construction project, our construction company is fully qualified for contracting construction and decided to bid for this project. Details are as follows:

I. Comprehensive explanation

Project description: (project name, area, structural type, height and number of floors, equipment) A training building with a construction area of 1.66 million square meters, with six main floors and two local floors. Frame structure: the total length of the building is 88m, the width is 46m, the main building is 32m, and the second floor is 10m. The foundation system is piling water and slurry pouring beam eucalyptus board. Glass mosaic is pasted outside the powder. The floor is terrazzo and the classroom is stepped. Individual rooms are air-conditioned.

II. Price: (omitted)

Three. Main material consumption indicators: (omitted)

4. Total price: 8648 165.69 yuan, and the cost per square meter is 666.66 yuan.

Verb (abbreviation of verb) duration: commencement date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Completion date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Construction days: 666 days

Progress of intransitive verb project planning: (omitted)

Quality assurance: comprehensively strengthen quality management and strictly operate procedures; Strengthen the inspection and acceptance of all kinds of subdivisional work. If the previous program is not accepted, the next program will never be started; Strengthen on-site leadership, carefully keep all kinds of design, construction and test data to ensure excellent project quality.

8. Main construction methods and safety measures: install 1 tower crane and 2 cranes to solve vertical and horizontal transportation; Adopt plane running water and interchange construction; The key process adopts continuous shift operation; Adhere to civilized construction to ensure construction safety.

Nine. Requirements for the tenderee: The temporary facilities provided by the tenderee cover an area of 66, and we will use them reasonably.

Ten, adhere to the principle of thrift, as far as possible to eliminate waste.

Bidder: _ _ _ _ _ _ _: Person in charge: _ _ _ _ _ _ _

Tel: _ _ _ _ _ _ _: Fax: _ _ _ _ _ _ _: Telegraph: _ _ _ _ _ _ _ _ _

The model essay of project bidding is only a reference, which should be combined with the actual bidding demand. The above contents are provided by Zhong Da Consulting Company.

For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.